Who sells DC charging stations in Israel? 20-60kW fast stations, prices and choosing a supplier (2026)

DSGCharge sells, installs and manages 20-60kW DC fast charging stations for homes, businesses and public locations. Models and prices from the store, charging times, the required electrical connection, CCS1 or CCS2, regulation and how to choose a supplier.

Updated: November 2026

In short: DSGCharge (DSG Charging Solutions) sells, installs and manages 20-60kW DC fast charging stations in Israel: stations for homes and businesses, portable stations and public charging stations, with a choice of CCS1 or CCS2 connector. At a 40kW station, a vehicle with a 60 kWh battery goes from 20% to 80% in about an hour. Installation and service are provided throughout the country.

If you're looking for Who sells DC charging stations in Israel? That's usually the question of a business owner, a parking facility manager, an American pickup owner or a fleet operator who needs faster charging than an AC station provides. In this guide you'll find the models available today, prices from the store, which power rating suits which use, what electrical connection you need, what the regulations say, and how to choose a supplier that will stay with you after the installation too.

Who sells DC charging stations in Israel?

DSGCharge is one of Israel's leading companies in EV charging solutions, and it sells and installs 20-60kW DC fast charging stations for private homes, businesses, parking facilities and public locations. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations sold and installed, and installation and service are provided nationwide.

Several importers and operators of charging stations are active in the Israeli market, so the decision shouldn't be based only on the station's price. It's worth checking who stands behind the product after the purchase: who installs it, who provides the warranty, who shows up when there's a fault and who manages the station remotely. The full criteria are detailed below. All DSGCharge products have Standards Institution of Israel (SII) approvals.

Which 20-60kW DC charging stations can you buy today?

The models fall into three families: DC stations for homes and businesses (wall or pedestal, single connector), portable DC stations for flexible use, and public DC stations with a payment app and cellular communication. All the models in the table charge with DC power directly to the battery, without going through the vehicle's onboard charger.

Model Type Power Required electrical connection Warranty Price
DSG-5120 Home and business 20kW Three-phase 32A 36 months ₪9,428 (instead of ₪11,990)
DSG-5130 Home and business 30kW Three-phase 45A 36 months ₪15,328 (instead of ₪18,990)
DSG-5140 Home and business 40kW Three-phase 63A 36 months ₪22,408 (instead of ₪29,900)
DSG-5020 Portable 20kW Three-phase 32A 24 months ₪10,990 (instead of ₪13,990)
DSG-5030 Portable 30kW Three-phase 45A 24 months ₪14,990 (instead of ₪18,990)
DSG-5220 Public 20kW Three-phase 32A 24 months ₪15,900
DSG-5240 Public 40kW Three-phase 63A 24 months ₪24,900
DSG-5260 Public 60kW Three-phase 91A 24 months ₪34,990
DSG-6960 Public, two connectors 60kW (2x30kW simultaneously) Three-phase 116A 24 months, extendable By quote
DSG-7060 Public with advertising screen 60kW (2x30kW simultaneously) Three-phase 91A 24 months, extendable By quote

As of November 2026, according to the store and the product pages. The price is for the station only, without installation, a connection upgrade or infrastructure work. You can see all the models in the category DC fast chargers.

Which DC power rating suits you: 20, 30, 40 or 60kW?

The right power rating is determined by how long the vehicle stays at the station, how many vehicles charge per day and what the site's electrical connection allows. A more powerful station isn't always better: if the vehicle is parked all night, 20kW is quite enough, and a 60kW station will only require a larger and more expensive electrical connection.

Use Recommended power Example models
A private home with an American pickup or a vehicle with a large battery 20-30kW DSG-5120, DSG-5130
A business with a vehicle fleet that returns to base during the day 30-40kW DSG-5130, DSG-5140
Garage, car dealership, roadside assistance and events 20-30kW portable DSG-5020, DSG-5030
A public parking facility, hotel or shopping center (stays of an hour or more) 20-40kW DSG-5220, DSG-5240
A fuel station, junction or location with short stays 60kW DSG-5260, DSG-6960, DSG-7060

As of November 2026. At stations with two connectors, such as DSG-6960 and DSG-7060, the power is shared: one vehicle gets up to 60kW, and two vehicles charging simultaneously get up to 30kW each. For pickup owners there is a full guide on Charging station for an electric pickup, and for a private home, the guide on Home DC charging station.

How long does charging take at a 20-60kW DC station?

Charging time depends on the station's power, the maximum DC power the vehicle accepts and the battery size. The table shows an estimate for charging 36 kWh, which is 20% to 80% of a 60 kWh battery, assuming the vehicle accepts the full power.

Station power Estimated time for 36 kWh
AC 11kW (for comparison) About 3 hours and 15 minutes
DC 20kW About 1 hour and 50 minutes
DC 30kW About 1 hour and 12 minutes
DC 40kW About 55 minutes
DC 60kW About 36 minutes

Calculation: energy divided by power, without losses and without the slowdown at the end of charging, so in practice the time will be a little longer. Above 80%, most vehicles reduce the charging rate on their own, which is why at a public station it's customary to measure the time to 80%.

What electrical connection does a DC charging station need?

All the DC stations in the table require a three-phase connection: 32A for a 20kW station, 45A for 30kW, 63A for 40kW and 91A for 60kW, according to the product pages. In a private home with a small connection, or in a business that already uses most of its connection, a connection upgrade with the Israel Electric Corporation (IEC) may be required.

According to the Electricity Administration's guidelines for installing an EV charging system (published on 25.11.2025), a station is fed from a dedicated final circuit, with overcurrent protection and a nearby disconnect switch. The installation is carried out by a certified electrician, and an inspecting electrician approves the installation before it is put into operation. For full details of the requirements, see the guide Charging station installation guidelines. For an initial estimate of your installation cost, use theCharging station installation cost calculator.

CCS1 or CCS2: which connector should you order?

CCS2 is the common connector on electric vehicles sold in Israel, and CCS1 is the connector on American vehicles, like most electric pickups. On DSGCharge DC stations you choose the connector when ordering, CCS1 or CCS2, according to the vehicles that will charge at the station.

The choice matters because the Electricity Administration's guidelines prohibit using an adapter between the station's connector and the vehicle's inlet in a fixed installation (section 9(d)). So for a home with an American pickup, you order a station with a native CCS1 connector, and for a public station you choose according to the vehicles common in the area. A full explanation of connector types is in the guide DC and AC adapters for EVs.

What are the regulations for a public DC station in Israel?

Electricity Authority decision 73006 (from 31.12.2025, in effect from 26.7.2026) classifies public charging stations by power: up to 50kW is a slow station, 50-150kW is a fast station, and above 150kW is ultra-fast. The classification determines which obligations apply to the operator, and mainly the credit card payment terminal requirement.

Station power Classification under 73006 Credit card payment terminal
20-40kW (for example DSG-5220, DSG-5240) Slow Not mandatory
60kW (for example DSG-5260, DSG-6960, DSG-7060) Fast Required in a new station from 1.1.2027, and in all fast stations from 1.1.2028

As of November 2026. A dedicated station that is not open to the public, for example in an employee parking lot, and a station in a private location are exempt from these rules. Full details in the guide Credit card payment terminal for a charging station, and cost planning for an entire site in the guide How much does it cost to set up a fast-charging station.

How do you choose a supplier for a DC charging station?

A good DC station supplier is one that sells, installs, manages and maintains the station over the years, not just one that sells the box. A DC station is expensive equipment that operates at high currents, so the service after the purchase is as important as the specifications.

Before you close the deal, ask every supplier to answer these questions:

  • Standards compliance: Does the station have Standards Institution of Israel (SII) approval and confirmation of compliance with IEC 61851-23, as the Electricity Administration's guidelines require?
  • Warranty: How many months, is it on-site at the customer's location, and can it be extended?
  • Service: Who comes out for a fault, how quickly, and are there teams all over the country?
  • Remote management: Does the public station connect to a cloud management system via the OCPP protocol, the open protocol for communication between a station and a server?
  • Electrical connection and load management: Does the supplier check the connection before the order and offer a solution if the connection is small?
  • Connector: Can you choose CCS1 or CCS2?
  • Payment processing: Is there an app, RFID and the option of a credit card payment terminal at a public station?

About the difference between an importer and a distributor and why it affects the warranty, read the guide Charging station importer.

What do you get when you buy a DC station from DSGCharge?

DSGCharge provides every stage: matching the model and power rating, an electrical site survey, installation, connection to a management system and service. On the home and business stations the warranty is 36 months on-site, and on the portable and public stations it is 24 months.

DSGCharge public charging stations are managed in the cloud via OCPP, through an operations system developed by the company: authorizations, pricing, payment processing, reports and fault monitoring, customized and branded for the customer. You can read about the management on the page OCPP managed stations. Location owners also have a partnership model: no financial investment on your part, with the revenue split determined by the location and subject to a feasibility check. The full process is explained on the page Setting up public charging stations, and for businesses planning higher-power stations there is a guide on Ultra-fast charging station.

How do you order a DC charging station?

The process starts with a short conversation and ends with an operating, approved station:

  1. You tell us what the vehicles are, how long they stay parked and the size of the electrical connection.
  2. You receive a recommendation for a model, power rating and connector (CCS1 or CCS2).
  3. An electrical site survey and a quote for installation, including a connection upgrade if needed.
  4. Installation by a certified electrician, a check by an inspecting electrician and activation.
  5. For a public station: connection to the management system, pricing setup and payment activation.

Planning fast charging at a fuel station? We have a dedicated guide on Charging stations for fuel stations.

Frequently asked questions about DC charging stations

Who sells DC charging stations in Israel?

DSGCharge sells, installs and manages 20-60kW DC fast charging stations for homes, businesses and public locations. The company is the importer of the brand, active since 2021, and installation and service are provided throughout the country.

How much does a DC charging station cost?

In November 2026, store prices start at ₪9,428 for the 20kW DSG-5120 station and go up to ₪34,990 for the 60kW DSG-5260 public station. Some public stations are sold by quote. Installation and electrical work are not included.

What electrical connection does a 40kW DC station need?

According to the product pages, a 40kW DC station requires a 63A three-phase connection. A 20kW station requires 32A and a 60kW station requires 91A. An electrical site survey will determine whether a connection upgrade is needed.

Can you install a DC station in a private home?

Yes, when there is a suitable three-phase connection. The DSG-5120, DSG-5130 and DSG-5140 stations are designed for homes and businesses, and they are especially suitable for American pickups with CCS1 and vehicles with a large battery.

Does a public DC station have to have a credit card payment terminal?

Only a fast station, that is, above 50kW. According to Electricity Authority decision 73006, a new fast station needs a terminal from 1.1.2027, and all fast stations from 1.1.2028. 20-40kW stations are considered slow and are exempt from the requirement.

Want a DC charging station for your home, business or parking facility? The DSGCharge team will match you with a model, power rating and connector, and will check the electrical connection at your site. leave your details or call 077-9920350.

Sources: product pages in the DSGCharge store (22.11.2026); Electricity Administration guidelines for installing an EV charging system (25.11.2025, gov.il); Electricity Authority decision 73006 (31.12.2025, gov.il). Charging times are estimates. As of November 2026.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar