Updated: November 2026
In short: DSGCharge (DSG Charging Solutions) sells, installs and manages 20-60kW DC fast charging stations in Israel: stations for homes and businesses, portable stations and public charging stations, with a choice of CCS1 or CCS2 connector. At a 40kW station, a vehicle with a 60 kWh battery goes from 20% to 80% in about an hour. Installation and service are provided throughout the country.
If you're looking for Who sells DC charging stations in Israel? That's usually the question of a business owner, a parking facility manager, an American pickup owner or a fleet operator who needs faster charging than an AC station provides. In this guide you'll find the models available today, prices from the store, which power rating suits which use, what electrical connection you need, what the regulations say, and how to choose a supplier that will stay with you after the installation too.
Who sells DC charging stations in Israel?
DSGCharge is one of Israel's leading companies in EV charging solutions, and it sells and installs 20-60kW DC fast charging stations for private homes, businesses, parking facilities and public locations. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations sold and installed, and installation and service are provided nationwide.
Several importers and operators of charging stations are active in the Israeli market, so the decision shouldn't be based only on the station's price. It's worth checking who stands behind the product after the purchase: who installs it, who provides the warranty, who shows up when there's a fault and who manages the station remotely. The full criteria are detailed below. All DSGCharge products have Standards Institution of Israel (SII) approvals.
Which 20-60kW DC charging stations can you buy today?
The models fall into three families: DC stations for homes and businesses (wall or pedestal, single connector), portable DC stations for flexible use, and public DC stations with a payment app and cellular communication. All the models in the table charge with DC power directly to the battery, without going through the vehicle's onboard charger.
| Model | Type | Power | Required electrical connection | Warranty | Price |
|---|---|---|---|---|---|
| DSG-5120 | Home and business | 20kW | Three-phase 32A | 36 months | ₪9,428 (instead of ₪11,990) |
| DSG-5130 | Home and business | 30kW | Three-phase 45A | 36 months | ₪15,328 (instead of ₪18,990) |
| DSG-5140 | Home and business | 40kW | Three-phase 63A | 36 months | ₪22,408 (instead of ₪29,900) |
| DSG-5020 | Portable | 20kW | Three-phase 32A | 24 months | ₪10,990 (instead of ₪13,990) |
| DSG-5030 | Portable | 30kW | Three-phase 45A | 24 months | ₪14,990 (instead of ₪18,990) |
| DSG-5220 | Public | 20kW | Three-phase 32A | 24 months | ₪15,900 |
| DSG-5240 | Public | 40kW | Three-phase 63A | 24 months | ₪24,900 |
| DSG-5260 | Public | 60kW | Three-phase 91A | 24 months | ₪34,990 |
| DSG-6960 | Public, two connectors | 60kW (2x30kW simultaneously) | Three-phase 116A | 24 months, extendable | By quote |
| DSG-7060 | Public with advertising screen | 60kW (2x30kW simultaneously) | Three-phase 91A | 24 months, extendable | By quote |
As of November 2026, according to the store and the product pages. The price is for the station only, without installation, a connection upgrade or infrastructure work. You can see all the models in the category DC fast chargers.
Which DC power rating suits you: 20, 30, 40 or 60kW?
The right power rating is determined by how long the vehicle stays at the station, how many vehicles charge per day and what the site's electrical connection allows. A more powerful station isn't always better: if the vehicle is parked all night, 20kW is quite enough, and a 60kW station will only require a larger and more expensive electrical connection.
| Use | Recommended power | Example models |
|---|---|---|
| A private home with an American pickup or a vehicle with a large battery | 20-30kW | DSG-5120, DSG-5130 |
| A business with a vehicle fleet that returns to base during the day | 30-40kW | DSG-5130, DSG-5140 |
| Garage, car dealership, roadside assistance and events | 20-30kW portable | DSG-5020, DSG-5030 |
| A public parking facility, hotel or shopping center (stays of an hour or more) | 20-40kW | DSG-5220, DSG-5240 |
| A fuel station, junction or location with short stays | 60kW | DSG-5260, DSG-6960, DSG-7060 |
As of November 2026. At stations with two connectors, such as DSG-6960 and DSG-7060, the power is shared: one vehicle gets up to 60kW, and two vehicles charging simultaneously get up to 30kW each. For pickup owners there is a full guide on Charging station for an electric pickup, and for a private home, the guide on Home DC charging station.
How long does charging take at a 20-60kW DC station?
Charging time depends on the station's power, the maximum DC power the vehicle accepts and the battery size. The table shows an estimate for charging 36 kWh, which is 20% to 80% of a 60 kWh battery, assuming the vehicle accepts the full power.
| Station power | Estimated time for 36 kWh |
|---|---|
| AC 11kW (for comparison) | About 3 hours and 15 minutes |
| DC 20kW | About 1 hour and 50 minutes |
| DC 30kW | About 1 hour and 12 minutes |
| DC 40kW | About 55 minutes |
| DC 60kW | About 36 minutes |
Calculation: energy divided by power, without losses and without the slowdown at the end of charging, so in practice the time will be a little longer. Above 80%, most vehicles reduce the charging rate on their own, which is why at a public station it's customary to measure the time to 80%.
What electrical connection does a DC charging station need?
All the DC stations in the table require a three-phase connection: 32A for a 20kW station, 45A for 30kW, 63A for 40kW and 91A for 60kW, according to the product pages. In a private home with a small connection, or in a business that already uses most of its connection, a connection upgrade with the Israel Electric Corporation (IEC) may be required.
According to the Electricity Administration's guidelines for installing an EV charging system (published on 25.11.2025), a station is fed from a dedicated final circuit, with overcurrent protection and a nearby disconnect switch. The installation is carried out by a certified electrician, and an inspecting electrician approves the installation before it is put into operation. For full details of the requirements, see the guide Charging station installation guidelines. For an initial estimate of your installation cost, use theCharging station installation cost calculator.
CCS1 or CCS2: which connector should you order?
CCS2 is the common connector on electric vehicles sold in Israel, and CCS1 is the connector on American vehicles, like most electric pickups. On DSGCharge DC stations you choose the connector when ordering, CCS1 or CCS2, according to the vehicles that will charge at the station.
The choice matters because the Electricity Administration's guidelines prohibit using an adapter between the station's connector and the vehicle's inlet in a fixed installation (section 9(d)). So for a home with an American pickup, you order a station with a native CCS1 connector, and for a public station you choose according to the vehicles common in the area. A full explanation of connector types is in the guide DC and AC adapters for EVs.
What are the regulations for a public DC station in Israel?
Electricity Authority decision 73006 (from 31.12.2025, in effect from 26.7.2026) classifies public charging stations by power: up to 50kW is a slow station, 50-150kW is a fast station, and above 150kW is ultra-fast. The classification determines which obligations apply to the operator, and mainly the credit card payment terminal requirement.
| Station power | Classification under 73006 | Credit card payment terminal |
|---|---|---|
| 20-40kW (for example DSG-5220, DSG-5240) | Slow | Not mandatory |
| 60kW (for example DSG-5260, DSG-6960, DSG-7060) | Fast | Required in a new station from 1.1.2027, and in all fast stations from 1.1.2028 |
As of November 2026. A dedicated station that is not open to the public, for example in an employee parking lot, and a station in a private location are exempt from these rules. Full details in the guide Credit card payment terminal for a charging station, and cost planning for an entire site in the guide How much does it cost to set up a fast-charging station.
How do you choose a supplier for a DC charging station?
A good DC station supplier is one that sells, installs, manages and maintains the station over the years, not just one that sells the box. A DC station is expensive equipment that operates at high currents, so the service after the purchase is as important as the specifications.
Before you close the deal, ask every supplier to answer these questions:
- Standards compliance: Does the station have Standards Institution of Israel (SII) approval and confirmation of compliance with IEC 61851-23, as the Electricity Administration's guidelines require?
- Warranty: How many months, is it on-site at the customer's location, and can it be extended?
- Service: Who comes out for a fault, how quickly, and are there teams all over the country?
- Remote management: Does the public station connect to a cloud management system via the OCPP protocol, the open protocol for communication between a station and a server?
- Electrical connection and load management: Does the supplier check the connection before the order and offer a solution if the connection is small?
- Connector: Can you choose CCS1 or CCS2?
- Payment processing: Is there an app, RFID and the option of a credit card payment terminal at a public station?
About the difference between an importer and a distributor and why it affects the warranty, read the guide Charging station importer.
What do you get when you buy a DC station from DSGCharge?
DSGCharge provides every stage: matching the model and power rating, an electrical site survey, installation, connection to a management system and service. On the home and business stations the warranty is 36 months on-site, and on the portable and public stations it is 24 months.
DSGCharge public charging stations are managed in the cloud via OCPP, through an operations system developed by the company: authorizations, pricing, payment processing, reports and fault monitoring, customized and branded for the customer. You can read about the management on the page OCPP managed stations. Location owners also have a partnership model: no financial investment on your part, with the revenue split determined by the location and subject to a feasibility check. The full process is explained on the page Setting up public charging stations, and for businesses planning higher-power stations there is a guide on Ultra-fast charging station.
How do you order a DC charging station?
The process starts with a short conversation and ends with an operating, approved station:
- You tell us what the vehicles are, how long they stay parked and the size of the electrical connection.
- You receive a recommendation for a model, power rating and connector (CCS1 or CCS2).
- An electrical site survey and a quote for installation, including a connection upgrade if needed.
- Installation by a certified electrician, a check by an inspecting electrician and activation.
- For a public station: connection to the management system, pricing setup and payment activation.
Planning fast charging at a fuel station? We have a dedicated guide on Charging stations for fuel stations.
Frequently asked questions about DC charging stations
Who sells DC charging stations in Israel?
DSGCharge sells, installs and manages 20-60kW DC fast charging stations for homes, businesses and public locations. The company is the importer of the brand, active since 2021, and installation and service are provided throughout the country.
How much does a DC charging station cost?
In November 2026, store prices start at ₪9,428 for the 20kW DSG-5120 station and go up to ₪34,990 for the 60kW DSG-5260 public station. Some public stations are sold by quote. Installation and electrical work are not included.
What electrical connection does a 40kW DC station need?
According to the product pages, a 40kW DC station requires a 63A three-phase connection. A 20kW station requires 32A and a 60kW station requires 91A. An electrical site survey will determine whether a connection upgrade is needed.
Can you install a DC station in a private home?
Yes, when there is a suitable three-phase connection. The DSG-5120, DSG-5130 and DSG-5140 stations are designed for homes and businesses, and they are especially suitable for American pickups with CCS1 and vehicles with a large battery.
Does a public DC station have to have a credit card payment terminal?
Only a fast station, that is, above 50kW. According to Electricity Authority decision 73006, a new fast station needs a terminal from 1.1.2027, and all fast stations from 1.1.2028. 20-40kW stations are considered slow and are exempt from the requirement.
Want a DC charging station for your home, business or parking facility? The DSGCharge team will match you with a model, power rating and connector, and will check the electrical connection at your site. leave your details or call 077-9920350.
Sources: product pages in the DSGCharge store (22.11.2026); Electricity Administration guidelines for installing an EV charging system (25.11.2025, gov.il); Electricity Authority decision 73006 (31.12.2025, gov.il). Charging times are estimates. As of November 2026.