Charging stations for fuel stations: how to plan a fast charging site (2026)

Updated: November 2026

In short: Charging stations for fuel stations are usually DC fast charging stations of 180 to 400kW, which let a driver add significant range during a coffee stop. Proper planning starts with checking the electrical connection, continues with choosing the number of stations and their power, and requires a credit card payment terminal in every new fast charging station put into operation from 1.1.2027.

A fuel station is the most natural place for fast charging: it's located on a traffic route, it has parking, restrooms and retail, and drivers are already used to stopping there. But charging stations for fuel stations are not “just another pump”. They require a large electrical connection, planning for dwell times longer than refueling, a payment system that meets regulatory requirements, and ongoing operation that ensures the station is available when the driver arrives.

This guide is intended for fuel station owners, franchisees and operators considering setting up a charging hub. It deals with the planning decisions and the numbers, and complements the general guide on Setting up public charging stations.

You can compare DSGCharge's fast charging stations, with a choice of CCS1 or CCS2 connector, on the page DC fast chargers in the store.

Why set up charging stations at a fuel station?

A fuel station that adds fast charging stations keeps its customer base even as customers switch to electric cars. A driver who charges for 20 to 30 minutes stays on site much longer than a driver who refuels, and therefore has more time to shop at the convenience store or the coffee shop.

  • Location on a route: Fast charging is needed mainly on intercity trips, exactly where fuel stations are already located.
  • Existing amenities: Restrooms, retail, lighting and signage already exist on site, and there's no need to build them from scratch.
  • Revenue from selling electricity: The station owner or operator sets the price per kWh (kilowatt-hour, the unit of energy the car consumes), subject to price disclosure obligations.
  • Future readiness: The National Planning and Building Council is advancing updates to the National Outline Plan for fuel stations (TAMA 18) to make it easier to add charging stations. Details below.

How many charging stations and what power does a fuel station need?

At most fuel stations, it makes sense to start with 1 to 2 DC fast charging stations of 180 to 240kW, with infrastructure ready for expansion. At stations on main routes and at sites with heavy traffic, it's worth considering faster stations. Power is measured in kW (the charging rate), unlike kWh, which is the amount of energy going into the battery.

Two important points when choosing the power:

  • Splitting between two connectors: In many DC stations, when two cars charge at the same time, the power is split between them. For example, a 180kW station supplies 180kW to one car, or 90kW to each car when two are connected.
  • The car limits the rate: A car that accepts up to 100kW won't charge faster at a 240kW station. A powerful station mainly serves new cars, pickups and commercial vehicles with large batteries.

Which stations are suitable for a fuel station?

Model Power Split across two connectors Current (three-phase) Suitable for Store price
DSG-5240 40kW DC — — Small station, top-up charging ₪24,900
DSG-5260 60kW DC — — Urban station, limited budget ₪34,990
DSG-7420 120kW DC 60kW per connector 182A Most fuel stations on routes By quote
DSG-7480 180kW DC 90kW per connector 285A Main routes, heavy traffic By quote
DSG-7540 240kW DC 120kW per connector 364A Central charging hub, commercial vehicles By quote
DSG-7080 80kW DC with an advertising screen 40kW per connector 121A Station with high advertising exposure By quote
DSG-6052 Dual AC 2x22kW 22kW per connector 64A Employee parking or long stays ₪6,990

Prices and specifications according to the DSGCharge store, as of November 2026. The DC stations are ordered with a choice of CCS1 or CCS2 connector, and all are managed via OCPP from a cloud system. Details are according to the order.

You can read more about choosing Ultra-fast charging station and about the return on investment in DC stations for businesses.

What electrical connection do charging stations at a fuel station need?

The electrical connection is usually the factor that determines how many stations can be set up and at what rate. Each 120kW DC station draws about 182A three-phase according to the manufacturer's specifications, so a hub of four such stations reaches the order of hundreds of kilowatts. In most cases this requires a connection upgrade with the Israel Electric Corporation (IEC), and sometimes a dedicated transformer and electrical room.

Before choosing models, it's worth checking:

  1. Existing connection size and how much spare power remains after the pumps, cooling, lighting and the shop.
  2. The possibility of upgrading the connection and its timeline with the IEC.
  3. Space for an electrical room or transformer on the lot, including safety distances.
  4. Load management: A system that divides the available power among the stations in real time, so more stations can be set up on the same connection without exceeding it.

DSGCharge's cost calculator helps you get an initial estimate of the infrastructure cost: Charging station installation cost calculator.

What is changing in TAMA 18 regarding charging stations at fuel stations?

TAMA 18 is the National Outline Plan for fuel stations, and it determines what may be built at a station. The National Planning and Building Council is advancing an update intended to make it easier to set up fast charging stations at existing and new stations.

According to reports on the update (2025 through November 2026), its main points are:

  • An addition of up to 100 sq m for electrical infrastructure (electrical rooms, transformers, switchgear) at a station where at least five fast charging stations are permitted.
  • Waiting areas for drivers during charging, standalone or as part of the station's retail space.
  • Exemption from submitting a hydrological-environmental document for plans and permits that include electric charging stations only, including adding stations to an existing station.

According to the November 2026 report, the National Council approved forwarding the update to the government, and it still requires the government's approval. So before planning, it's worth checking with the local committee and a planning consultant what already applies to your station today.

What does regulation require of a fast charging station operator?

The Electricity Authority set rules for public charging station operators in decision 73006 (31.12.2025), which came into effect on 26.7.2026. A fuel station owner who operates fast charging stations needs to know three main obligations:

Topic What was decided Date
Credit card payment terminal At every fast and ultra-fast charging station: credit card payment without registration and without an app New stations put into operation from 1.1.2027; all stations from 1.1.2028
Price display At fast charging stations: a clear, visible price near the station, and online publication as well According to the timelines in the decision
Exempt from a license An operator of stations in a public place with a cumulative capacity of up to 8MW is exempt from a supply license, subject to conditions and reporting From 26.7.2026

Source: the Electricity Authority, decision 73006 and its appendices (gov.il), as of November 2026. Before setting up, it's worth checking the current wording.

The practical implication: a station put into operation at a fuel station in 2027 must include a credit card payment terminal from day one. DSGCharge's public DC stations support activation via RFID, the app and credit card.

How do you plan the site itself?

Planning a charging hub at a fuel station is different from planning a parking facility. The driver stays 20 to 40 minutes, needs convenient access to the cable and a space that doesn't block traffic to the pumps.

  • Separation from the pumps: Positioning the parking spaces so that a charging car doesn't block the refueling lane.
  • Cable length and access: Public DC stations usually have a 6-meter built-in cable. It's worth planning parking spaces that also suit pickups and commercial vehicles, whose charging ports are located in different places.
  • Mechanical protection: Protective posts or stoppers in front of the station. See the guide toCharging station cabinet and parking accessories.
  • Ingress protection: DSGCharge's DC stations have an IP55 ingress protection rating and are suitable for outdoor installation.
  • Lighting and signage: Drivers need to identify the stations from the road and find the price easily.
  • Dwell time: Shade, seating and access to the shop. This is where the station's additional profit lies.

How do you manage and operate charging stations at a fuel station?

A station that doesn't work damages the station's image. That's why remote management and fast maintenance are as important as the hardware. OCPP (Open Charge Point Protocol) is an open communication protocol that connects the station to a cloud-based management system, and makes it possible to see faults, change prices and generate reports remotely.

DSGCharge supplies Public charging station management system – a complete one: cloud management, a user app, payment terminals, license plate recognition (LPR) cameras, pricing, payment processing and reports. The system was developed by DSGCharge and can be customized and branded according to the customer's requirements, so the stations at the fuel station can operate under the fuel station chain's brand. More information about OCPP managed stations.

How much does it cost to set up charging stations at a fuel station?

The cost consists of hardware, electrical infrastructure (connection upgrade, cables, panels and sometimes a transformer), civil works, a management and payment system, and maintenance. In most projects the infrastructure is a significant part of the budget, so checking the existing connection is the first step. A detailed cost breakdown, including a sample budget, appears in the guide How much does it cost to set up a fast-charging station.

For site owners who don't want to invest themselves, DSGCharge also offers a partnership model: no financial investment on your part, with the revenue split determined by the location and subject to a feasibility check.

Who sets up and manages charging stations for fuel stations?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and it sets up and manages charging systems end to end: public AC and DC stations up to 480kW, a cloud-based operating system, and installation and service nationwide. Its products have Standards Institution of Israel (SII) approvals.

Beyond fuel stations, DSGCharge also sets up Charging stations for parking facilities, solutions forCharging stations for businesses and a charging service atHotels.

Frequently asked questions about charging stations for fuel stations

How many charging stations should you set up at a fuel station?

At most stations you start with 1 to 2 DC stations of 120 to 240kW and prepare infrastructure for expansion. The final number depends on the electrical connection, the space and the traffic at the station.

Is a credit card payment terminal mandatory at a charging station at a fuel station?

Yes, at fast and ultra-fast charging stations. According to Electricity Authority decision 73006, new stations put into operation from 1.1.2027 must have a credit card payment terminal, and all fast charging stations from 1.1.2028.

How long does it take a car to charge at a 120kW station?

It depends on the car and the battery. A car that accepts high power can add a significant amount of range within 20 to 30 minutes. When two cars charge at the same time, each one gets 60kW.

Do you need a license to operate charging stations at a fuel station?

An operator of stations in a public place with a cumulative capacity of up to 8MW is exempt from a supply license, subject to the conditions set by the Electricity Authority. Above that, a license is required.

Can you set up stations without investing?

Yes, with DSGCharge's partnership model: no financial investment on the site owner's part, with the revenue split determined by the location and subject to a feasibility check.

Planning charging stations at your fuel station? The DSGCharge team will check the electrical connection, recommend the right number of stations and power, and prepare a quote for the hardware, installation and operation. leave your details or call 077-9920350.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 