In short: Under Electricity Authority decision 73006, every public fast (50 to 150kW) or ultra-fast (above 150kW) charging station must allow payment by credit card at a terminal, without registration and without an app. A new station that starts operating from 1.1.2027 needs a terminal from day one, and all fast stations by 1.1.2028. Slow stations (up to 50kW) are exempt from the requirement.
If you own a parking facility, fuel station or mall, or operate charging stations, the question is not whether to add a Credit card payment terminal for a charging station, but when and to which stations. This guide explains exactly what the decision says, which stations must have a terminal, the difference between an exempt operator and a license holder, and what you should check right now in the station you're buying, so you don't have to replace equipment in a year.
What is a credit card payment terminal at a charging station, and why is everyone talking about it now?
A credit card payment terminal is a device or system that reads the card details and passes them on for transaction approval. At a charging station, it lets an occasional driver charge a physical card and start charging, without downloading an app and without opening an account. The Electricity Authority's decision defines this as a terminal compliant with the Bank of Israel's EMV standard.
The Electricity Authority adopted decision 73006 on 31.12.2025, and the rules came into effect on 26.7.2026. In the explanatory notes to the decision, the Authority writes that it chose not to mandate an open payment protocol, and instead to require a terminal at all fast and ultra-fast stations. The goal is simple: every driver should be able to charge at any fast station, even if they aren't a subscriber of the operator.
When is it mandatory to install a credit card payment terminal at a charging station?
There are two deadlines, and they depend on whether the station is new or existing. A fast station that starts operating from 1.1.2027 must allow payment at a terminal from day one. Fast and ultra-fast stations that are already operating must meet the requirement by 1.1.2028.
| Date | What happens |
|---|---|
| 31.12.2025 | The Electricity Authority adopts decision 73006 |
| 26.7.2026 | The rules come into effect: a license for large operators, conditions for exempt operators, the option to stop charging at any time |
| 1.1.2027 | A new fast or ultra-fast station: a credit card payment terminal from the start of operation |
| 1.1.2028 | All fast and ultra-fast stations, including existing ones: payment at a terminal without registration |
As of November 2026. The practical meaning: a fast station you order today that will be put into operation in early 2027 needs to come with a terminal, or at least be prepared for one to be installed before activation.
Which stations must have a terminal: fast, ultra-fast or slow?
The decision classifies stations by the maximum power they can deliver at any given moment, not by AC or DC. A slow station is up to 50kW, a fast station is between 50 and 150kW (inclusive), and an ultra-fast station is above 150kW. The requirement applies only to fast and ultra-fast stations.
There's a point here that's easy to miss: by definition, a 40kW DC station is considered a slow station, so it doesn't need a terminal. A 60kW DC station is already considered fast. Here's how DSGCharge models are classified:
| Model | Power | Classification under 73006 | Terminal required? | Price |
|---|---|---|---|---|
| DSG-6052 | Dual AC, 2x22kW | Slow | No | ₪6,990 |
| DSG-6112 | Dual floor-standing AC 22kW | Slow | No | ₪7,990 (instead of ₪9,900) |
| DSG-5240 | DC 40kW | Slow | No (credit card as an option) | ₪24,900 |
| DSG-5260 | DC 60kW | Fast | Yes (credit card as an option) | ₪34,990 |
| DSG-6960 | DC 60kW, 2 connectors | Fast | Yes (credit card activation) | By quote |
| DSG-7420 | DC 120kW | Fast | Yes (credit card activation) | By quote |
| DSG-7480 | DC 180kW | Ultra-fast | Yes (credit card activation) | By quote |
| DSG-7540 | DC 240kW | Ultra-fast | Yes (credit card activation) | By quote |
Store prices, incl. VAT, as of November 2026. The DC stations are ordered with a choice of CCS1 or CCS2 connector. You'll find the range of fast stations and the considerations for choosing a supplier in the guide Ultra-fast charging station for businesses and operators.
How does the classification affect your planning?
If most customers at the site stay an hour or more, for example at a hotel, offices or a shopping center parking lot, 22kW AC stations or a 40kW DC station will be enough, and the terminal requirement won't apply to them. If customers stop for twenty or thirty minutes, as at a fuel station or near a main road, you'll need a fast station of 60kW or more, and then the terminal is part of the budget from the start. So it's worth deciding on the power rating based on how long people stay, and pricing the terminal already at the planning stage.
What is the difference between an exempt operator and a license holder?
An operator whose public charging stations have a cumulative capacity of 8MW or more needs a license from the Electricity Authority. According to the explanatory notes to the decision, 8MW is roughly 50 DC fast charging stations or about 350 AC stations. Most site owners, such as a parking facility, hotel or fuel station with a few stations, are below the threshold and are considered exempt operators, provided they comply with several rules.
| Topic | Exempt operator (up to 8MW) | License holder (8MW and up) |
|---|---|---|
| Fast and ultra-fast stations | Payment at a credit card payment terminal without registration | Payment at a credit card payment terminal without registration |
| Slow stations (up to 50kW) | No payment terminal requirement | No terminal requirement, but you must allow an occasional customer to pay without registration and without an app: at a terminal, by secure online payment (for example a QR code) or by phone call |
| Price display | At a slow station: on site or near the station. At a fast station: near the station, clearly displayed | On site, without registration. At fast stations, also near the station |
An exempt operator must also allow the customer to stop charging at any time, let every occasional customer use the station without discrimination compared to subscribers (apart from the price itself), comply with the Ministry of Energy's cyber guidelines for grid-connected stations, and report to the distributor and the Authority on the location, power and type of stations when requested.
Does an AC station in a building's or an employee parking lot need a terminal?
No. Stations in a private location are completely exempt from these rules, as are dedicated stations, that is, stations in a public location that are not open to the public and are intended mainly for employees. A 22kW public AC station is also a slow station, so there is no terminal requirement for it.
At such stations, billing is usually done via an RFID card or an app, and in buildings according to a TOU meter and a monthly report. Managed charging stations such as DSG-6052 and DSG-6112 connect to a cloud management system, where you can set authorizations, a rate for each user and reports. You'll find a full explanation of the subject on the page OCPP managed stations.
What should you check in a fast station you're buying today?
A fast station is an investment for many years, so it's worth making sure when you order that it will meet the 2027 and 2028 requirements. These are the points to check with the supplier:
- Built-in terminal or a ready option: Does the station come with a card reader, or can it be added when ordering (on DSG-5260 and DSG-5240, a credit card reader is an option).
- Payment without registration: The driver taps a card and starts charging, without an app and without an account.
- A screen that shows the price and the charge: A price displayed near the station, charging time, amount of energy and the amount charged.
- Permanent connectivity: A LAN or 4G connection, because transaction approval requires a network connection.
- Management via OCPP: An open protocol for managing stations from the cloud, which lets you update prices, see faults and generate reports.
- Stopping charging at any moment: A button or a simple action that stops charging, as required of every operator.
- Cyber: Compliance with the Ministry of Energy's guidelines for stations connected to the power grid.
If you're planning an entire site, it's also worth reading the cost breakdown in the guide How much does it cost to set up a fast-charging station, and the guide to planning Charging stations for fuel stations.
What do you do with a fast station that's already installed?
An existing fast station has until 1.1.2028. The first step is to check with the supplier whether a terminal can be added to it, whether a component replacement or software update is needed, and what the timeline is. A station that can't be upgraded will require replanning, and it's better to know that a year in advance and not in December 2027.
At the same time, it's worth checking the other rules already in effect from 26.7.2026: displaying the price near the station, the option to stop charging, and equal service for every occasional customer. If you have several sites, count the cumulative capacity: above 8MW you need a license, and the online publication rules also apply to you.
How does the DSGCharge operations system work with a terminal?
DSGCharge provides a complete operations system for public charging stations: cloud management via OCPP, a user app, credit card payment terminals at the station, license plate recognition (LPR) cameras, pricing, payment processing and reports. The system was developed in-house by the company and can be customized and branded to your requirements (White Label). All the systems were developed in-house by the company. Full details on the page Public charging station management system.
DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations sold and installed, and installation and service are provided throughout the country. Location owners also have a partnership model: no financial investment on your part, with the revenue split determined by the location and subject to a feasibility check. You can read about the full process on the page Setting up public charging stations, and about the models for parking facilities and local authorities in the guides Charging stations for parking facilities andCharging stations for local authorities.
Frequently asked questions about credit card payment terminals at charging stations
Does a 22kW AC station need a credit card payment terminal?
No. A station of up to 50kW is a slow station under decision 73006, and there is no terminal requirement for it. A license holder (8MW and up) must allow occasional payment without registration there, for example via a QR code or by phone.
From what date does a new fast station need a terminal?
A fast or ultra-fast station that starts operating from 1.1.2027 must allow payment at a terminal from the start of operation. Stations operating before then must meet the requirement by 1.1.2028.
Is a 40kW DC station considered a fast station?
No. According to the definitions in the decision, a fast station is between 50 and 150kW. A 40kW DC station, such as DSG-5240, is considered a slow station and doesn't need a terminal, but you can order it with a credit card reader.
Can you make do with an app instead of a terminal?
Not at fast and ultra-fast stations. The requirement is to allow payment with a physical card without registration. An app can work alongside the terminal, for example for subscribers and benefits.
Do stations in an employee parking lot need a terminal?
No. A dedicated station, that is, a station that is not open to the public and is intended mainly for employees, and stations in a private location are exempt from the rules of decision 73006.
Planning fast charging stations for a parking facility, fuel station or business? DSGCharge will help you choose stations that meet the 2027 and 2028 requirements, including a terminal, cloud management and installation. leave your details Or call 077-9920350. To estimate the installation cost, you can use theCharging station installation cost calculator.
Source: Electricity Authority decision 73006 (31.12.2025), including appendices and explanatory notes, gov.il. This information is general and is not legal advice. As of November 2026.