EV charging station installation

Installations

Installing an EV charging station is electrical work in every sense: a dedicated circuit from the panel, a cable carrying high current for long hours, proper protection and testing before activation. On this page you'll find everything you need to know before ordering a charging station installer: the steps, what determines the price, single-phase or three-phase, the difference between a private house, an apartment building and a business, and the latest Electricity Administration guidelines.

In short: EV charging station installation is carried out only by an electrician licensed at least as a certified electrician, on a dedicated final circuit with a circuit breaker, a Type B RCD (or A/F with a residual DC current detector), proper earthing and testing before activation. A standard installation at DSGCharge starts at ₪2,490 (up to 20 m of cable, as of 10/2026), and the final price depends on the distance from the panel, the connection size and additional work.

Want to know how much it will cost you? Get a cost estimate in a minute with the charging station installation cost calculator: enter the distance from the panel, connection type and building type, and get an initial estimate.

Why isn't installing a charging station a “simple” job?

Safety in charging station installation isn't a recommendation, it's the law. A 7.4kW home station draws about 32 amps continuously, and a 22kW three-phase station draws 32 amps on each phase, sometimes for six to eight hours straight. That's a completely different load from a household appliance that runs for a few minutes. A loose connection, a cable with the wrong cross-section or the wrong type of RCD won't show up on day one, but after months of heating, sometimes in the form of a fire or electric shock.

That's why installation is carried out only by an electrician licensed under the Electricity Law, and only with standard-compliant materials and components. With high currents you can't “cut corners”, and you shouldn't compromise on installation quality over a difference of a few hundred shekels. The difference between a cheap installation and a correct one shows up exactly when you least want it to.

What do the Electricity Administration guidelines say about installing a charging station?

On 25.11.2025 the Electricity Administration at the Ministry of Energy published an updated version of the “Guidelines for installing an EV charging system”. According to section 18, the guidelines take effect six months after publication, and they may be followed from the publication date. The main requirements every EV owner should know (as of 10/2026):

  • Who installs: Planning, installation and maintenance are carried out by a licensed electrician At least a certified electrician (section 3).
  • Dedicated circuit: The station is fed from a final circuit dedicated to charging only, made of cable only, and each connection point is protected against overcurrent by a circuit breaker (section 4). An isolating switch near the station is also required.
  • Power matching: Charging power is limited according to the rated current of the protective device protecting the circuit (section 3).
  • Residual current device (RCD): Each AC connection point has a dedicated 30mA Type B RCD, or Type A or F with an added residual DC current detection device. The protection upstream of it in the panel must be suited to residual DC current (section 6). The RCD can be built into the station.
  • Surge protection: Mandatory at charging points for public use and at stations in a shared parking facility of a residential building (section 7).
  • Cable and connector: The charging cable is up to 8 meters (up to 10 meters only with a cable management system), and using an adapter for the vehicle connector is prohibited (sections 8-9). A Type 1 connector is allowed only in private parking.
  • Equipment: A station per IEC 61851-1 approved by an accredited laboratory, support for a charging management system, at least IP44 outdoors, mechanical protection or IK08, and sockets and connectors at a height of 0.5-1.5 meters above the ground (section 10).
  • Testing and maintenance: Inspection by an inspecting electrician before first activation and after any significant change (section 15). The station owner tests the RCD with the test button at least once a year, and an electrician performs an instrument test at least once every six years (section 16).
  • Documentation: The installer hands the owner the station data, standard approval, feed diagram, operating instructions and test report (section 17).

If an installer offers to “connect to an existing socket” or skip a suitable RCD to save money, that's a sign to look for another installer.

EV charging station installation steps: how does it work in practice?

  1. Checking the connection and the panel. We check the size of the electricity connection (for example 1X40 or 3X25), the state of the electrical panel, free space for breakers and the existing load in the home. This is where it becomes clear whether direct installation is possible or a connection upgrade or load management is needed.
  2. Choosing the station's power. Power is set by three things: the connection size, the car's on-board charger (how many kW the car can accept on AC), and your driving pattern. There's no point installing 22kW for a car that accepts 11kW, and no point choking a home connection with a station that will trip the main breaker.
  3. Planning the cable route. We measure the distance from the panel to the parking spot and plan the route: on a wall in an external conduit, inside existing piping, or underground. The distance and route are the main factor in the price.
  4. Installing protection devices in the panel. A circuit breaker sized for the power and the cable cross-section, and an RCD suitable for charging (B, or A/F with DC detection) if it isn't built into the station. In shared buildings and public parking, surge protection is added.
  5. Earthing and pulling the cable. Running a cable with a suitable cross-section, connecting the earthing and testing its continuity. Without proper earthing the station shouldn't charge at all.
  6. Mounting the station. On a wall, on a telescopic pedestal DSG-405 or inside a protective cabinet, at a height and location that protect it from mechanical impact.
  7. Setup, testing and documentation. Limiting the charging current on the station according to the breaker, RCD testing, measurements, a test charge with the car, and handing over documentation and a test report to the customer.

A detailed explanation for homeowners is in the guide Home charging station installation for EV owners.

Single-phase or three-phase: what power can be installed based on connection size?

The size of the electricity connection sets the ceiling. The table shows the capacity of common home connections in Israel and the power that usually suits them. This is a general estimate: the final decision is made after checking the actual load in the home.

Connection sizeCapacity (kVA)Common station powerNotes
1X25 (single-phase)5.77Up to 3.7kW (16A)The connection is small for continuous charging alongside household consumption. Consider a connection upgrade.
1X40 (single-phase)9.243.7-7.4kW (16-32A)7.4kW is possible, but may clash with air conditioners and the oven. A smart station with current limiting helps.
3X25 (three-phase)17.32Up to 11kW (3X16A)The most common configuration for a three-phase home station.
3X40 (three-phase)27.7111kW, and 22kW with load management22kW (3X32A) leaves little headroom for the home. Load balancing is recommended.

Also check the car: some cars accept only single-phase on AC (up to about 7.4kW), even if the home connection is three-phase. Check the on-board charger (OBC) power in the vehicle license or with the importer. For choosing the station itself, see Smart charging station 11kW DSG-1061 and the Smart charging station 22kW DSG-1062, and all models on the page EV charging stations. To estimate how long charging will take at each power level, use thecharging time and cost calculator.

What affects the price of a charging station installation?

There's no “one price” for installation, because every parking spot is different. The prices in the table are the prices of service products in the DSGCharge store, as of 10/2026. The other factors depend on the site and are determined in the survey.

FactorHow it affects the priceRelevant service or product
Distance from the panel to the parking spaceThe main factor: more cable, more routing, more work.Installation up to 20 m DSG-9903: ₪2,490. Installation up to 30 m: ₪2,990. Each additional meter: ₪69.
Single-phase or three-phaseHigh-power three-phase cable is thicker and more expensive, and the panel protections are different.Determined in the inspection and the calculator.
Need to upgrade the connectionIf the connection is small, the upgrade is done with the IEC and paid to it, separately from the installation.Depends on the IEC and the requested connection size.
Separate connection or a split from the meterWhen you want a feed separate from the meter (mainly in apartment buildings).Separate connection from the meter DSG-9907: ₪2,790.
Digging, cutting, trenchesChiseling, lifting paving stones, cutting asphalt or digging are not included in standard installation (which is done in an external conduit).Priced per site.
Pedestal or enclosureWhen there's no wall next to the parking spot or when protection from impact and the weather is needed.telescopic pedestal DSG-405: ₪690. Wall enclosure DSG-410: ₪790. Pedestal enclosure DSG-411: ₪1,390. Cable tensioning device DSG-408: ₪990.
Apartment buildingA greater distance from the panel, passing through common areas, surge protection, coordination with the committee.Survey in an apartment building DSG-9900: ₪690.
Replacing an existing stationWhen the infrastructure exists and is in good condition, the job is much shorter.Removal of an existing station and mounting a new one DSG-9908: ₪690.

The final installation price is set at the end of the job and varies by its nature. So the fastest way to get a realistic number is Charging station installation cost calculator, followed by an installer's survey. Anyone who hasn't bought a station yet can also choose Station plus installation package.

Charging station installation in a private house, an apartment building and a business: what's the difference?

Private houseApartment buildingBusiness or parking facility
Power supplyFrom the home panel, on a dedicated circuitFrom the apartment panel, a common panel or a separate connectionA dedicated panel for the stations, sometimes a separate connection
ApprovalsNo neighbors' approval neededDepends on the route: notice to the committee or a majority decisionElectrical design for the whole system
Surge protectionAt the designer's discretionMandatory in a shared parking facilityMandatory for public use
Load managementRecommended with a small connectionAlmost always needed with several stationsNeeded in most cases
Starting pointCalculator and panel checkBuilding surveyPlanning meeting

Charging station installation in a private house

This is the simple case: your panel, your parking spot and your decision. Most of the work is checking the connection, running a cable from a dedicated circuit and installing the protections. In most detached houses installation is finished in one visit, unless digging or a connection upgrade is needed.

Installation in an apartment building

According to a ruling by the Tel Aviv land registry superintendent (2023), installation in an assigned parking space from the apartment's electricity doesn't require the neighbors' consent, but requires written notice to the committee and apartment owners at least 45 days in advance. According to the bill approved in first reading (May 2024), which is not yet law as of 10/2026: a feed from the common panel will require a majority decision and a separate meter, and installation in common parking will require a two-thirds majority. Start withapartment building installation survey, which checks the cable route, the panel and the options. Full details on the page Charging station installation in apartment buildings. When several residents want stations, a managed system for the whole building saves a connection upgrade for each apartment: see Managed charging stations in apartment buildings.

Charging station installation for businesses

In a business you plan a system, not a single station: how many vehicles, how long they park, the connection size, and who pays for charging. In most cases it makes sense to combine managed stations with load balancing, such as Managed charging station 22kW DSG-6012, to charge several vehicles on the same connection. In parking open to the public there are additional requirements: a Type 2 connector, surge protection, and DC stations for fast charging. For vehicle fleets see EV fleet management, and for parking facilities and public locations see Setting up public charging stations.

What common faults are caused by amateur installations?

  • The wrong type of RCD. A standard RCD (Type AC) doesn't detect residual DC current that charging systems may produce, and in that case it may not trip during a fault.
  • A cable with too small a cross-section. Continuous high-current charging heats an unsuitable cable. The insulation dries out, the terminals loosen, and it starts to smell.
  • Loose terminals. A loose connection in the panel or the station creates a hot spot. Over time it can melt terminals and insulation.
  • Connection to an existing circuit or a socket. A station sharing a circuit with an air conditioner or oven trips the breaker or, worse, overloads a cable that wasn't designed for it. The guidelines require a dedicated circuit.
  • Current limit not configured. A station set to 32A on a 25A breaker will trip again and again, and if the breaker is bigger than the cable, the cable pays the price.
  • Faulty earthing. The station warns of an earthing fault or, worse, doesn't detect it.
  • Outdoor installation without protection. A station without a suitable IP rating, without a cabinet or at a height exposed to being hit by a car.
  • No testing and no documentation. Without a test report it's hard to prove compliance to insurance, and there's no basis for maintenance.

Have a station that behaves strangely, trips breakers or heats up? Order a Technician service call DSG-9909 (₪590, as of 10/2026) before the fault gets worse.

How do you choose a charging station installer?

  • License: At least a certified electrician, as required by the guidelines.
  • Experience with charging stations: Knowledge of RCD types for charging, setting current limits and load management.
  • A clear quote: What's included (meters, protections, conduit) and what isn't (chiseling, digging, connection upgrade).
  • Testing and documentation: A test report and feed diagram at the end of the job.
  • Service after installation: Who comes if there is a fault, and how quickly.

Why install a charging station with DSGCharge?

DSGCharge, part of S.M.C. Dor HaAtid, has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own – and the company operates dozens of installation and service teams nationwide; about 20,000 chargers and charging stations have been sold and installed. The teams carry out all types of installation, from a simple home station to complex projects in buildings, parking facilities and businesses, with standard-compliant materials and in compliance with the standards and the Electricity Administration guidelines. When the station, installation and service come from the same company, there's one address for every question. According to the site, more than 20,000 customers have already chosen DSGCharge and 99.7% recommend it. You can add Extended warranty DSG-8800 (₪299, as of 10/2026). For examples from the field see Projects and installations.

Ready to install? Three steps to get started

  1. Get a cost estimate in a minute in theinstallation cost calculator.
  2. Order installation: up to 20 m or up to 30 m, or Apartment building survey.
  3. For businesses, buildings and parking facilities: leave your details and we will get back to you with a tailored plan.

Frequently asked questions about EV charging station installation

How much does EV charging station installation cost?

A standard installation at DSGCharge costs ₪2,490 for up to 20 meters of cable and ₪2,990 for up to 30 meters, and each additional meter is ₪69 (as of 10/2026). Chiseling, digging, splitting from the meter and connection upgrades are not included. For a tailored estimate use the installation cost calculator.

Who is allowed to install a charging station?

According to the Electricity Administration guidelines of November 2025, planning, installation and maintenance of a charging system are carried out by an electrician holding at least a certified electrician license. Before first activation the system is inspected by an inspecting electrician.

Can a charging station be installed on a single-phase connection?

Yes. On a 1X40 connection a station of up to 7.4kW can be installed, and on a 1X25 connection it's recommended to limit to 3.7kW or consider a connection upgrade. Charging at 11kW and above requires a three-phase connection and a car that supports it.

Which RCD does a charging station need?

A dedicated 30mA RCD for each connection point: Type B, or Type A or F with an added residual DC current detection device. In some stations residual DC current detection is built into the station itself. The installer checks the specification and completes the protection in the panel accordingly.

How long does a charging station installation take?

It depends on the site. A standard installation in a private house, when the panel is close and the connection is sufficient, is usually a one-visit job. Splitting from the meter or a connection upgrade depends on the IEC's schedule, and in an apartment building you should add time for the survey and coordination with the committee.

Do you need the neighbors' approval to install in an apartment building?

It depends on the route. Installation in an assigned parking space from the apartment's electricity doesn't require consent, but according to a land registry superintendent's ruling requires notice to the committee and apartment owners 45 days in advance. According to the bill (not yet finally approved), a feed from the common panel will require a majority decision and a separate meter, and installation in common parking a two-thirds majority. A building survey will clarify which route suits you.

Additional services

Blog

Quality charging stations

Advanced charging solutions for home and public use

Fast installation

Professional installation teams nationwide

Warranty

Our products come with a long warranty for confidence and peace of mind

Product store

A wide range of quality EV charging products

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?

Accessibility Toolbar