Charging station for the Cadillac Escalade IQ: DC fast charging at home (CCS1)

A charging station for the electric Cadillac Escalade IQ imported from the US: why it charges at only 7kW on a regular station, charging times at 20-60kW DC, the required connection and station prices.

Imported an electric Cadillac Escalade IQ from the US and discovered that it charges very slowly on a regular home charging station? The Escalade IQ is built on the same GM platform (Ultium) as the Chevrolet Silverado EV and the GMC Hummer EV: a battery of about 200 kWh and an American CCS1 charging port. So the solution is the same too: DC fast charging station with an original CCS1 connector, at home or at your business.

In short: A Cadillac Escalade IQ imported from the US charges in Israel on single-phase AC only, about 7kW, so a full charge of about 200 kWh takes more than a full day. A 20-60kW home DC charging station with a CCS1 connector cuts charging to about 4-12 hours. A 20kW station (DSG-5120, ₪9,428 as of November 2026) usually works with a 3X40 connection.

Cadillac Escalade IQ: what do you need to know about charging?

The Escalade IQ is a fully electric luxury SUV with one of the largest batteries on the market. It arrives in Israel mainly through personal and parallel import from the US, with a CCS1 port and an onboard charger designed for the American power grid.

Model Battery capacity (approx.) Maximum DC charging AC charging in the US (240V)
Cadillac Escalade IQ / IQL about 200 kWh Up to 350kW (in 800V mode) Up to 19.2kW
Cadillac Lyriq about 100 kWh up to about 190kW Up to 19.2kW
Chevrolet Silverado EV / GMC Hummer EV (for comparison) about 200 kWh Up to 350kW Up to 19.2kW

Figures are based on the manufacturer's publications for the US market and vary by version and model year. Before buying a station, check the port label on the vehicle to see which standard is installed.

Why does the Escalade IQ charge at only 7kW on a home charging station?

The American J1772 (Type 1) connector is single-phase and has no pins for three phases. So even a 22kW three-phase home charging station delivers only one phase to the vehicle. In the US, the Escalade reaches 19.2kW because it charges at 240V with a current of up to 80A. In Israel, the grid is 230V per phase, and a home charging station typically supplies up to 32A, i.e., about 7.4kW.

The only way to charge fast is to bypass the onboard charger and charge with direct current (DC) straight to the battery, through the CCS1 connector. A full technical explanation is in the guide Charging station for the Silverado and American pickups, which also applies to the Escalade.

How long does it take to charge a Cadillac Escalade IQ?

Station power Battery of about 200 kWh, 10%-80% Battery of about 200 kWh, 0%-100%
7kW AC (single-phase) About 22 hours About 32 hours or more
20kW DC About 8 hours About 12 hours
30kW DC About 5.5 hours About 8 hours
40kW DC About 4 hours About 6 hours
60kW DC About 2.5-3 hours About 4.5 hours

The calculation is conservative: about 90% efficiency and extra time at the end of charging, when the vehicle reduces power. Actual time depends on temperature, battery condition and vehicle settings. To calculate based on your mileage, use thecharging calculator.

The bottom line: at 7kW, an Escalade IQ that is driven a lot can't fully charge in one night. A 20kW DC station already allows a full overnight charge, and 30-40kW suits those who also need to charge in the middle of the day.

Which charging station is right for the Cadillac Escalade IQ?

Model Power Three-phase input current (per spec) Minimum electrical connection Price (as of November 2026, excluding installation)
DSG-5120 20kW DC 32A 3X40 ₪9,428
DSG-5130 30kW DC 45A Larger than 3X40 ₪15,328
DSG-5140 40kW DC 63A At least 3X63 ₪22,408
DSG-5160 60kW DC 91A At least 3X100 Upon quote

“Minimum connection” is a starting point: the connection also has to serve the rest of the home's or business's consumption, so the final decision is made after a load check. For stations of 30kW and up, most private homes will require coordinating a connection increase with the IEC.

What's included in DSGCharge DC stations:

  • A CCS1 or CCS2 connector, chosen when ordering, so the vehicle connects directly without an adapter.
  • Three-phase 380V supply and a built-in 5-meter cable, with an option for a longer cable.
  • Activation by RFID card, app or Plug&Charge, and OCPP 1.6J support for remote management.
  • Protection against leakage, overvoltage, overcurrent, temperature and lightning.
  • 36-month warranty with service at the customer's location.

All models are in the category DC fast charging stations. A comparison of AC and DC for all vehicle types is in the guide Home DC charging station.

What about the Cadillac Lyriq?

A Lyriq imported from the US also charges on single-phase AC through a CCS1 port, so a DC station with a CCS1 connector suits it too. Its battery is smaller, about 100 kWh, so on a 20kW station it charges from 10% to 80% in about 4 hours. The European-version Lyriq, with a CCS2 and Type 2 port, charges on three-phase AC and also works with a regular home charging station.

What if the vehicle has a NACS port?

In newer American models, manufacturers are gradually moving to the NACS port. If your vehicle has a NACS port, contact us before ordering so we can match the connector.

Adapters: when do they help?

For a fixed station at home, an original CCS1 connector without an adapter is better. More in the guide DC and AC adapters for EVs.

How do you install a DC station for the Escalade at home?

  1. Check the existing electrical connection and the loads in the home.
  2. Choose the power: 20kW for most homes, 30-40kW for those who drive a lot.
  3. If needed, coordinate a connection increase with the IEC.
  4. A certified electrician installs the station and connects it to the panel. Details on the page Installations.

How much does it cost to charge an Escalade IQ at home?

When charging at home, you pay the residential electricity rate. According to the Electricity Authority tariffs in effect from 1.7.2026 (incl. VAT), a full charge of about 200 kWh (about 220 kWh from the grid, including losses) costs roughly:

  • TOU at off-peak hours (about 46-50 agorot per kWh): about ₪100-₪111.
  • Flat residential rate (63.52 agorot per kWh): about ₪140.

A 20-30kW station finishes most charging sessions before morning, even if you start after 23:00, when electricity is cheaper.

Why buy a charging station for the Escalade from DSGCharge?

DSGCharge, one of Israel's leading companies in EV charging solutions, is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, has sold and installed about 20,000 chargers and charging stations, and provides nationwide installation and service. All products are approved by the Standards Institution of Israel.

The same station already charges the Silverado EV and Hummer EV in homes and businesses in Israel, and it's exactly the same solution for the Escalade IQ. GMC owners have a dedicated guide: Charging station for the GMC Hummer EV and Sierra EV.

Want a fast charging station for your vehicle?

Tell us what vehicle you have, what electrical connection you have at home or at your business, and where the station will be installed. We'll check the infrastructure and recommend the right power. Phone: 077-9920350, or leave your details and we will get back to you.

Frequently asked questions

Why does the Cadillac Escalade IQ charge at only 7kW on a home charging station?

Because a vehicle imported from the US has a single-phase J1772 (Type 1) connector, and the onboard charger was designed for the American 240V grid. In Israel it receives a single 230V phase, and on a 32A home charging station that's about 7.4kW. To charge fast, you need a DC station with a CCS1 connector.

How long does it take to charge an Escalade IQ on a home DC station?

As a conservative estimate, for a battery of about 200 kWh: from 10% to 80% takes about 8 hours on a 20kW station, about 5.5 hours at 30kW and about 4 hours at 40kW. On a 7kW single-phase AC station, it takes about 22 hours.

Is the same station suitable for the Escalade IQ and the Silverado EV?

Yes. Both are built on GM's Ultium platform, with a battery of about 200 kWh and a CCS1 port. The same DC station with a CCS1 connector suits both, as well as the GMC Hummer and Sierra.

What electrical connection does a DC station for the Escalade need?

For a 20kW station (DSG-5120), a 3X40 connection is enough in most cases. A 30kW station needs a larger connection, and a 40kW station needs at least 3X63. The final decision is made after a load check.

How much does a DC charging station for the Cadillac Escalade IQ cost?

At the DSGCharge store, as of November 2026 and excluding installation: the 20kW DSG-5120 at ₪9,428, the 30kW DSG-5130 at ₪15,328 and the 40kW DSG-5140 at ₪22,408.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar