How do you get 230V power from a charging station? An adapter that turns the station into an outlet

A 230V adapter connects to the cable of an AC charging station and turns it into a regular power outlet – for a vacuum cleaner, power tools, lighting and charging e-bikes in the parking space. The difference from V2L, station compatibility and safe use.

In short: You can get 230V power from a home or public AC charging station using a dedicated adapter that connects to the station cable's connector and turns it into a regular power outlet. That way you can run a vacuum cleaner, power tools, lighting or an e-bike charger right in the parking space – without an extension cord from the apartment and without touching the car's battery.

How do you get 230V power from a charging station?

An AC charging station doesn't send power to the cable until it detects that something is connected to it. A 230V adapter connects to the connector at the end of the station's cable, and the station identifies it as a load and feeds a regular power outlet through it. You plug the device into it like any outlet at home.

  1. Connect the adapter to the charging station cable's connector.
  2. If the station is activated by card or app – activate it as usual.
  3. Plug the device into the outlet on the adapter.

Why is it useful?

Many underground parking garages and private parking spaces have no available power outlet, but they do have a charging station. The adapter makes use of the existing infrastructure.

Use Example
Cleaning the car Vacuum cleaner, pressure washer
Work in the parking space or storage room Drill, saw, work light
Electric mobility E-bike or e-scooter charger
An event or open area Lighting, speaker, small devices

What's the difference between a 230V adapter from a charging station and a V2L adapter?

Both give you a power outlet, but from a different source. V2L adapter draws power from the car's battery, so it's suitable when there's no electricity at all – on a trip or during a power outage. A 230V adapter from a charging station draws power from the station, so the battery isn't drained and the car doesn't even need to be connected.

230V adapter from a charging station V2L adapter
Power source The charging station Car battery
Car needs to be connected? No Yes, a vehicle that supports V2L
When it fits In a parking space with a station and no outlet Off-grid, with no electricity at all

Which stations does the adapter work with?

The adapter connects to the cable of an AC charging station. It is not suitable for DC fast charging stations. On a managed or public station that requires activation – activate it before use, and electricity is billed just like regular charging.

What's important to know about safe use?

  • The adapter is single-phase and limited to 16A (about 3.7kW) – like a regular household outlet – even when the station itself is 22kW and supplies up to 32A. Connect devices up to this power.
  • Don't connect splitters and extension cords in a chain.
  • The adapter is meant for powering devices. The car is charged only with the appropriate charging cable.
  • Buy an adapter approved by the Standards Institution of Israel and sealed appropriately for outdoor use.

Which adapter does DSGCharge offer?

DSGCharge offers the 230V adapter from a charging station, model DSG-366: single-phase up to 16A (about 3.7kW), IP65 sealed, with a 12-month warranty and Standards Institution of Israel approval for use in Israel. The current price appears on the product page. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been operating since 2021 and has sold and installed about 20,000 chargers and charging stations across the country. More adapters are in the category Cables and adapters.

Want to know if the adapter suits your station?

Contact us or call 077-9920350, and we'll check the station type and your planned use together.

Frequently asked questions

Can any device be connected to the adapter?

You can connect devices suitable for a regular household outlet. A particularly high-power device may exceed what the station allows.

Does the adapter work on a public station?

Technically it connects to any AC station with a compatible connector, but on a public station you need to activate the station and pay for the electricity. It's worth checking the operator's terms.

Does the adapter drain the car's battery?

No. The power comes from the charging station, and the car isn't connected at all.

Can you charge the car through the adapter?

No. The car is charged only with a charging cable that matches the car's port and the station.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar