Most electric vehicle owners in Israel get along perfectly well with a home AC charging station: the car is parked all night, and the battery is full by morning. But there are homes where the night isn't enough: two or more electric vehicles, high daily mileage, a work vehicle that comes back in the evening and leaves again in the morning, or an American pickup that charges on AC over a single phase only. In these cases a Home DC charging station can be the solution. In this guide we'll explain when it's really justified and when an 11 or 22 kilowatt AC charging station is enough, what electrical connection each model needs, how long charging takes and how much it costs on the TOU tariff.
In short: A home DC charging station is suitable when you need to put a lot of energy into the vehicle in a short time, or when the vehicle's on-board charger limits AC charging. A 20kW station cuts charging of an 80 kWh battery (10%-80%) to about 3.25 hours. It requires a three-phase connection of at least 3X40, and 30-40kW stations require a larger connection. For everyone else, an AC charging station is enough.
What is the difference between an AC charging station and a home DC charging station?
An electric vehicle's battery is always charged with direct current (DC). The question is where the conversion from alternating current (AC) to direct current takes place:
- At an AC station The conversion takes place in the vehicle's on-board charger (On-Board Charger). Even if the station can deliver 22kW, the vehicle will receive only what its on-board charger can process. In many vehicles that's 11kW, and in American pickups with a CCS1 port it's about 7kW, because they charge on AC over a single phase.
- At a DC station The conversion takes place inside the station, and the direct current goes straight into the battery. The on-board charger no longer limits charging, and the power is determined by the station and by the maximum power the vehicle accepts on DC.
In simple terms: a home DC charging station is a small version of a public DC fast charging station, with 20-40kW of power, installed in your parking space.
AC or DC for the home: when is home DC justified and when is AC enough?
Before buying a home DC charger, it's worth answering one question: how many kilowatt-hours do you need to put into your vehicles every 24 hours, and how many hours are the vehicles really parked at home? Here's the comparison:
| Parameter | AC 11kW | AC 22kW | DC 20kW | DC 30-40kW |
|---|---|---|---|---|
| Station price at DSGCharge (excluding installation, as of 11/2026) | ₪1,590 (DSG-1061) | ₪1,790-₪2,390 (DSG-1062 / DSG-1072) | ₪9,428 (DSG-5120) | ₪15,328 (DSG-5130) / ₪22,408 (DSG-5140) |
| Charging time 10%-80%, 80 kWh battery (estimate) | About 6 hours | About 3 hours, only in a vehicle whose on-board charger supports 22kW; otherwise the same as 11kW | About 3.25 hours | About 2.25 / about 1.75 hours |
| Electrical infrastructure | Three-phase, 3X25 is usually enough | Three-phase, usually 3X40 | Three-phase 32A, a connection of at least 3X40 | Three-phase 45A / 63A, connection upgrade or a separate connection |
| Vehicle limit | The onboard charger | The onboard charger | The vehicle's maximum DC power | The vehicle's maximum DC power |
| Suitable for | Most homes: one vehicle, overnight parking | Vehicles that support 22kW AC, two vehicles | American pickup, work vehicle, 2+ vehicles with high mileage | Small home business, farm, small fleet, charging between shifts |
When AC 11/22kW is enough
- The vehicle is parked at home for 8 hours or more on most nights.
- Daily mileage is average, and each night only part of the battery capacity needs to be replenished.
- Two vehicles parked all night: a dual charging station or two AC charging stations with load sharing solve this at a much lower cost.
- Your vehicle supports 22kW AC. In that case a 22kW station will give a charging time similar to a 20kW DC station, at a much lower price.
When a fast charging station for the home is justified
- American pickup (Silverado, Hummer and similar) with a large battery and a CCS1 port, which charges on AC over a single phase only.
- A work vehicle that comes back in the evening and leaves again a few hours later, or a vehicle that does several rounds a day.
- 2 or more vehicles with high mileagethat don't have time to charge one after the other at an AC charging station during off-peak hours.
- A small home business or farm with service vehicles, pickups or vehicles that work in shifts.
- Anyone who wants to finish all the charging within the TOU off-peak window, even when a large amount of energy needs to be put in.
How long does charging take at a home DC charging station?
The table shows estimated charging times from 10% to 80%, which is the range in which most vehicles charge at close to maximum power. This is an Conservative estimate: we assumed an efficiency of about 90% and that the vehicle accepts at least the station's power on DC. In practice, the time depends on temperature, the battery's condition and the vehicle's charging curve.
| Battery (kWh) | Single-phase AC 7.4kW | AC 11kW | DC 20kW (DSG-5120) | DC 30kW (DSG-5130) | DC 40kW (DSG-5140) |
|---|---|---|---|---|---|
| 60 | About 6.5 hours | About 4.5 hours | About 2.5 hours | About 1.75 hours | About 1.25 hours |
| 80 | About 9 hours | About 6 hours | About 3.25 hours | About 2.25 hours | About 1.75 hours |
| 100 | About 11 hours | About 7.5 hours | About 4 hours | About 2.75 hours | About 2 hours |
Note: an estimate only, not manufacturer data. From 80% to 100%, most vehicles gradually reduce power, so this part takes longer relative to the amount of energy. If your vehicle accepts less than the station's power on DC, it will charge at its own power. To calculate based on your vehicle, battery and power, use thecharging time and cost calculator.
What electrical connection does a home DC charging station need?
This is the point on which most projects are decided. A DC charging station draws a high three-phase current from the grid throughout charging, and it shares the connection with the rest of the house: air conditioners, water heater, cooktop and pool pump. According to the manufacturer's specifications, the supply current of each model is:
| Model | Charging power | Electrical connection per specifications | Power from the grid (calculation: 230V x 3 phases) | Connection size for the home (estimate, to be confirmed by an engineer/electrician) |
|---|---|---|---|---|
| DSG-5120 | 20kW DC | Three-phase 32A | About 22 kVA | At least 3X40 (capacity 27.71 kVA). In a home with high consumption, a larger connection or load management may be required |
| DSG-5130 | 30kW DC | Three-phase 45A | About 31 kVA | More than 3X40. Usually an upgrade to 3X63 or a separate connection for the station |
| DSG-5140 | 40kW DC | Three-phase 63A | About 43.5 kVA | 3X63 for the station alone. A whole home requires a larger connection or a separate connection for the station |
The last column is our estimate based on the supply current, not an official connection document. The actual connection size is determined by an engineer or electrician based on a load assessment of the home, and a request for a connection upgrade is submitted to the Israel Electric Corporation (IEC). For comparison, a 3X25 connection provides only about 17.32 kVA, so it isn't enough even for a 20kW DC station at full power.
What else needs to be checked:
- Distance from the panel to the parking space and the cable gauge, because at currents like these they affect the cost.
- Station location: a stable surface, protection from the weather and convenient access for the 5-meter cable (8-meter option).
- Two or more vehicles: if there's also an AC charging station in the home, the combined load of both needs to be planned.
To estimate the installation cost based on the distance and connection type, go to theCharging station installation cost calculator.
What do the Electricity Administration's guidelines require when installing a DC charging station?
On 25.11.2025, the Electricity Administration published “Guidelines for installing an electric vehicle charging system.” According to section 18, they came into force 6 months from the date of publication, i.e. at the end of May 2026 (as of 10/2026). The key points for a home DC charging station:
- Fixed station: DC charging (mode 4) is defined as charging “by means of a fixed charging station,” and a charging station is defined as a device “installed in a fixed installation.”
- Dedicated circuit: The station is supplied from a final circuit dedicated to charging only, with its own circuit breaker and an isolating switch near the station (four-pole for three-phase).
- Certificate of conformity to the standard: A DC charging station requires a certificate of conformity to IEC 61851-23 from an accredited laboratory, and the connector must comply with IEC 62196 (both CCS1 and CCS2 are defined in this standard).
- Who installs: Design, installation and maintenance only by an electrician holding at least a “certified electrician” license.
- Inspection before commissioning: A licensed inspecting electrician inspects the system before it is first put into operation and after any fundamental change.
- Cable: Up to 8 meters, and up to 10 meters only for a station with a cable management system.
- No adapters: “The use of an adapter for the electric vehicle connector is prohibited.” So you choose a station with the connector that fits your vehicle.
DSGCharge installations are carried out according to the current guidelines. For details on the process, see EV charging station installation.
How much does it cost to charge at home with a DC charging station, and how does the TOU tariff affect it?
The price per kilowatt-hour at home is the same for AC and DC. What changes the cost is the Time in which you charge. According to the Electricity Authority's tariff book (prices incl. VAT, as of 10/2026, in effect from 1.7.2026):
| Tariff | Agorot per kWh, incl. VAT | Cost of charging 10%-80% on an 80 kWh battery (about 62 kWh from the grid, estimate) |
|---|---|---|
| Flat tariff | 63.52 | About ₪39 |
| TOU off-peak, winter | 46.63 | About ₪29 |
| TOU off-peak, summer | 50.42 | About ₪31 |
| TOU peak, winter | 114.70 | About ₪71 |
| TOU peak, summer | 172.23 | About ₪107 |
Peak hours: in winter (December-February) 17:00-22:00 Sunday-Thursday; in the transition seasons 17:00-22:00 Sunday-Thursday; in summer (June-September) 17:00-23:00 Sunday-Thursday. All other hours, including weekends in all seasons, are off-peak. Note: a TOU tariff plan requires a meter that measures consumption by the hour.
Here is a practical advantage of a home DC charger: it lets you put a large amount of energy in within the off-peak window, even when you have two vehicles or a pickup with a large battery, without spilling over into peak hours. The flip side of the same coin: a fast charging station tempts you to charge as soon as you get home, exactly during peak hours. In summer, charging like that costs more than 3 times as much as off-peak charging. Use scheduling in the app and start charging after the peak ends. For an exact calculation based on your vehicle and tariff plan, use thecharging time and cost calculator.
20kW DC charging station or 30-40kW: which to choose?
- 20kW DC charging station (DSG-5120), ₪9,428 (as of 11/2026, excluding installation): the natural choice for a private home. It cuts charging time by about 40% compared with an 11kW AC charging station, and in many homes it works with a 3X40 connection.
- DSG-5130, 30kW, ₪15,328 (as of 11/2026, excluding installation): for a work vehicle or two vehicles with large batteries, when you're prepared to upgrade the connection.
- DSG-5140, 40kW, ₪22,408 (as of 11/2026, excluding installation): for a farm, a small business or a small fleet, when you have or are planning a large connection or a separate connection.
According to the product pages, on all three stations you choose a CCS1 or CCS2 connector; they include a built-in 5-meter cable (8-meter option), IP55 sealing, DC (6mA) and AC (30mA) leakage protection, activation via RFID, app or Plug&Charge, and a 24-month warranty. Prices are for the station only, excluding installation. You can see all the models in the category DC fast chargers.
American pickup with CCS1: why does it need a DC charging station?
Electric pickups that come from the US have a CCS1 port. When charging on AC in Israel they receive only a single phase, i.e. about 7kW, and with a very large battery a full charge takes more than 24 hours. A DC charging station with an original CCS1 connector bypasses the on-board charger and charges at the station's power. Because the use of an adapter for the vehicle connector is prohibited, the permanent solution is a station ordered with CCS1. For a full explanation, including charging times for pickup batteries, see the guide Charging station for an electric pickup.
And what about portable DC charging stations?
The DSGCharge store also has DC charging stations in a portable configuration: DSG-5020, 20kW (three-phase 32A, ₪10,990) andDSG-5030, 30kW (three-phase 45A, ₪14,990), prices as of 10/2026, excluding installation. They're compact and useful on farms and at work sites. It's important to know: according to the Electricity Administration's guidelines, DC charging is carried out by means of a station installed in a fixed installation. So before choosing a portable unit, check with an electrician or with DSGCharge how it will be installed, supplied and inspected at your site.
Why buy a home DC charging station from DSGCharge?
DSGCharge, part of S.M.C. Dor HaAtid, has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own – from home AC to DC fast charging. About 20,000 chargers and charging stations sold and installed, and the installation and service teams work nationwide. This way you get the station, the infrastructure check, the installation and the service from the same company. You'll find all the products on the page EV charging stations.
How to get started?
- Check the vehicle registration or the manufacturer's manual for the maximum DC power, the AC power and the port type (CCS1 or CCS2).
- Check the connection size in the electrical panel (3X25, 3X40, etc.).
- Calculate charging time and cost with thecharging calculator and the installation cost with theinstallation calculator.
- leave your details or call 077-9920350. We'll check with you whether DC is really necessary or whether an AC charging station will be enough.
Frequently asked questions
Can a home DC charging station be installed in a private house?
Yes, provided there's a suitable three-phase electrical connection. According to the specifications, a 20kW station requires 32A per phase, i.e. a connection of at least 3X40. 30-40kW stations usually require a connection upgrade or a separate connection. Installation is carried out according to the Electricity Administration's guidelines, including a dedicated circuit and an inspection before commissioning.
How much does a DC charging station for the home cost?
At DSGCharge, a 20kW DC charging station (DSG-5120) costs ₪9,428, a 30kW one (DSG-5130) costs ₪15,328 and a 40kW one (DSG-5140) costs ₪22,408. Prices are as of 11/2026 and don't include installation. The installation cost depends on the distance from the panel and the connection size, and you can estimate it with the installation cost calculator.
Does a 20kW DC charging station charge faster than a 22kW AC charging station?
It depends on the vehicle. If the vehicle's on-board charger supports 22kW AC, charging times will be similar. If the vehicle is limited to 11kW AC, or to a single phase like American pickups, a 20kW DC charging station will charge almost 2 times faster than 11kW AC, and about 2.5 times faster than single-phase AC.
Does fast charging at home harm the battery?
20-40kW is low power relative to the DC capability of most vehicles, which receive much higher power at public charging stations. The vehicle's battery management system determines at every moment how much power to accept. In any case, it's advisable to follow the vehicle manufacturer's recommendations regarding the daily charge level.
Which connector should you choose, CCS1 or CCS2?
According to the port on the vehicle. Most electric vehicles in Israel come with CCS2, while pickups and vehicles imported from the US come with CCS1. On DSGCharge DC charging stations, you choose the connector when ordering. The Electricity Administration's guidelines prohibit the use of an adapter for the vehicle connector, so it's important to order the right connector.
When does it pay to charge at home on the TOU tariff?
During off-peak hours. As of 10/2026, the off-peak price is 46.63-50.42 agorot per kWh incl. VAT, compared with 63.52 agorot on the flat tariff and up to 172.23 agorot at the summer peak. A DC charging station lets you complete a large charge within off-peak hours.