How much does it cost to set up a fast charging station? A full cost breakdown (2026)

Anyone planning a fast charging station at a fuel station, parking facility, mall, hotel or along a highway quickly discovers that the station's price is just one line in the budget. This guide breaks down the cost of setting up a fast charging station into its components: hardware, electrical connection, infrastructure and works, operation and payment processing system, approvals, maintenance and ongoing electricity. That way you can build a real budget and compare quotes.

In short: The cost of setting up a fast charging station consists of seven main components. Hardware starts at ₪24,900 for a 40kW public DC charging station and ₪34,990 for a 60kW station (store prices, November 2026). Stations from 120kW up to 480kW and above are sold by quote. On top of that come the electrical connection, infrastructure, operating system, approvals and maintenance, and they often cost more than the station itself.

You can compare DSGCharge DC charging stations, from 20kW to 60kW with a choice of CCS1 or CCS2, on the page DC fast chargers.

What does the cost of setting up a fast charging station include?

A fast charging station is an infrastructure project, not the purchase of a device. The budget includes the stations, the electricity that supplies them, the on-site works, the system that operates them and collects payment, and service over the years. The difference between quotes from different suppliers usually stems from the components that weren't included in them.

DC fast charging station is a station that converts alternating current from the grid into direct current (DC) inside the station, and feeds it directly into the vehicle's battery. That's why it can deliver tens and hundreds of kilowatts (kW), compared with an AC charging station, which is limited by the vehicle's on-board charger. For the full buying guide by power, see DC fast charging station.

Budget component What it includes What the price depends on
1. Charging stations (hardware) DC charging stations, and sometimes also complementary AC charging stations Power, number of connectors, CCS1 or CCS2 connector, screen, payment terminal
2. Electrical connection A connection upgrade or a new connection from the IEC, and sometimes a transformer The total power, the grid in the area, the Electricity Authority's tariff book
3. Electrical planning and infrastructure Planning, electrical panel, protections, supply cables, earthing Distance from the panel, cable cross-section, number of stations
4. Civil works and parking accessories Foundation, excavation, conduits, asphalt, protective bollards, marking and signage Type of ground, length of excavation, accessibility requirements at the site
5. Operation and payment processing system Cloud management via OCPP, app, credit card payment terminal, communication Number of stations, operating model, branding requirements
6. Inspections and approvals Inspection by an inspecting electrician, coordination with the IEC and the local authority Size of the installation, permits required at the site
7. Ongoing operation Electricity, maintenance, communication, service and availability Electricity tariff (including TOU), level of use, service agreement

As of November 2026. Exact prices for each component are given only after a site survey.

How much does a DC fast charging station itself cost?

The hardware price depends mainly on the power. In the DSGCharge store, the prices of the public charging stations are (as of November 2026, for the station only, excluding installation):

Model Power Best for Store price
DSG-5240 DC 40kW Parking facilities, businesses, vehicle fleets, stays of an hour or more ₪24,900
DSG-5260 DC 60kW Malls, hotels, urban fuel stations ₪34,990
DSG-7420 DC 120kW Fuel stations, highways, short stops By quote
DSG-7480 / DSG-7540 DC 180kW / 240kW Charging hubs on main highways By quote
DSG-6052 Dual AC 22kW A complementary station for long stays ₪6,990

All DSGCharge public charging stations are managed via OCPP from a cloud computing system, and the DC charging stations are ordered with a choice of CCS1 or CCS2 connector. CCS2 is the common plug in Israel for fast charging; CCS1 is needed mainly for pickups and American vehicles. In large projects, DC charging stations with power of up to 480kW are available.

How much does the electrical connection for a fast charging station cost?

The electrical connection is the component that's hardest to estimate in advance, because it depends on the condition of the grid in the area and the existing connection at the site. The payment to the Israel Electric Corporation (IEC) for a new connection or a connection upgrade is set according to the Electricity Authority's tariff book (chapter 4, connection tariffs, including a dedicated table for industrial and commercial buildings), so it isn't open to negotiation with the supplier.

To understand the order of magnitude, it helps to translate power into current. At a three-phase voltage of 400 volts, every 10kW requires roughly 14-15 amps per phase:

  • A 60kW station: roughly 90 amps per phase.
  • A 120kW station: roughly 175 amps per phase.
  • Two 120kW stations or one 240kW station: roughly 350 amps per phase.

The larger the existing connection at the site, the smaller the addition. At high power levels, a high-voltage connection and a dedicated transformer may be needed, which change the budget significantly. That's why the first step in any project is checking the existing connection against the planned power.

Load management (dynamic distribution of the available power among the stations) can save a connection upgrade: for example, two stations that share power when they operate together and receive full power when only one is in use.

What infrastructure and works costs should you budget for?

Infrastructure costs are determined mainly by the distance between the electrical panel and the stations. At DC power levels the cables are thick and expensive, so every meter of excavation and cable affects the price. The cheapest location is usually the one closest to the panel, provided it's convenient and accessible for drivers.

  • Electrical design and coordinating the supply with the existing panel.
  • Panel, circuit breakers and protections, including an RCD and earthing according to the Electricity Administration's guidelines (November 2025).
  • Concrete foundation for a free-standing station, excavation, conduits and asphalt restoration.
  • Parking accessories: protective bollards, stoppers, parking space marking, lighting and signage. For details, see the guide toCharging station cabinet and parking accessories.

For an initial estimate of the installation cost by distance and power, use theCharging station installation cost calculator.

How much do the operating system, payment processing and app cost?

A public station needs a system that operates the stations, collects payment, displays price and availability and reports faults. OCPP (Open Charge Point Protocol) is an open communication protocol between the station and the cloud management system, which enables remote control, permissions, pricing and reports.

According to Electricity Authority decision 73006 (31.12.2025, in effect from 26.7.2026), fast and ultra-fast charging stations must have a credit card payment terminal that allows payment without registration and without an app: at new stations from 1.1.2027, and at all stations from 1.1.2028. In its regulatory analysis of the decision, the Authority estimates the cost of the terminal at “thousands of shekels per station.”

DSGCharge supplies Public charging station management system in full: cloud management, a user app, payment terminals, license plate recognition cameras, pricing, payment processing and reports. All the systems are developed in-house by DSGCharge and can be customized and branded to the customer's requirements (White Label). For an explanation of the protocol, see OCPP managed stations.

Which approvals and regulatory requirements affect the cost?

Electricity Authority decision 73006 sets a framework for operators of public charging stations. An operator with a total capacity of up to 8 megawatts is exempt from a license, subject to the exemption rules; above 8 megawatts, a license is required. According to the Authority, 8 megawatts is roughly 50 DC fast charging stations, so most location owners will fall within the exemption.

The requirements that affect the budget:

  • Clear price display near the station.
  • A credit card payment terminal at fast charging stations (according to the timetable above).
  • Availability information that reflects the station's working condition.
  • No discrimination between occasional and regular customers.
  • Compliance with the Ministry of Energy's cybersecurity guidelines.

In addition, an inspection by an inspecting electrician is required before commissioning. DSGCharge products have Standards Institution of Israel (SII) approvals.

What does the ongoing operation of a fast charging station cost?

The big ongoing cost is electricity. According to the Electricity Authority's tariff book (July 2026), the TOU tariff also applies to low-voltage consumers connected with a connection of 3×200 amps or more and consuming more than 40,000 kWh per year. TOU tariff (load and time tariff) is a tariff in which the price per kWh changes by season and hour. Peak hours apply only Sunday-Thursday, and weekends are off-peak hours in all seasons.

Beyond electricity, budget for cellular communication for the stations, licensing or a subscription to the management system, payment processing fees, preventive maintenance and service calls. Depending on usage, it's also worth considering a warranty extension.

Example: what does a budget for a mall parking facility look like?

Suppose a mall wants to start with two 60kW DC charging stations for short visits and two 22kW dual AC charging stations for long stays. The hardware component alone, according to store prices in November 2026:

Item Quantity Price per unit Total
DSG-5260 public DC charging station 60kW 2 ₪34,990 ₪69,980
DSG-6052 public dual AC charging station 22kW 2 ₪6,990 ₪13,980
Total hardware ₪83,960

To this amount will be added the electrical connection, infrastructure, works, operating system and approvals. With load management, you can start with a smaller connection and upgrade later, according to actual usage.

What should you ask for in a quote to compare properly?

Quotes for a fast charging station look very different from one another, because each supplier includes different components. Ask that each quote itemize separately:

  • Model, power, number of connectors and connector type (CCS1 or CCS2) for each station.
  • Whether the payment to the IEC is included, or is your responsibility.
  • The length of cables and excavation that was priced, and the price per additional meter.
  • The management system: does it support OCPP, how much does it cost per month, and what do the payment terminal and app include.
  • Warranty terms, fault response times and spare parts stock in Israel.

How do you lower the setup cost?

  1. Match the power to the length of stay. In a parking facility where people stay for two hours, a 40-60kW station and complementary AC charging stations will be enough, and there's no need for 240kW. The guide toCharging stations for parking facilities details the match by parking facility type.
  2. Place close to the panel to shorten cables and excavation.
  3. Users with load management before upgrading the connection.
  4. Plan in stages: Lay infrastructure for future stations already during the first excavation.
  5. Consider a partnership: Location owners can set up stations with DSGCharge with no financial investment on their part. The revenue split is determined by the location and is subject to a feasibility check.

Who builds fast charging stations in Israel end to end?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, and about 20,000 chargers and charging stations have been sold and installed, with installation and service teams nationwide.

In a fast charging station project, DSGCharge accompanies all the stages: site survey, choice of stations, electrical planning, installation, operation and payment processing system, and service and maintenance. For details on the service, see Setting up public charging stations.

Want a budget for your site? leave your details or call 077-9920350, and we'll get back to you with a site survey and a detailed quote for each component.

Frequently asked questions

How much does it cost to set up a fast charging station?

There's no single price. Hardware starts at ₪24,900 for a 40kW DC charging station and ₪34,990 for a 60kW station (in the DSGCharge store, November 2026). The electrical connection, infrastructure, operating system and approvals are priced according to the site, after a survey.

What is the most expensive component of a fast charging station?

At high power levels, the electrical connection and infrastructure often cost more than the stations themselves, especially when a significant connection upgrade or a transformer is required.

Is a credit card payment terminal mandatory at a DC fast charging station?

Yes. According to Electricity Authority decision 73006, new fast and ultra-fast charging stations require a credit card payment terminal from 1.1.2027, and all stations from 1.1.2028.

Do you need a license to operate public charging stations?

An operator with a total capacity of up to 8 megawatts is exempt from a license, subject to the Electricity Authority's exemption rules. Above 8 megawatts, a license is required.

Can you set up a charging station without investing?

Location owners can set up stations with DSGCharge in a partnership model, with no financial investment on their part. The revenue split is determined by the location and is subject to a feasibility check.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar