Charging stations for public institutions: hospitals, colleges and government offices (2026)

A guide for public institutions: which stations for employees, visitors and fleets, what Decision 73006 requires of a parking facility open to the public, load management, per-user billing, and procurement and partnership options.

In short: Charging stations for public institutions are planned according to who parks: for employees who park all day, managed 22kW AC stations with load management are the right fit; for visitors at a hospital or college, public dual charging stations; and for service vehicles between shifts, 20-60kW DC stations. A station that is open to the public is subject to Electricity Authority decision 73006 of 26.7.2026.

Updated: November 2026

This guide is intended for logistics, maintenance and operations managers at hospitals, colleges and universities, government ministries, local authorities and public companies. It answers the questions that come up in every such project: how many stations and of what type, how to separate employees from visitors, how to collect payment, and what regulation requires of an institution whose parking facility is open to the public.

Why do public institutions need charging stations now?

A public institution serves three groups that already drive electric cars: employees, visitors and the institution's own vehicle fleet. Without stations on site, employees look for charging during working hours, visitors arrive with an empty battery, and the institution's service vehicles depend on external stations.

The gap in the public sector is documented. According to the State Comptroller's report on the Government Vehicle Administration (November 2022), the government fleet operated about 4,500 vehicles, and government ministries had only six charging points. The Comptroller recommended promoting the installation of charging stations at government ministries on a scale that would support increasing the number of electric cars in the fleet, in light of the targets of government decisions on the transition to electric vehicles.

What type of charging station is right for a public institution?

The rule is to match the power rating to the parking time. An employee who parks for eight hours doesn't need fast charging, and a 22kW AC station is enough even at reduced power. A service vehicle that returns to the parking facility for an hour between shifts needs a DC station.

Short definition: AC is alternating current, and the charger inside the car converts it for the battery, so the rate is limited to the power the car accepts. DC is direct current that the station feeds directly into the battery, so it is faster and more expensive to set up.

Who charges Typical parking time Recommended station type Notes
Employees on a shift or workday 6 to 12 hours Managed AC 22kW Load management, card identification, billing or benefit according to policy
Visitors and patients 1 to 4 hours Public dual AC 2x22kW Open to the public, payment and price display under 73006
Students at a college or university 3 to 8 hours Managed AC or public dual Different pricing for subscribers and occasional users
Service vehicles, fleet vehicles 30 to 90 minutes between trips DC 20-60kW Reserved spaces for the fleet, reports per vehicle

As of November 2026. The number of stations is determined after an electrical site survey of the parking facility, and not by the number of parking spaces alone.

Does Electricity Authority decision 73006 apply to stations at a public institution?

It depends on whether the station is open to the public. Under Electricity Authority decision 73006 (31.12.2025, in force from 26.7.2026), a dedicated station – that is, a station in a public place that is not open to the public and is intended mainly for employees on site – is exempt from the rules. So is a station in a private place.

A station in the visitor parking of a hospital, college or government office that is open to the public is a station in a public place. Its operator is exempt from a license only if the cumulative power of all the stations it operates in public places does not exceed 8 megawatts, and subject to conditions. The decision's definition of a public place refers to the Equal Rights for Persons with Disabilities Law, so in a borderline case it is worth checking with the institution's legal counsel.

Type of station at the institution Status under 73006 What's required
Stations for employees only, in a parking facility closed to the public Dedicated station, exempt Electricity Administration guidelines for installation and testing only
Stations for visitors, operator up to 8MW Exempt from a license, subject to conditions Price display, stopping charging at any moment, no discrimination against occasional customers, Ministry of Energy cyber guidelines
Fast stations for visitors (50-150kW) and ultra-fast stations (over 150kW) Same as the previous row Also a credit card payment terminal without registration: for new stations from 1.1.2027 and for all stations from 1.1.2028
Operator over 8MW (about 50 DC stations or about 350 AC stations) License required License from the Electricity Authority

As of November 2026, according to the text of the decision and its explanatory notes. Under the decision, a station of up to 50kW is a slow station, so AC stations and 20-40kW DC stations are not required to have a payment terminal. The details are in the guide Credit card payment terminal for a charging station.

How do you separate employees, visitors and the vehicle fleet in the same parking facility?

In a managed system, every charging session is linked to a user, a card or a vehicle, so you can define permissions and a tariff for each group. An employee identifies with an RFID card, a visitor pays via the app or a payment terminal, and a fleet vehicle is identified by its license plate number.

Short definition: OCPP is an open communication protocol that connects the stations to a cloud management system. Through it you define who may charge, at what power and at what price, and receive reports. The details are in the guide OCPP managed stations.

  • Employees: An RFID card for each employee (an additional card DSG-9988 costs ₪69 in the store), free charging, at cost or deducted from salary, according to the institution's policy.
  • Visitors: Stations open to everyone, with a displayed price and payment methods under 73006.
  • Vehicle fleet: Reserved spaces, priority in load management and a consumption report for each vehicle. Combined with EV fleet management from DSGCharge, you can also monitor the vehicles and reimburse employees for home charging expenses.
  • Preventing blocking: License plate recognition at a charging station makes it possible to activate stations for authorized vehicles only and to identify a vehicle occupying a station without charging.

How many stations can be installed without increasing the institution's electrical connection?

In a large institution, the connection serves departments, laboratories, air conditioning and elevators, so the available capacity during daytime hours is limited. Dynamic load management distributes the available power between the stations, making it possible to install more stations than the connection would allow if they all charged at full power.

Short definition: Load management is a system that measures the building's consumption in real time and reduces the charging power when consumption rises. This way the stations don't trip the main circuit breaker and don't require a connection upgrade at the first stage. It's recommended to plan the infrastructure – that is, conduits, a panel and space for stations – for more parking spaces than you install today, and to add stations gradually.

Which DSGCharge stations are right for public institutions?

DSGCharge sells, installs and manages AC and DC stations for institutional parking facilities. All public stations are managed via OCPP from a cloud system, and DC stations are ordered with a CCS1 or CCS2 connector of your choice. The prices in the table are store prices.

Model Type and power rating Use at the institution Store price
DSG-6012 Managed AC 22kW, single connector, OCPP Employee parking lot ₪3,290
DSG-6052 Public dual AC 2x22kW, wall-mounted Visitor parking, students ₪6,990
DSG-6112 Public dual AC 2x22kW, floor-standing Open parking facility without a wall ₪7,990 (instead of ₪9,900)
DSG-5220 Public DC 20kW Service vehicles ₪15,900
DSG-5240 Public DC 40kW Vehicle fleet, charging between shifts ₪24,900
DSG-5260 Public DC 60kW Busy fleet, short-stay visitors ₪34,990

As of November 2026. Prices are for the station only, without installation. All public stations are shown on the Public charging stationspage, and the products hold Standards Institution of Israel (SII) approvals.

How does a public institution purchase charging stations: tender, framework agreement or partnership?

Government ministries, government companies and public corporations usually purchase through a tender under the Mandatory Tenders Law, 5752-1992, and local authorities under the tender laws that apply to them. The exact procurement path is determined by the institution's legal counsel and tenders committee.

In practice, there are three common models:

  • Purchase and self-operation: The institution buys the stations and the management system, sets tariffs and receives the revenue.
  • Purchase with an operating service: The institution buys the stations, and DSGCharge manages them in the cloud, bills users and provides maintenance.
  • Partnership: DSGCharge sets up, manages and maintains the stations in a parking facility that is open to the public. No financial investment on the institution's part; the revenue split is determined by location and subject to a feasibility check.

In a tender, it's worth requiring stations that support OCPP, Standards Institution of Israel (SII) approvals, load management, payment methods under 73006, maintenance with defined response times and consumption reports. The topic is expanded on in the guides Charging stations for local authorities andMaintenance of public charging stations.

What are the guidelines for installing and testing stations in a public parking facility?

According to the Electricity Administration's guidelines for installing an EV charging system (25.11.2025), in an open parking facility or next to a sidewalk, charging is done only at a fixed charging station, installation is carried out by an electrician, and the system is tested by an inspecting electrician before first operation. Stations are also subject to periodic inspections.

In a public parking facility, it's also worth planning signage, mechanical protection for the stations, cable routing that doesn't cross pedestrian walkways, and lighting in advance. The details are in the guide Charging station installation guidelines.

Why choose DSGCharge for a public institution?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and installation and service are provided nationwide.

For an institution, this means a single point of contact for the entire project: electrical site survey, AC and DC stations, installation, load management, per-user billing and maintenance. ForSetting up public charging stations DSGCharge also provides Public charging station management system: cloud management, an app, payment terminals and license plate recognition cameras. The system was developed by DSGCharge and can be customized and branded with the institution's name.

Want a tailored quote?

Tell us how many employees, visitors and fleet vehicles charge at your site and the size of the parking facility, and the DSGCharge team will plan the type of stations, load management and billing method. to leave your details, for an initial estimate with theinstallation cost calculator, or by phone at 077-9920350.

Frequently asked questions

Which charging station is right for an employee parking facility at a public institution?

A managed 22kW station with load management and card identification, such as DSG-6012 (₪3,290 in the store, as of November 2026). An employee who parks all day gets a full charge even at reduced power.

Are charging stations for employees only subject to decision 73006?

No. Under Electricity Authority decision 73006, a dedicated station that is not open to the public and is intended mainly for employees on site is exempt from the rules. The Electricity Administration's guidelines for installation and testing apply to it.

Is a credit card payment terminal mandatory at stations in visitor parking?

Only at fast (50-150kW) and ultra-fast (over 150kW) stations that are open to the public: for new stations from 1.1.2027 and for all stations from 1.1.2028. AC stations and DC stations of up to 50kW are not required to have a payment terminal.

How do you bill employees and visitors separately?

In a system managed via OCPP, every charging session is linked to a user. For employees, you set up an RFID card and a tariff or benefit according to the institution's policy, and for visitors, payment via the app or a payment terminal with a displayed price.

Can charging stations be set up at a public institution without investment?

In a parking facility open to the public, under DSGCharge's partnership model: no financial investment on the institution's part; the revenue split is determined by location and subject to a feasibility check. The procurement path is determined with the institution's legal counsel.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar