Charging stations for parking facilities: how a parking lot owner profits from charging stations

Thinking about setting up a public charging network in your parking lot? Discover the recommended business models, the profit potential and the steps to launching a venture that will earn you money. The complete guide for entrepreneurs.
A network of modern charging stations in a lit underground parking facility

Charging stations for parking facilities have already become a commercial consideration, not just a service. EV drivers choose where to park based on the option to charge, and they stay longer. In this guide we'll go over the business models available to a parking lot owner, how to choose between AC and DC, how many stations to install at first, and what the Electricity Authority's new regulation requires of public charging station operators.

In short: A parking lot owner can profit from charging stations in three ways: a partnership in which the operator sets up, manages and maintains the stations; leasing space to an operator; or buying and operating the stations yourself. In parking lots where cars stay for hours, 22kW dual AC charging stations are the right fit; for short stays, a DC station fits. Start with a feasibility check of the electrical connection and the length of stay, and expand according to demand.

The models and prices of Public charging stations can be found in our store.

Why are charging stations for parking facilities a business decision?

A charging station creates three kinds of value for a parking lot owner. The first is direct income from the electricity sold, or a share of it under a partnership model. The second is traffic: a driver looking for an available station will choose a parking lot that offers charging, and at a mall or hotel they'll also stay and use the services. The third is property value, because commercial tenants and office owners are increasingly asking about a charging solution for employees.

This value depends on three variables: how long a car stays in the parking lot, how much electrical power is available, and who carries the operational workload. These determine the choice of model and type of station.

What business models are available to a parking lot owner?

Before choosing a product, it's worth deciding who invests and who operates. The table summarizes the three common models.

Model What the parking lot owner provides Who sets up and operates Source of income for the parking lot owner Best for
Charging station partnership Space and electrical infrastructure The operator sets up, manages and maintains Revenue sharing set according to the location, per the agreement Malls, hotels, local authorities and properties on main roads that want income without managing the service
Leasing space to an operator Parking spaces only The operator, usually including the infrastructure Fixed or variable rent, per the agreement Those who prefer predictable income and have no infrastructure available
Purchase and self-operation Everything: stations, infrastructure, management The parking lot owner, with a management and payment system All the income, minus electricity, operating and maintenance costs Parking operators, local authorities and properties with an operations team that want control over pricing

At DSGCharge the leading model is a partnership: the site owner provides space and infrastructure, and DSGCharge sets up, manages and maintains the stations, with no financial investment on your part; revenue sharing is set according to the location and subject to a feasibility check. Full details are on the page Charging station installation partnership. If you prefer to buy and operate the stations yourself, you can buy them directly from the importer and add a management system.

Charging stations for parking facilities: AC or DC based on length of stay?

The simple rule: length of stay determines the power. If the car stands for hours, an AC station is enough and costs much less to set up and connect. If the driver stops for half an hour, only DC will give them a meaningful amount of energy. Keep in mind that many vehicles accept less than 22kW on AC because of the car's onboard charger, so even at a 22kW station the actual charging rate depends on the vehicle.

Parking facility type Typical dwell time Recommended station type Note
Overnight parking (residential, assisted living, residents' parking) 8 hours or more AC, even at low power per vehicle Load management is especially important here, because many cars are connected at the same time
Office parking lot Workday 22kW dual AC charging station or a managed charging station Power can be shared between vehicles throughout the day
Mall and shopping center 1–3 hours A combination: dual AC charging stations for most spaces and one or two DC stations DC attracts drivers who come specifically to charge
Hotel One night or more Dual AC 22kW Guests arrive in the evening and leave in the morning
Municipal public parking lot Mixed: minutes to a full day Dual AC charging stations, and DC at high-turnover locations For charging stations in public parking lots, local authorities can split: AC for residents, DC at traffic hubs

To estimate how much energy a customer will get during their stay in your parking lot, enter the station power and time in the Charging time calculator. This way you can check whether two hours at the mall on AC are enough for customers, or whether you need DC.

Which stations are suitable for a parking facility?

All DSGCharge public charging stations, AC and DC, are managed via the OCPP protocol from a cloud computing system: user identification, pricing, payment processing, load management and remote fault monitoring.

How many stations should you install at first, and how do you manage loads in a parking facility?

The common mistake is to start from the final number. It's better to start from what the existing connection allows, build infrastructure (conduits, panel, cabinet space) for the next stage, and add stations as usage grows.

Example: a 3X40 amp three-phase connection provides about 27.7kVA. Two 22kW dual charging stations at full power require more than that. With a load management system, power is divided among the connected vehicles according to what's available, so you can connect more charging points without immediately upgrading the connection. Each vehicle will charge more slowly at peak times, but in a parking lot where cars stand for hours this is usually not noticeable.

Rules of thumb for planning:

  • Check the actual available power, not just the connection size. A parking lot that also has lighting, elevators and air conditioning leaves less power for charging.
  • Plan according to the average length of stay and the expected number of electric vehicles, not the number of parking spaces.
  • Prefer stations that can be managed remotely, so you can add stations and change power allocation without replacing equipment.

Managing charging stations in a parking facility also includes permissions (who may charge), pricing by time of day, fault monitoring and consumption reports. For a residential parking garage or an office building, the same principles are detailed on the page Setting up and managing charging systems in buildings.

What's needed in terms of electricity and coordination with the IEC?

Setting up charging stations in a parking facility starts with checking the existing connection: the connection size, the available power, the distance from the panel to the stations and space for installing a sub-panel. If the power isn't sufficient, there are two options: load management within the existing connection, or a request to the Israel Electric Corporation (IEC) for a connection upgrade. A connection upgrade requires design and approval, so it's worth looking into it early, especially when planning DC.

Installation is performed by an electrician holding at least a certified electrician license. Under the Electricity Administration guidelines (11/2025), the station owner tests the RCD with the test button and carries out a visual inspection at least once a year, and an electrician inspects the system and tests the RCDs with an instrument at least once every six years. When the RCD is the only protection against electric shock, the test-button check is required every six months and the instrument test every two years (as of 10/2026). Full details of all the requirements are in the guide Guidelines for installing an EV charging station.

Payment and apps: what does the new regulation require?

The Electricity Authority published a regulation for public charging stations (Decision 73006 of 31.12.2025), which took effect on 26.7.2026. The main points relevant to a parking lot owner (as of 10/2026):

  • Who needs a license: An operator of stations in a public place with a cumulative capacity of more than 8MW. Up to 8MW the operator is exempt from a license but must still meet the set conditions. According to the Authority, 8MW is equivalent to about 350 AC stations or about 50 DC stations.
  • Obligations on the operator: The regulation places the obligations on the station operator, not explicitly on the landowner. In a partnership model, the operator is responsible for meeting them.
  • Price display (from 1.1.2028 under the exemption rules): At a slow station (up to 50kW) the price will be published online or next to the station; at a fast station (50-150kW) and an ultra-fast station, clearly next to the station.
  • Credit card payment: Fast and ultra-fast stations require a credit card payment terminal compliant with the EMV standard. New stations put into operation from 1.1.2027 must have one from the start, and existing stations from 1.1.2028. At slow stations, a licensed operator will allow payment without registration and without an app, for example with a QR code.
  • Charging for occupying a station: It is permitted to charge for a vehicle that stays connected after charging is complete, provided the customer has been notified and only after a reasonable time.
  • No discrimination: Any occasional customer may charge, with no preference for regular customers other than price.

Note: by definition, a 40kW DC station counts as a slow station for the purposes of the regulation. A station dedicated to the site's employees that is not open to the public is exempt from these rules.

Accessibility and signage: what should you plan?

The regulation uses the definition of “public place” from the Equal Rights for Persons with Disabilities Law. As of 10/2026 we have not found a binding regulation that sets a specification for accessible charging parking. Access Israel recommends at least one accessible, signposted station for every ten stations, a parking space about 250 cm wide and about 500 cm long with an access area, and a screen and controls at a height of up to 130 cm. This is a recommendation, not an obligation, but it's easy to implement at the planning stage and expensive to fix later.

For signage, make sure it's clear from which space charging is allowed, what the price is and how to pay, and how to contact service in case of a fault. Clear signage reduces stations being blocked by vehicles that aren't charging.

Which parking accessories complement the stations?

Common mistakes parking lot owners make

  1. Choosing DC because it's “faster” in a parking lot where cars stand all day. The investment is much higher, and the benefit to the customer is small.
  2. Installing a single station without management and payment. Without user identification and payment, every charging session is free electricity, and there's no control over who charges and when.
  3. Not checking the available power and discovering after installation that the stations trip the connection or that an upgrade is needed.
  4. Placing stations far from the panel because that's where the free parking spaces are. Every meter of cable adds to the setup cost.
  5. Not planning maintenance. An out-of-service station undermines customer trust, and the regulation requires availability information to reflect whether the station is working.
  6. Signing an agreement without clarifying who is responsible for regulatory compliance, who pays for the electricity and what happens at the end of the term.

Why DSGCharge?

DSGCharge, part of S.M.C. Dor HaAtid, has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own: AC stations up to 22kW including dual stations, and DC fast and ultra-fast stations up to 480kW. About 20,000 chargers and charging stations have been sold and installed, and installation and service are provided nationwide by dozens of installation and service teams. As the importer, we supply the equipment, installation, management system and maintenance from a single source. For planning charging for employees and company cars, see Charging stations for businesses. For businesses planning fast charging, see also DC fast charging station for businesses.

How do you get started with DSGCharge?

  1. Initial inquiry: Tell us about the parking lot: location, number of spaces, typical length of stay and connection size.
  2. Feasibility check: We check the available power, the distances and the expected demand.
  3. Choosing a model: Partnership, or buying and operating yourself with a management system.
  4. Planning and coordination: Number of stations for the first stage, load management and, if needed, coordination with the IEC.
  5. Installation and commissioning: Installation, signage, parking accessories and connection to the management and payment system.

Want to check whether your parking lot is suitable? Read about Setting up public charging stations with DSGCharge, or leave your details for a feasibility check and we will get back to you.

Frequently asked questions

Does a parking lot owner need to invest money to set up charging stations?

Not necessarily. In a partnership model with DSGCharge, the site owner provides space and infrastructure, and DSGCharge sets up, manages and maintains the stations, with no financial investment on the owner's part; revenue sharing is set according to the location and subject to a feasibility check. When buying and operating independently, the parking lot owner invests in the stations and infrastructure and receives all the income.

Does a parking lot owner need a license from the Electricity Authority?

Under Decision 73006, a license is required for an operator of stations in a public place with a cumulative capacity of more than 8MW. A smaller operator is exempt from a license but must meet the set conditions. In a partnership model, the operator is responsible for regulatory compliance (as of 10/2026).

How many stations should you install at first?

As many as the existing connection allows with load management, with infrastructure ready for expansion. Start with dual AC charging stations based on length of stay, and add stations as usage grows.

Is it mandatory to allow credit card payment?

Fast and ultra-fast stations (over 50kW) require a credit card payment terminal: for new stations put into operation from 1.1.2027, from the start, and for existing stations from 1.1.2028. At slow stations, a licensed operator will allow payment without registration and without an app.

Which is better at a mall: AC or DC?

Usually a combination: 22kW dual AC charging stations for most spaces, because customers stay one to three hours, and one or two DC stations for drivers who come specifically to charge. The charging time calculator helps you check how much energy a customer will get.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 