Charging station at a hotel: how to plan a charging service for guests who arrive and leave every day

A guide for hotels and guesthouses on properly planning an EV charging station when guests change every day. What to check in the infrastructure, how to choose the power and what's important to know about payment processing and load management.
Charging station at a hotel: how to plan a charging service for guests who arrive and leave every day

A guest arrives at six in the evening with an electric vehicle that has twenty percent charge left, and leaves the next morning by car. Another guest arrives for a whole week and expects a full charge without giving it a second thought. The challenge for a hotel or guesthouse isn't the same as for a private house or residential building: here there's no permanent resident who knows the station, but a changing stream of guests with different vehicles, short stays, and sometimes an expectation that charging will be a natural part of the service they're paying for.

Hotel and guesthouse managers who look into a charging station quickly discover that the main question isn't “how much does a station cost,” but “how do I plan a number of stations that fits the size of my property, without the electricity facing an unexpected load, and without creating a situation where one guest occupies a station for two days because they forgot their car is already full.” This is exactly the point where proper planning makes the difference between a service that adds value for the guest and a source of complaints and unmanaged load on the property's electrical system.

Why a hotel parking facility is different from a residential building or a private parking lot

In a residential building there's usually a known number of residents, each with one or two vehicles, and a charging pattern that repeats itself: arrive in the evening, charge overnight, leave in the morning. In a hotel parking facility the situation is the opposite. A guest who arrives today won't be here in a week. A vehicle that charges tonight will be replaced tomorrow by another vehicle, sometimes with a completely different power requirement. This means the hotel needs to plan not only by the number of parking spaces, but for high guest turnover and stays that can be relatively short.

Another point that distinguishes a hotel from an office or a commercial building is the hours of use. In an office, most charging happens during the day while employees are at work. In a hotel, charging is concentrated mainly in the evening and night hours, when all the guests return at roughly the same time window and look for an available station. This creates a predictable peak load which, if not taken into account when planning the infrastructure, can lead to a situation where two or three stations simply aren't enough, or the existing electricity on site isn't built to supply several stations operating at the same time.

How many stations do you really need, and what determines it

There's no uniform number that suits every hotel or guesthouse. The right size is derived from several factors: the number of guest rooms and the size of the parking facility, the percentage of guests arriving by private car, and the character of the hotel (a business hotel in the city versus a rural guesthouse, for example, can generate completely different demand). A small hotel with limited parking can start with one or two stations and test the actual demand, while a large hotel or hospitality center with many parking spaces may need broader planning from the start, so as not to have to dig and reinstall a year from now.

The important question at this stage isn't just “how many stations,” but also “what power for each station.” An AC charging station with power suited to home charging may be enough for a guest staying a whole night, but not necessarily for a guest arriving for a short visit who needs a significant top-up in a short time. Planning that takes into account the average length of stay of the hotel's guests is the basis for choosing the stations' power, not just their number.

Electrical infrastructure: what to check before deciding how many stations

Before you start talking about the number of stations and power, there's a question that comes before all the others: what is the condition of the hotel's existing electrical infrastructure. An infrastructure check before installation examines how much load can be added to the existing electrical panel, what the distance is between the electrical panel and the parking facility, and whether conduits, excavation or infrastructure expansion will be needed to connect the stations. In an older building that wasn't originally designed for the power consumption of several charging stations at once, components in the electrical panel itself sometimes need to be upgraded as well.

This check is exactly where DSGCharge comes into the picture already at the planning stage, not just at the installation stage. At DSGCharge, a professional infrastructure check before installation is a built-in step in the process, so the hotel knows in advance whether the existing infrastructure is sufficient for the planned number of stations, or whether an upgrade needs to be planned before moving forward. Skipping this step is one of the common mistakes: a hotel that orders stations without checking the infrastructure may end up in a situation where the stations are installed but not all of them can operate at the same time at full load.

Load management when all the guests return at about the same time

One of the issues hotel managers don't necessarily think about in advance is what happens when five guests return from a day trip between six and eight in the evening, and they all want to plug in at the same time. If the infrastructure and the system weren't designed to support this load, the result can be lower charging power at each station, or even a practical limit on the number of stations that can operate together.

A managed charging system with load management solves this problem smartly: it distributes the available power among the stations that are active at any given time, so if there are five stations but the infrastructure allows a load suited to three stations at full power, the system will divide the power among all the stations actually in operation, rather than overloading the panel or causing a disconnection. This is exactly one of the reasons hotels and guesthouses, like apartment buildings and shared parking facilities, use managed charging systems rather than individual stations connected directly without coordination between them.

Payment and processing: what happens when the guest doesn't know the station

In a residential building, the resident knows which station is theirs and how to use it. In a hotel the situation is fundamentally different: the guest usually arrives for the first time, doesn't know the system, and isn't sure whether charging is included in the room service, billed separately, or requires registration. This is where payment processing and billing come into the picture, an integral part of planning a charging station at a place that hosts a changing clientele.

Some hotels choose to offer charging as an included service, and some prefer separate billing by consumption, similar to the way public parking facilities and commercial centers operate. The choice between the models depends on the business itself, but in both cases you need a system that enables consumption tracking, user identification (whether via an app, an RFID card or coordination with the reception desk staff), and permission management that doesn't depend on a staff member's memory of who charged and when. This is exactly the kind of solution DSGCharge builds for customers with a changing user base: an end-to-end solution that includes the station itself, together with a management system, an app, support forOCPP and payment processing, so the hotel doesn't have to figure out on its own how to bill a guest who will never return to the same station.

What can go wrong without proper planning

  • One available station that a guest “forgets” their car at after charging has finished, blocking another guest who is waiting
  • Unscheduled load in the evening hours that slows down the power at all the stations
  • Lack of clarity for the guest about whether charging is included in the price or billed separately
  • Infrastructure that wasn't checked in advance and doesn't support the number of stations the hotel wanted to install
  • AC power that's too low for guests staying just one night who need faster charging

Each of these points seems easy to solve in hindsight, but it usually stems from a decision made without sufficiently early planning, before the expected scope of use was understood.

What's worth checking before choosing stations for a hotel

  • The size of the parking facility and the percentage of guests arriving by private car, as a basis for estimating the number of stations
  • The condition of the existing electrical infrastructure and the distance between the electrical panel and the parking facility
  • The average length of stay of guests, as a basis for choosing the station's power
  • Which payment model suits the business – included in the service or billed by consumption
  • Whether a load management system is needed to support several stations at peak load

A hotel or guesthouse that goes through this process arrives at a consultation meeting with a clear picture of its needs, and not just with the question “how much does a station cost.” This makes it possible to plan a type of infrastructure suited to the character of the property and the actual guest traffic, instead of installing individual stations and discovering later that they don't meet demand at peak hours. DSGCharge specializes in exactly these kinds of projects: planning charging stations for buildings with a changing user base, including infrastructure checks, power matching, a load management system and payment processing, so the hotel gets a solution that works both when all the guests return at the same time and when the mix of guests changes every day.

The total price of such a project varies depending on the number of stations, the type of station chosen, the distance from the electrical panel, whether conduits or excavation are needed, whether it's a single-phase or three-phase connection, and whether a load management system and communication between the stations are required. In any case, the installation itself must be carried out by a certified professional in accordance with the requirements of the law and the standard, and not as a DIY solution based on assumptions.

For anyone managing a hotel or guesthouse who is starting to look into the subject, the first step isn't to choose a station from Charging stations and accessories store in isolation, but to schedule an infrastructure check and a consultation that will examine the property's specific needs: the size of the parking facility, guest traffic and the project budget. That way you can reach a decision that suits the hotel itself, rather than a decision based on what suited another place.

Frequently asked questions

How many charging stations does a small hotel with twenty parking spaces need?
There's no fixed number that suits every hotel, because it depends on the percentage of guests arriving by private car and their average length of stay. It's recommended to start with an infrastructure check and a realistic demand estimate, not a sweeping assumption.

What's the difference between a charging station for a hotel and a station for a residential building?
In a residential building there are permanent residents with a recurring charging pattern. In a hotel there's high guest turnover, each with a different vehicle and a different length of stay, which requires load management and a payment processing system suited to a changing stream of users rather than a fixed group of users.

Is load management needed even in a small hotel with one or two stations?
If there are only one or two stations, load management between stations is less critical, but an infrastructure check is still important to make sure the existing electricity supports the power of the chosen station. As the number of stations grows, the need for load management grows accordingly.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 