Updated: November 2026
In short: Charging stations for fuel stations are usually DC fast charging stations of 180 to 400kW, which let a driver add significant range during a coffee stop. Proper planning starts with checking the electrical connection, continues with choosing the number of stations and their power, and requires a credit card payment terminal in every new fast charging station put into operation from 1.1.2027.
A fuel station is the most natural place for fast charging: it's located on a traffic route, it has parking, restrooms and retail, and drivers are already used to stopping there. But charging stations for fuel stations are not “just another pump”. They require a large electrical connection, planning for dwell times longer than refueling, a payment system that meets regulatory requirements, and ongoing operation that ensures the station is available when the driver arrives.
This guide is intended for fuel station owners, franchisees and operators considering setting up a charging hub. It deals with the planning decisions and the numbers, and complements the general guide on Setting up public charging stations.
You can compare DSGCharge's fast charging stations, with a choice of CCS1 or CCS2 connector, on the page DC fast chargers in the store.
Why set up charging stations at a fuel station?
A fuel station that adds fast charging stations keeps its customer base even as customers switch to electric cars. A driver who charges for 20 to 30 minutes stays on site much longer than a driver who refuels, and therefore has more time to shop at the convenience store or the coffee shop.
- Location on a route: Fast charging is needed mainly on intercity trips, exactly where fuel stations are already located.
- Existing amenities: Restrooms, retail, lighting and signage already exist on site, and there's no need to build them from scratch.
- Revenue from selling electricity: The station owner or operator sets the price per kWh (kilowatt-hour, the unit of energy the car consumes), subject to price disclosure obligations.
- Future readiness: The National Planning and Building Council is advancing updates to the National Outline Plan for fuel stations (TAMA 18) to make it easier to add charging stations. Details below.
How many charging stations and what power does a fuel station need?
At most fuel stations, it makes sense to start with 1 to 2 DC fast charging stations of 180 to 240kW, with infrastructure ready for expansion. At stations on main routes and at sites with heavy traffic, it's worth considering faster stations. Power is measured in kW (the charging rate), unlike kWh, which is the amount of energy going into the battery.
Two important points when choosing the power:
- Splitting between two connectors: In many DC stations, when two cars charge at the same time, the power is split between them. For example, a 180kW station supplies 180kW to one car, or 90kW to each car when two are connected.
- The car limits the rate: A car that accepts up to 100kW won't charge faster at a 240kW station. A powerful station mainly serves new cars, pickups and commercial vehicles with large batteries.
Which stations are suitable for a fuel station?
| Model | Power | Split across two connectors | Current (three-phase) | Suitable for | Store price |
|---|---|---|---|---|---|
| DSG-5240 | 40kW DC | — | — | Small station, top-up charging | ₪24,900 |
| DSG-5260 | 60kW DC | — | — | Urban station, limited budget | ₪34,990 |
| DSG-7420 | 120kW DC | 60kW per connector | 182A | Most fuel stations on routes | By quote |
| DSG-7480 | 180kW DC | 90kW per connector | 285A | Main routes, heavy traffic | By quote |
| DSG-7540 | 240kW DC | 120kW per connector | 364A | Central charging hub, commercial vehicles | By quote |
| DSG-7080 | 80kW DC with an advertising screen | 40kW per connector | 121A | Station with high advertising exposure | By quote |
| DSG-6052 | Dual AC 2x22kW | 22kW per connector | 64A | Employee parking or long stays | ₪6,990 |
Prices and specifications according to the DSGCharge store, as of November 2026. The DC stations are ordered with a choice of CCS1 or CCS2 connector, and all are managed via OCPP from a cloud system. Details are according to the order.
You can read more about choosing Ultra-fast charging station and about the return on investment in DC stations for businesses.
What electrical connection do charging stations at a fuel station need?
The electrical connection is usually the factor that determines how many stations can be set up and at what rate. Each 120kW DC station draws about 182A three-phase according to the manufacturer's specifications, so a hub of four such stations reaches the order of hundreds of kilowatts. In most cases this requires a connection upgrade with the Israel Electric Corporation (IEC), and sometimes a dedicated transformer and electrical room.
Before choosing models, it's worth checking:
- Existing connection size and how much spare power remains after the pumps, cooling, lighting and the shop.
- The possibility of upgrading the connection and its timeline with the IEC.
- Space for an electrical room or transformer on the lot, including safety distances.
- Load management: A system that divides the available power among the stations in real time, so more stations can be set up on the same connection without exceeding it.
DSGCharge's cost calculator helps you get an initial estimate of the infrastructure cost: Charging station installation cost calculator.
What is changing in TAMA 18 regarding charging stations at fuel stations?
TAMA 18 is the National Outline Plan for fuel stations, and it determines what may be built at a station. The National Planning and Building Council is advancing an update intended to make it easier to set up fast charging stations at existing and new stations.
According to reports on the update (2025 through November 2026), its main points are:
- An addition of up to 100 sq m for electrical infrastructure (electrical rooms, transformers, switchgear) at a station where at least five fast charging stations are permitted.
- Waiting areas for drivers during charging, standalone or as part of the station's retail space.
- Exemption from submitting a hydrological-environmental document for plans and permits that include electric charging stations only, including adding stations to an existing station.
According to the November 2026 report, the National Council approved forwarding the update to the government, and it still requires the government's approval. So before planning, it's worth checking with the local committee and a planning consultant what already applies to your station today.
What does regulation require of a fast charging station operator?
The Electricity Authority set rules for public charging station operators in decision 73006 (31.12.2025), which came into effect on 26.7.2026. A fuel station owner who operates fast charging stations needs to know three main obligations:
| Topic | What was decided | Date |
|---|---|---|
| Credit card payment terminal | At every fast and ultra-fast charging station: credit card payment without registration and without an app | New stations put into operation from 1.1.2027; all stations from 1.1.2028 |
| Price display | At fast charging stations: a clear, visible price near the station, and online publication as well | According to the timelines in the decision |
| Exempt from a license | An operator of stations in a public place with a cumulative capacity of up to 8MW is exempt from a supply license, subject to conditions and reporting | From 26.7.2026 |
Source: the Electricity Authority, decision 73006 and its appendices (gov.il), as of November 2026. Before setting up, it's worth checking the current wording.
The practical implication: a station put into operation at a fuel station in 2027 must include a credit card payment terminal from day one. DSGCharge's public DC stations support activation via RFID, the app and credit card.
How do you plan the site itself?
Planning a charging hub at a fuel station is different from planning a parking facility. The driver stays 20 to 40 minutes, needs convenient access to the cable and a space that doesn't block traffic to the pumps.
- Separation from the pumps: Positioning the parking spaces so that a charging car doesn't block the refueling lane.
- Cable length and access: Public DC stations usually have a 6-meter built-in cable. It's worth planning parking spaces that also suit pickups and commercial vehicles, whose charging ports are located in different places.
- Mechanical protection: Protective posts or stoppers in front of the station. See the guide toCharging station cabinet and parking accessories.
- Ingress protection: DSGCharge's DC stations have an IP55 ingress protection rating and are suitable for outdoor installation.
- Lighting and signage: Drivers need to identify the stations from the road and find the price easily.
- Dwell time: Shade, seating and access to the shop. This is where the station's additional profit lies.
How do you manage and operate charging stations at a fuel station?
A station that doesn't work damages the station's image. That's why remote management and fast maintenance are as important as the hardware. OCPP (Open Charge Point Protocol) is an open communication protocol that connects the station to a cloud-based management system, and makes it possible to see faults, change prices and generate reports remotely.
DSGCharge supplies Public charging station management system – a complete one: cloud management, a user app, payment terminals, license plate recognition (LPR) cameras, pricing, payment processing and reports. The system was developed by DSGCharge and can be customized and branded according to the customer's requirements, so the stations at the fuel station can operate under the fuel station chain's brand. More information about OCPP managed stations.
How much does it cost to set up charging stations at a fuel station?
The cost consists of hardware, electrical infrastructure (connection upgrade, cables, panels and sometimes a transformer), civil works, a management and payment system, and maintenance. In most projects the infrastructure is a significant part of the budget, so checking the existing connection is the first step. A detailed cost breakdown, including a sample budget, appears in the guide How much does it cost to set up a fast-charging station.
For site owners who don't want to invest themselves, DSGCharge also offers a partnership model: no financial investment on your part, with the revenue split determined by the location and subject to a feasibility check.
Who sets up and manages charging stations for fuel stations?
DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and it sets up and manages charging systems end to end: public AC and DC stations up to 480kW, a cloud-based operating system, and installation and service nationwide. Its products have Standards Institution of Israel (SII) approvals.
Beyond fuel stations, DSGCharge also sets up Charging stations for parking facilities, solutions forCharging stations for businesses and a charging service atHotels.
Frequently asked questions about charging stations for fuel stations
How many charging stations should you set up at a fuel station?
At most stations you start with 1 to 2 DC stations of 120 to 240kW and prepare infrastructure for expansion. The final number depends on the electrical connection, the space and the traffic at the station.
Is a credit card payment terminal mandatory at a charging station at a fuel station?
Yes, at fast and ultra-fast charging stations. According to Electricity Authority decision 73006, new stations put into operation from 1.1.2027 must have a credit card payment terminal, and all fast charging stations from 1.1.2028.
How long does it take a car to charge at a 120kW station?
It depends on the car and the battery. A car that accepts high power can add a significant amount of range within 20 to 30 minutes. When two cars charge at the same time, each one gets 60kW.
Do you need a license to operate charging stations at a fuel station?
An operator of stations in a public place with a cumulative capacity of up to 8MW is exempt from a supply license, subject to the conditions set by the Electricity Authority. Above that, a license is required.
Can you set up stations without investing?
Yes, with DSGCharge's partnership model: no financial investment on the site owner's part, with the revenue split determined by the location and subject to a feasibility check.
Planning charging stations at your fuel station? The DSGCharge team will check the electrical connection, recommend the right number of stations and power, and prepare a quote for the hardware, installation and operation. leave your details or call 077-9920350.