In short: In most cases, charging stations for a commercial fleet are 22kW AC stations with load management that charge the vehicles overnight in the parking lot. A 20-60kW DC station is suitable when vehicles return between shifts and need to add dozens of kWh within an hour. In most logistics centers, the right mix is lots of AC and a little DC.
Updated: November 2026
When a fleet of delivery vehicles, pickups or vans switches to electric, the first question isn't which vehicle to buy but how it will be charged. Unplanned charging ends in a line at a single station at six in the morning, or in an expensive connection increase that wasn't necessary. This guide explains how fleet managers and logistics centers plan charging stations for a commercial fleet: how many stations, what power, and how to keep the bill under control.
How do you calculate how much charging the fleet needs each day?
Start with the energy, not the stations. Multiply each vehicle's daily driving by its consumption (kWh per 100 km, based on manufacturer data or fleet data), and you get how many kWh each vehicle needs to add before its next departure.
A kWh is an amount of energy, and a kilowatt (kW) is the charging rate. For example, suppose a vehicle drives 150 km a day and consumes 25 kWh per 100 km: it needs about 37.5 kWh every night. A fleet of 20 such vehicles needs about 750 kWh a day. This is only a sample calculation; the real numbers come from the fleet's driving data.
AC charging overnight or DC charging between shifts?
The decision depends on how long the vehicle stands in the parking lot. A vehicle that returns in the evening and leaves in the morning stands for 10-12 hours, which is enough for a full AC charge. A vehicle that works two shifts stands for an hour or less, and only a DC station will give it enough energy in that time.
| Scenario | Time parked | Recommended solution | Estimated energy charged |
|---|---|---|---|
| Deliveries in one shift, return in the evening | 10-12 hours | A 22kW AC station for each vehicle, with load management | Well beyond the daily need, depending on the vehicle's onboard charger |
| Two shifts, driver change in the parking lot | 30-60 minutes | A 40-60kW DC station for several vehicles | about 20-60 kWh, depending on the power and the vehicle |
| Service vehicles that return at midday | 1–3 hours | 22kW AC or 20kW DC | about 20-60 kWh |
| Vehicle taken home overnight | Overnight at the employee's home | A station at the employee's home with metering for expense reimbursement | Depends on the home station |
Estimate only, as of November 2026: energy = power times time. Actual power is also limited by the vehicle's onboard charger, and in DC charging the rate drops as the battery fills up.
The differences between AC and DC are explained in detail in the guide DC fast charging station vs. AC.
How many charging stations does a commercial fleet need?
For overnight charging, the simple rule is one station for each vehicle that parks in a fixed spot, or one dual station for every two vehicles. That way no driver has to move a vehicle in the middle of the night, and the system divides the power on its own. DC stations are added according to the number of vehicles working double shifts, not according to the size of the fleet.
In a fleet of 20 vehicles working one shift, that could be 10 dual AC stations. If five of them also work an evening shift, you add one or two DC stations for fast charging at the shift change.
How do you connect many stations without increasing the electrical connection?
With load management. This is a system that divides the available power among the stations charging at that moment, so that total consumption doesn't exceed the connection size. At night there is usually plenty of spare power in the warehouse or factory, and that's exactly when the fleet charges.
In the example of 750 kWh over a 10-hour night, the average power is about 75kW, much less than 20 stations of 22kW running at full power (440kW). With load management, each vehicle gets what it needs by morning, and the connection isn't overloaded. How this works in practice is explained in the guide Load management for charging stations.
How does a TOU tariff affect the fleet's charging costs?
TOU is a tariff based on the time of day: the price per kWh at peak hours is much higher than at off-peak hours. Peak hours apply only on Sunday–Thursday, and on weekends the tariff is off-peak in all seasons. A fleet that charges at night and on weekends is almost always in off-peak hours.
A managed station lets you schedule charging for the cheaper hours and get a consumption report for each vehicle. Details on TOU eligibility for businesses are in the guide How much does it cost to set up a fast-charging station, and an example calculation based on a TOU meter is in the guide Monthly charging report.
Which commercial fleet charging stations are suitable for a logistics center?
Stations managed via OCPP are suitable for a commercial fleet, so that every charging session is assigned to a vehicle and a driver. OCPP is an open communication protocol between the charging station and a cloud management system, enabling permissions, scheduling, reports and remote control. All DSGCharge public stations are managed via OCPP, and the DC stations are ordered with a CCS1 or CCS2 connector according to the vehicles in the fleet.
| Model | Type and power rating | Fleet use | Price |
|---|---|---|---|
| Managed charging station 22kW DSG-6012 | AC, 22kW | A fixed parking space for each vehicle, overnight charging | ₪3,290 |
| Public dual charging station 22kW DSG-6052 | AC, 2x22kW | Two vehicles per station | ₪6,990 |
| Public dual charging station 22kW, floor-standing DSG-6112 | AC, 2x22kW, floor-standing | Open parking lot with no nearby wall | ₪7,990 |
| Public DC fast charging station 20kW DSG-5220 | DC, 20kW | Top-up charging at midday | ₪15,900 |
| Public DC fast charging station 40kW DSG-5240 | DC, 40kW | Shift change | ₪24,900 |
| Public DC fast charging station 60kW DSG-5260 | DC, 60kW | Double shifts and vehicles with a large battery | ₪34,990 |
Store prices are correct as of November 2026, for the station only and without installation. All DC stations in the category DC fast chargers.
Do stations in the fleet's parking lot require a credit card payment terminal?
As a rule, no. Electricity Authority Decision 73006 (31.12.2025, in effect from 26.7.2026) exempts a dedicated charging station, meaning a station that is not open to the public and is intended mainly for employees on site, as well as stations on private premises. The credit card terminal requirement for fast charging stations applies to stations open to the public.
If you want to open some of the stations to customers or the public as well, the rules change. Details in the guide Credit card payment terminal for a charging station.
How do you manage the charging of each vehicle and driver?
In a commercial fleet, it's not enough to know how much electricity was consumed; you need to know which vehicle charged, when and how much. The DSGCharge fleet platform does this with activation by a license plate recognition camera, real-time vehicle data (location, battery, range and speed) and charging metering at the employee's home for expense reimbursement.
Full details on the page EV fleet management, and about camera activation in the guide License plate recognition at a charging station. The stations themselves are managed from the cloud like all OCPP managed stations.
What mistakes should you avoid when planning fleet charging?
Most problems in fleet charging don't come from the stations themselves but from partial planning at the first stage. Four recurring mistakes:
- Buying DC for everyone: DC stations are more expensive and require a large connection. If the vehicles stand all night, AC stations with load management do the same job at a much lower cost.
- Connecting stations to an existing panel: According to the Electricity Administration guidelines, each station needs a dedicated circuit. A makeshift connection fails the inspecting electrician's inspection.
- Planning only for today's vehicles: Fleets grow. Infrastructure that allows stations to be added gradually saves digging and cabling twice.
- Skipping management: Without assigning charging to vehicles, you can't know what each vehicle costs or identify a vehicle that wasn't charged before a shift.
What is the process for setting up charging for a commercial fleet?
- Fleet data: How many vehicles, daily driving, hours parked and shifts.
- Electrical check: Connection size, spare power at night and room for a charging panel.
- Planning: How many AC stations, whether DC is needed, where each station goes and how to protect it from vehicle impact.
- Installation and testing: According to the Electricity Administration guidelines, including an inspecting electrician's check before commissioning.
- Connection to management: Permissions for vehicles and drivers, scheduling for off-peak hours and reports.
- Service: Fault monitoring and ongoing maintenance.
Read about the requirements for the installation itself in the guide Charging station installation guidelines, and about general planning for a business in the guide Charging stations for businesses.
Who installs and manages charging stations for vehicle fleets in Israel?
DSGCharge is one of Israel's leading companies in EV charging solutions and has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. About 20,000 chargers and charging stations have been sold and installed, and its installation and service teams work nationwide.
For vehicle fleets, DSGCharge provides the entire chain: AC and DC stations, installation, load management, a cloud management system developed by the company, a fleet platform and service. That way the fleet manager works with one provider, from planning to the monthly report.
Want a tailored quote?
Send us the number of vehicles, working hours and the size of the electrical connection, and we'll get back to you with an initial plan. You can start with theCharging station installation cost calculator, leave their details or call 077-9920350.
Frequently asked questions
Does a commercial fleet need DC stations?
Not always. A vehicle that stands in the parking lot all night charges well on a 22kW AC station. A 20-60kW DC station is needed mainly when vehicles work two shifts and stand for less than an hour between trips.
How many AC stations are needed per vehicle?
For overnight charging, the rule is one charging point for each vehicle that parks in a fixed spot: a single station per vehicle or a dual station for every two vehicles, with load management dividing the power.
Can you charge 20 vehicles without increasing the electrical connection?
Often, yes. Load management divides the spare power at night among the vehicles, so total consumption stays within the connection's limits. The exact estimate is made after checking the connection and the panel.
Do stations in the fleet's parking lot require a credit card payment terminal?
According to Electricity Authority Decision 73006, a dedicated station that is not open to the public and is intended mainly for employees is exempt, as is a station on private premises. The terminal requirement applies to fast charging stations open to the public.
How do you know how much each vehicle charged?
A station managed via OCPP assigns each charging session to a vehicle or driver, and the DSGCharge fleet platform adds activation by a license plate recognition camera, real-time vehicle data and charging metering at the employee's home.