Charging stations for local authorities: tenders, locations and business models (2026)

How a local authority sets up public charging stations: four models (purchase, operator, concession and permit), what to write in the tender, choosing locations, permits, Electricity Authority rules 73006 and Ministry of Energy support.

Updated: November 2026

In short: A local authority can set up public charging stations in three main ways: buy and operate them itself, buy them and hand over operation to an operator, or grant an operator the right to use the space in exchange for a revenue split. The engagement is usually subject to tender laws, and from 26.7.2026 the operator must comply with the Electricity Authority rules (Decision 73006).

Charging stations for local authorities have become part of urban planning. The number of electric vehicles in Israel keeps growing, and many residents, especially in high-density housing, have no private parking space where a station can be installed. For the local authority, this is both a service obligation and an opportunity: charging stations in municipal parking facilities, near public institutions and on commercial streets can create a new revenue stream from the parking resource. This guide is intended for city engineers, transportation managers and procurement staff at local authorities, and it explains which models exist, what's worth writing in the tender, how to choose locations and which rules apply to the operator. For the full picture of setup and management, see our page on Setting up public charging stations.

The models and prices of Public charging stations can be found in our store.

Why do charging stations for local authorities matter now?

A resident living in a building without private parking needs a regular, available place to charge. When there are no stations near home, the switch to an electric vehicle is postponed, or the resident depends on distant stations. According to the Knesset Research and Information Center (June 2025), as of April 2025 there were about 8,100 public charging stations operating in Israel: about 1,900 fast (DC) and about 6,200 slow (AC).

Beyond serving residents, charging stations are a planning tool: they let the local authority decide where residents and vehicles will park for long periods, reduce local air pollution and increase the use of existing municipal parking facilities.

Which models are available to a local authority?

No single model suits every local authority. The choice depends on the budget, the authority's operational capacity and how much risk it is willing to take. The table summarizes the four common models:

Model Who invests Who operates Revenue to the authority Suitable for…
Purchase and self-operation The Authority The local authority or a municipal corporation All the revenue, and all the risk too A local authority with a parking corporation and operational capacity
Purchase + service operator The Authority A paid external operator The revenue minus the operating fee A local authority that received government support for the purchase
Concession / partnership The operator The operator Revenue split or space usage fees A local authority that doesn't want to invest from its budget
Permit to use the space The operator The operator Fixed permit fees Individual locations, pilot

In the concession or partnership model, the local authority allocates the space and the connection, and the operator builds, manages and maintains. With DSGCharge, this means no financial investment on the authority's part; the revenue split is determined by the location and subject to a feasibility check.

Does a local authority have to issue a tender?

As a rule, an engagement by a municipality or council is subject to the tender laws that apply to local authorities (including the Municipalities Ordinance and the Municipalities (Tenders) Regulations, 5748-1987), as is the allocation of public space for commercial activity. Many local authorities have already published tenders for setting up and operating charging stations. The exact engagement track (public tender, small tender, exemption or engagement through a municipal corporation) is determined by the authority's legal counsel.

What should you write in the tender documents?

Good tender documents protect residents and the local authority for years. The preparedness guide for local authorities by the Samuel Neaman Institute, funded by the Ministry of Energy (2020), recommends, among other things, these clauses:

  • Service level (SLA): quantitative availability metrics, a support center and repair teams available 24/7.
  • Open protocol: stations managed via OCPP (an open communication protocol between the station and the management system), so the local authority isn't dependent on a single supplier. A detailed explanation is on the page about OCPP managed stations.
  • User identification: avoid identification methods that work with only one operator.
  • Data: authority access to usage data, and publishing location, power, availability and tariff to the public.
  • Tariffs: a structure that allows a reasonable return on investment for the operator. The guide recommends avoiding free charging in most cases.
  • Information security and privacy: cyber protection for the system and protection of user details.
  • Smart charging: load management, so that stations can be added without upgrading the connection each time.
  • Regulatory compliance: the operator's commitment to comply with the Electricity Authority rules (details below).

How do you choose locations for charging stations in a local authority?

The location determines how much the station will be used, and therefore its profitability. In a dense city, it's worth starting with residential neighborhoods without private parking, and with hubs where people park for an hour or more. In a rural community, a few stations at the community center, the commercial center and tourist sites are enough. As of November 2026:

Location type Typical parking time Recommended station type
Residential street / neighborhood parking facility A full night AC 22kW (dual)
Municipal parking facility in the city center 1-4 hours AC 22kW + one DC station
Community, sports and culture center 1–3 hours AC 22kW
Industrial and employment zone Workday Managed AC 22kW
City entrance / main road 15-40 minutes DC 60-240kW

It's recommended to prepare a location map for the entire area of the local authority in advance, mark dedicated parking spaces, and set up enforcement against vehicles that block a station without charging. For high-traffic locations, it's also worth considering a Charging station with an advertising screen, which adds revenue to the station.

Do you need a building permit for a charging station on the street or in a parking facility?

According to the Samuel Neaman Institute preparedness guide (2020), charging stations are defined as “road facilities”, so installing them within a road area by a local authority or a corporation it owns does not require a building permit. A station in a private parking facility doesn't require a permit either. However, the infrastructure works (excavation, laying cables, an electrical cabinet) usually require an excavation permit and coordination with the engineering department, and marking parking spaces and traffic signs may require approval from the traffic sign committee. The rules change, so it's worth checking with the local planning committee before each project.

The installation itself must comply with the Electricity Administration's “Guidelines for Installing an Electric Vehicle Charging System”. At a public AC station the connector is Type 2, and at a DC station the connector is CCS (or CHAdeMO).

Which Electricity Authority rules apply to the station operator?

Electricity Authority Decision 73006 of 31.12.2025 regulates the activity of public charging station operators, and it came into force on 26.7.2026. A local authority choosing an operator must make sure the operator complies with it. The main points of the decision:

Topic What was decided Date
License Operators are exempt from a license up to 8 megawatts cumulative; above that a license is required 26.7.2026
Price display Slow station: online or next to the station. Fast station: next to the station 26.7.2026 / 1.1.2028
Payment without registration Slow station: for example, a QR code or phone. Fast station: credit card payment terminal 26.7.2026
Credit card payment terminal New stations put into operation from 1.1.2027; all fast stations from 1.1.2028 1.1.2027 / 1.1.2028
Station hogging Charging for parking without charging is allowed if the customer knows about it in advance 26.7.2026

Is there government support for local authorities?

The Ministry of Energy subsidizes setting up charging stations through calls for proposals and tenders. According to the Knesset Research and Information Center (June 2025), in 2019-2024 about ₪21.4 million was approved for this purpose and about ₪14.8 million was actually spent, and about ₪8.7 million was allocated in the 2025 budget. In one round (reported by ynet in July 2022), 37 local authorities won support of about 70% of the setup cost of 1,122 AC stations for residents without private parking, in public parking facilities and on streets. It's worth following open calls for proposals on the Ministry of Energy website and preparing a location map in advance, so you can apply quickly.

Which stations suit a local authority?

All DSGCharge public stations are managed via OCPP from a cloud system, and DC stations are ordered with a CCS1 or CCS2 connector, your choice. Prices from the store, as of November 2026:

Model Type Suitable use in a local authority Price
DSG-6052 Dual AC 2x22kW Municipal and neighborhood parking facilities ₪6,990
DSG-6112 Dual floor-standing AC 22kW Streets and open parking lots ₪7,990
DSG-6012 Managed AC 22kW Employee parking facilities and public buildings ₪3,290
DSG-5240 DC 40kW Commercial centers and small parking facilities ₪24,900
DSG-5260 DC 60kW Central parking facility, city entrance ₪34,990
DSG-7420 / DSG-7480 / DSG-7540 DC 120 / 180 / 240kW Main roads and charging hubs By quote

For city entrance locations, it's also worth reading the guide toUltra-fast charging station, and the cost breakdown in theHow much does it cost to set up a fast-charging station. For a comparison between the dual stations, see Public dual charging station 22kW. You can estimate the installation cost for each location with theinstallation cost calculator.

What does DSGCharge provide to local authorities?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, with about 20,000 chargers and charging stations sold and installed, and installation and service teams nationwide.

For local authorities, DSGCharge provides an end-to-end project: location survey, electrical design, supply of AC and DC stations, installation, maintenance, and also Public charging station management system: cloud management, a resident app, payment terminals, license plate recognition cameras and reports for the authority. The system was developed in-house by DSGCharge and can be customized and branded to the customer's requirements, so the stations can appear under the municipality's name. You can work under a purchase model or a partnership model, as also described in the guide Charging stations for parking facilities.

Frequently asked questions

Can a local authority set up charging stations without investing from its budget?

Yes. In a concession or partnership model, the operator invests in the stations and infrastructure, and the local authority allocates space. With DSGCharge there is no financial investment on the authority's part; the revenue split is determined by the location and subject to a feasibility check.

Does a charging station on the street need a building permit?

According to the Samuel Neaman Institute guide (2020), a charging station is a “road facility”, and installing it within a road area by a local authority does not require a building permit. The excavation and electrical works still require permits and coordination, so it's worth checking with the local planning committee.

Which rules apply to public station operators from 2026?

Electricity Authority Decision 73006 came into force on 26.7.2026: price display, an option to pay without registration, and a license exemption up to 8 megawatts. A credit card payment terminal is required at new fast charging stations from 1.1.2027 and at all fast charging stations from 1.1.2028.

Which station suits a municipal parking facility?

In a parking facility where vehicles park for several hours or a whole night, a dual AC 22kW station such as the DSG-6052 (₪6,990, as of November 2026) gives the lowest cost per charging point. In a central parking facility, it's worth adding one DC station for fast charging.

Does the Ministry of Energy support local authorities that set up charging stations?

Yes, through calls for proposals and tenders. In a round reported in 2022, 37 local authorities won support of about 70% of the setup cost. About ₪8.7 million was allocated in the 2025 budget to support charging stations (Knesset Research and Information Center).

Want to plan charging stations in your local authority?

The DSGCharge team will build a location map with you, propose a business model and prepare a technical specification for the tender. leave your details or call 077-9920350.

Sources: Electricity Authority Decision 73006 (31.12.2025); Knesset Research and Information Center, analysis of the Ministry of Energy budget (June 2025); Samuel Neaman Institute, Preparedness Guide for Private Electric Transportation for Local Authorities, second edition (2020, funded by the Ministry of Energy); ynet, “The Ministry of Energy will subsidize the setup of additional public charging stations” (31.7.2022). All information as of November 2026.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar