A charging station with an advertising screen combines two revenue sources in one installation: selling electricity to drivers, and digital advertising space located exactly where people stand and wait. This guide explains who a charging station with an advertising screen is right for, how to calculate whether it pays off, what electrical connection it needs, which permits are required for the sign, and what the difference is between the models.
In short: A charging station with an advertising screen is a public DC fast charging station (60 or 480kW) with a built-in advertising screen. It suits parking facilities, fuel stations, shopping malls and commercial centers with heavy traffic. An advertising screen visible from an intercity road requires a permit under the Roads (Signage) Law.
Updated: November 2026
What is a charging station with an advertising screen?
A charging station with an advertising screen is a public charging station with a large screen integrated into its body for displaying ads, videos and branding content. In addition to the advertising screen, it has an operational display that shows the driver the charging time, charging power, total energy charged and the amount billed.
The DSGCharge catalog has two such models, and both are DC fast charging stations. DC (direct current) means the station converts the electricity itself and feeds it directly into the battery, which makes it much faster than a regular AC station. The driver stands next to the station for 20 to 60 minutes, and during that time the screen is right in front of them.
Why combine an advertising screen with a charging station?
A regular public station earns only from the electricity it sells. A charging station with an advertising screen adds a second revenue source that doesn't depend on the number of kWh (kilowatt-hours, the unit of energy charged into the vehicle) sold that day. Anyone passing by the screen sees the ads even when the station isn't in use.
The main advantages for the location owner:
- Additional revenue from the same installation: selling screen time to advertisers, to tenants in the complex or to nearby businesses.
- A captive audience: a driver waiting for a fast charge stays next to the station for several tens of minutes, rather than passing the screen in a second.
- Self-promotion: a shopping mall, hotel or fuel station can display its own promotions without paying an outside party.
- Visibility: a station with a screen stands out from a distance, which helps drivers find it in the complex.
Keep in mind: before planning advertising revenue, you need to check that the location allows a sign in terms of permits, and that it has enough foot traffic. Both topics are covered below.
Who is a charging station with an advertising screen right for?
A charging station with an advertising screen suits a place that has both demand for fast charging and foot traffic of people who see the screen. It is less suitable for a closed employee parking facility or a residential building, where the same people see the screen every day.
| Location type | Typical dwell time | Suitability for a station with a screen | Note |
|---|---|---|---|
| Fuel station / roadside complex | 15-60 minutes | High | Many different drivers; check the signage permit if the screen is visible from an intercity road |
| Shopping mall / commercial center | 30 minutes to two hours | High | You can advertise the tenants in the complex; it's worth adding AC stations for long stays |
| Public parking facility in the city | An hour or more | Medium-high | Suitable at the parking entrance or on a level with pedestrian traffic |
| Hotel / attraction | hours | Medium | The screen is used mainly for self-promotion; AC stations are better suited for overnight guests |
| Employee parking / residential building | hours | Low | Same audience every day; a managed AC station is preferable |
Illustrative table, based on general parking-duration patterns. As of November 2026.
If most vehicles at the location park for several hours, managed AC stations are usually preferable, such as the dual station DSG-6052. You can combine the two: one DC station with a screen at the entrance, and AC stations in the rest of the parking facility. More on the models in theparking facility charging station guide.
How do you calculate whether a charging station with an advertising screen pays off?
Profitability depends on two separate revenue sources, so it's worth calculating each one separately. There is no “fixed number” that fits every location, and every forecast should be based on traffic data from the location itself.
Charging revenue = number of charging sessions per day × average kWh per session × (price per kWh to the driver minus the electricity cost to the station owner).
Advertising revenue = number of advertising slots sold × price per slot, or an annual contract with a single advertiser. Even if the screen is used only for self-promotion, it has value: it's advertising you don't need to buy elsewhere.
Costs = the station itself, the electrical infrastructure and installation, the annual signage fee to the local authority (if required), maintenance, communication and the management system.
The electricity cost to the station owner is determined by the tariff and the connection structure. For a fast charging station that consumes a lot of electricity, it's worth checking with the Israel Electric Corporation (IEC) whether the TOU (time-of-use) tariff pays off, because the hours and seasons have a major effect on cost. A full breakdown of setup costs is in theDC fast charging station guide for businesses, and you can estimate the installation cost with theCharging station installation cost calculator.
What is the difference between the DSG-7060 and the DSG-7080?
The two models have identical features, and the main difference is the power and the electrical connection they need. Data from the product pages in the store, as of November 2026:
| Figure | DSG-7060 | DSG-7080 |
|---|---|---|
| Maximum power | 60kW | 80kW |
| Two connectors at once | 30kW per connector | 40kW per connector |
| Electrical connection | Three-phase, 91A | Three-phase, 134A |
| Activation and payment | RFID, app, credit card | |
| Communication | OCPP 1.6, 4G cellular | |
| Built-in cable / ingress protection | 6 meters / IP55 | |
| Warranty | 24 months, extendable for a fee | |
| Price | By quote, special order | |
The practical meaning: the DSG-7060 is easier to install where the electrical connection is limited. The DSG-7080 delivers faster charging but requires a larger connection. On both models, when two vehicles charge at once, the power is split between them. Like all DSGCharge DC stations, they can be ordered with a CCS1 or CCS2 connector, your choice (CCS2 is the European standard common in Israel; CCS1 is common in pickups and American vehicles).
If you don't need an advertising screen, a regular public DC station such as the DSG-5260 (60kW) sells in the store for ₪34,990.
What electrical connection does a station with an advertising screen need?
A 60kW DC station needs a three-phase connection of about 91 amps per phase, and an 80kW station needs about 134 amps per phase, according to the product pages. That's much more than a home or small business connection, so the first step is to check the existing electrical connection at the complex.
If the connection isn't sufficient, there are two options: upgrade the connection with the IEC, or choose a lower-power model and use load management. Load management is a system that distributes the available power between the stations and the other consumers in the complex, so that the main connection doesn't exceed its limit. Cable length, distance from the panel and mechanical protection for the station also affect the cost. You can read about physical protection for a station in a parking facility in thecharging station cabinet and parking accessories guide.
Do you need a permit for an advertising sign on a charging station?
In most cases, yes. An advertising screen is a sign in every respect, and the permit depends on the location. There are two main tracks, and it's worth checking both before ordering:
| Status | What applies | Who approves |
|---|---|---|
| The screen is visible to drivers on an intercity road (for example, a fuel station on a highway) | The Roads (Signage) Law, 5726-1966: it is prohibited to install a sign visible from an intercity road without a permit. A permit is granted only for certain types of signs, including a sign for a business installed on the business premises | Within a local authority's jurisdiction: the local authority with the approval of the district committee. Outside a local authority's jurisdiction: the district committee |
| A screen inside the city, in a parking facility or in a commercial complex | The local authority's signage bylaw: a sign license and a signage fee according to its rates (for example, in Tel Aviv-Jaffa: the Tel Aviv-Jaffa (Signage) Bylaw, 5753-1992) | The local authority's signage department |
Sources: the Roads (Signage) Law, 5726-1966, sections 2, 3 and 5 (text on gov.il); the Tel Aviv-Jaffa Municipality “Payments and signage rates” page. As of November 2026. Conditions vary between local authorities, and you should check with the relevant authority.
Note: under the Roads (Signage) Law, a permit for a sign visible from an intercity road is granted for a sign advertising a business on that business's premises. A screen showing ads from outside advertisers that is visible from such a road may not meet the permit conditions. That's why, at stations on intercity roads, it's worth checking in advance what may be displayed, or positioning the screen so that it faces the complex rather than the road.
What do the Electricity Authority regulations say about fast charging stations?
A charging station with an advertising screen is a fast charging station, so the Electricity Authority rules for fast charging stations apply to it. According to Electricity Authority Decision 73006 (31.12.2025):
- Price display: at fast charging stations, the price must be displayed near the station, clearly and visibly.
- Payment without registration: fast charging stations must offer payment via a credit card payment terminal without registration. For new stations put into operation from 1.1.2027, the obligation applies from the day of operation, and for other fast charging stations from 1.1.2028 (according to the explanatory notes to the decision).
- Stopping the charge at any time, and serving every customer without priority for regular customers, other than the charging price.
The DSG-7060 and DSG-7080 support credit card activation, and their operational display shows the driver the amount billed. It's worth finalizing the compliance details for each section of the decision with DSGCharge at the planning stage, according to the complex's type of operation.
How do you manage a public station with an advertising screen?
The DSG-7060 and DSG-7080, like all DSGCharge public stations, are managed with the OCPP protocol from a cloud system. OCPP is an open language in which the charging station communicates with the management system: activation, permissions, pricing, billing and fault reporting. You can read about what this means for the customer in the guide OCPP managed stations.
For location owners and operators, DSGCharge provides Public charging station management system developed by the company: cloud management, a user app, payment terminals, license plate recognition cameras, pricing, payment processing and reports. The system can be customized and branded to the customer's requirements (White Label), so the station and the app can carry the complex's brand.
How do you set up a charging station with an advertising screen, step by step?
- Location check: vehicle and pedestrian traffic, dwell time, screen visibility and where it can be seen from.
- Electrical check: Existing connection size, distance from the panel, need for a connection upgrade or load management.
- Signage check: contact the local authority about a sign license and fee, and check the Roads (Signage) Law if the screen is visible from an intercity road.
- Choosing a model and connector: DSG-7060 or DSG-7080, CCS1 or CCS2, and the operating model (independent or partnership).
- Ordering, installation and activation: fast charging stations are not kept in stock and are ordered according to the customer's needs; after installation, the station is connected to the management system and pricing is configured.
- Operation and advertising: fault monitoring, maintenance and selling screen time to advertisers.
A full guide to the entire process is on the page Setting up public charging stations.
Who sells and installs charging stations with an advertising screen in Israel?
DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, with about 20,000 chargers and charging stations sold and installed. It sells and installs public AC and DC stations, including stations with an advertising screen and DC stations up to 480kW to order, with installation and service teams nationwide. Its products have Standards Institution of Israel (SII) approvals.
Beyond the product, DSGCharge builds and manages end-to-end charging systems: towers and managed buildings, public stations for parking facilities and businesses, vehicle fleets, and an operating system for public stations. Location owners also have a partnership model: no financial investment on your part; the revenue split is determined by the location and subject to a feasibility check.
Which mistakes should you avoid?
- Ordering before checking signage: a screen that doesn't get a license, or that may not display outside ads, wipes out a large part of the profitability.
- Placing the screen in a dead corner: a screen seen only by the charging driver loses most of its advertising value.
- Ignoring the connection size: an 80kW station on a small connection will run at limited power.
- Building a forecast on advertising alone: charging revenue is the foundation; advertising is an add-on.
- Forgetting the payment requirements: a fast charging station needs credit card payment without registration, according to the Electricity Authority's timelines.
Want to check whether a charging station with an advertising screen suits your complex? leave your details and a DSGCharge representative will get back to you for a location, electrical and signage check. You can also estimate the cost with thecalculator or browse ourcharging stations and accessories . Phone: 077-9920350.
Frequently asked questions about charging stations with an advertising screen
How much does a charging station with an advertising screen cost?
The DSG-7060 (60kW) and DSG-7080 (80kW) are sold by quote and by special order, because the specification is tailored to each project. The station cost is joined by electrical infrastructure, installation and a signage fee if required.
Do you need a sign license for an advertising screen on a charging station?
In most local authorities, yes: a sign license and fee under the local bylaw. A screen visible from an intercity road is also subject to the Roads (Signage) Law, 5726-1966, and requires a permit from the local authority with the approval of the district committee.
What electrical connection does a charging station with an advertising screen need?
According to the product pages, the DSG-7060 needs a 91 amp three-phase connection, and the DSG-7080 a 134 amp connection. If the connection is smaller, you can upgrade it or use load management.
Can two vehicles charge at the same time?
Yes. Both stations can charge two vehicles at once, and the power is split: 30kW per connector on the DSG-7060 and 40kW per connector on the DSG-7080.
How do you pay at the station?
The stations are activated by RFID card, app or credit card, and are managed via OCPP from the cloud. Under Electricity Authority Decision 73006, fast charging stations must allow credit card payment without registration, at new stations from 1.1.2027.
Can you set up a station like this without investment?
With the DSGCharge partnership model for location owners: no financial investment on your part; the revenue split is determined by the location and subject to a feasibility check.