A separate electricity meter for a charging station: when you need one, how to connect it and what it costs

A separate electricity meter for an EV charging station is a basic condition for reliable, safe and efficient home charging. In this article, we look at what a separate electricity meter is, its technical and safety benefits, DSGCharge's advanced solutions, and how to choose the right station for your home.

A separate electricity meter for a charging station: when you need one, how to connect it and what it costs

Updated: November 2026

In short: A home charging station doesn't require a separate electricity meter. In most homes, it is supplied from the electrical panel on a dedicated circuit, and the consumption goes on the regular bill. In an apartment building, it is usually connected by splitting from the apartment's Israel Electric Corporation (IEC) meter (DSG-9907, ₪2,790), or through a managed system that measures and bills each resident (₪35 per month + 20 agorot per kWh). As of November 2026.

“Separate meter” is one of the most confusing terms when planning EV charging station installation. Sometimes it means a new connection from the IEC, sometimes splitting from the existing meter, and sometimes just measuring consumption inside the station. In this guide, we'll separate the options, explain when each one fits and show prices from the store.

DSGCharge is one of Israel's leading companies in EV charging solutions: managed charging systems for buildings, public charging networks and parking facilities, fleet management, stations and accessories, and installations. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and installation and service are provided nationwide.

What is the difference between a separate meter, splitting from the meter and a dedicated circuit?

The three terms describe different things. A dedicated circuit is an electrical line from the electrical panel that supplies only the station, and every fixed station is installed this way. Splitting from the meter means a small panel next to the IEC meter, from which a line runs to the station. A separate meter is a new connection from the IEC with its own bill.

  • Dedicated circuit: a separate line in the home panel with suitable protections. This is the basis of every installation, and the protection details appear in theCharging station installation guidelines.
  • Splitting from the IEC meter: suitable when the apartment's meter is in a meter room or lobby, far from the apartment panel, and the station's consumption needs to go on the apartment's bill.
  • A separate meter or connection: a new connection with the IEC. Usually not needed for a single home charging station, and considered mainly for businesses and parking facilities.
  • Measurement in the station (sub-meter): a managed charging station measures the kWh of each charging session. This makes it possible to bill by consumption even without an IEC meter for each parking space.

Is a separate electricity meter mandatory for a home charging station?

No. In a private home, the station is usually connected to the home's electrical panel on a dedicated circuit, and the consumption goes on the regular electricity bill. What you do need to check is the connection size: single-phase or three-phase, and how many amps.

A 22kW station requires a three-phase connection of 32A per phase, and a 7.4kW station also works on a single-phase connection. If the connection is small, there are two options: increase the connection or limit the station's power with load management. A full comparison: Single-phase or three-phase for a charging station andIncreasing the connection or a load management system.

How do you connect a charging station to the electricity meter in an apartment building?

In an apartment building, the apartment's meter is usually in the meter room, and the parking space is in the parking garage. The common method is splitting from the apartment's IEC meter: a split panel is installed next to the meter, and a dedicated line is run from it to the parking space. This way, the station's consumption goes on the apartment's bill, without charging the building committee.

The DSG-9907 splitting service includes the payment to the IEC for the disconnection, setting up the split panel, approval by an electrical inspector and reconnection. The timeline is set by the IEC. When several residents want stations, it is more cost-effective to plan one system for the whole building: Managed charging stations in apartment buildings.

What are the options, and how much do they cost?

The table summarizes the four ways to supply a charging station and measure its consumption. Prices from the DSGCharge store, as of November 2026.

Option When it fits What's included Price (as of November 2026)
Supply from the home panel on a dedicated circuit Private home, panel close to the parking space Dedicated line, protections, station installation DSG-9903 Up to 20 m: ₪2,590 · DSG-9904 Up to 30 m: ₪2,990
Separate connection from the IEC meter Apartment building, meter far from the apartment panel Split panel next to the meter, payment to the IEC, electrical inspector DSG-9907: ₪2,790 (in addition to station installation)
Managed system for the building Several residents, shared connection Load management, measurement per resident, billing and transfer to the building committee DSG-6012: ₪3,290 + service fee of ₪35 per month + 20 agorot per kWh
A new, separate connection from the IEC Business, parking facility, many stations Planning, coordination with the IEC By quote

To estimate the cost based on the distance and infrastructure at your site: Charging station installation cost calculator.

How do you bill each resident for charging without a separate meter for each parking space?

In a managed system, each station measures the kWh of each charging session and reports to the cloud using the OCPP protocol (an open communication language between a station and a management system). DSGCharge reads the TOU meter, bills each resident according to their consumption and transfers the payment to the building committee. This way, there is no need for an IEC meter for each parking space.

The investment model: if the building invests in the infrastructure, there is no commitment. If DSGCharge invests in the infrastructure, the commitment is for 10 years. What the monthly billing report looks like: Monthly charging report and billing by TOU meter, and what OCPP is, simply put: OCPP managed charging station.

Is a home charging station with a built-in consumption meter for billing per kWh worth it?

It depends on whether there is someone to bill. If the station serves a resident in a building, an employee who gets reimbursed for charging expenses or a business that charges customers, an OCPP managed charging station like the DSG-6012, which records every charging session in the cloud, is worth it. For private use at home, a smart charging station with an app is enough.

Model Power Type Suitable for Store price
DSG-1061 11kW Smart Private house ₪1,590 (instead of ₪2,190)
DSG-1062 22kW Smart Private home with a three-phase connection ₪1,790 (instead of ₪2,390)
DSG-6012 22kW OCPP managed Buildings, parking facilities, businesses, expense reimbursement ₪3,290

Prices for the station only, without installation, as of November 2026. For companies with assigned company cars: EV fleet management, including measuring charging at the employee's home for expense reimbursement.

Does a home charging station need a Type B RCD?

DSGCharge stations have built-in leakage current protection: AC 30mA and DC 6mA. Built-in DC leakage detection makes it possible in many cases to use a simpler RCD in the panel. The type of protection in the panel is determined by the installer according to the installation guidelines and the station's data. The products hold Standards Institution of Israel (SII) approvals.

Does a separate meter affect the TOU tariff?

The TOU tariff is determined by the IEC meter (smart meter), not by the station. Peak hours apply only Sunday–Thursday (17:00-22:00 in winter and the transition seasons, 17:00-23:00 in summer), and weekends are off-peak in all seasons. Prices vary by season. A smart charging station lets you schedule charging for off-peak hours, and in a large building, smart Energy management distributes the power among the stations. What you'll actually pay: Charging cost calculator.

Why plan the connection with DSGCharge?

DSGCharge plans the connection according to the conditions on site: the meter location, the connection size, the distance to the parking space and the number of stations. In a private home, this is usually a dedicated circuit from the panel. In an apartment building, it is splitting from the apartment's meter or a managed system for the whole building. Installation and service are provided across the country. The range of stations and accessories: EV charging stations. For advice: 077-9920350.

Frequently asked questions about electricity meters for charging stations

Is a separate electricity meter mandatory for a home charging station?

No. In most private homes, the station is supplied from the home's electrical panel on a dedicated circuit, and the consumption goes on the regular electricity bill. Splitting from the meter or a separate connection is needed mainly when you want the consumption to go on a specific apartment's bill in an apartment building, when the parking space is far from the panel, or when billing needs to be separated.

How much does splitting from the IEC meter for a charging station cost?

The DSG-9907 service costs ₪2,790 (as of November 2026). The price includes the payment to the IEC for the disconnection, setting up a split panel next to the meter, approval by an electrical inspector and reconnecting the power to the home. Installing the station itself is priced separately (DSG-9903 up to 20 meters: ₪2,590; DSG-9904 up to 30 meters: ₪2,990). The timeline is set by the IEC.

How do you bill a resident for charging in an apartment building without a separate meter for each parking space?

With a managed charging system: each station measures the kWh of each charging session, and DSGCharge reads the TOU meter, bills each resident according to their consumption and transfers the payment to the building committee. The service fee for a managed charging station: ₪35 per month + 20 agorot per kWh.

Is it worth buying a home charging station with built-in consumption measurement for billing per kWh?

If you need to bill someone by consumption (a resident, an employee who gets expense reimbursement, a business), an OCPP managed charging station like the DSG-6012, which reports every charging session to the cloud, is worth it. For private use at home where there is no one to bill, a smart charging station like the DSG-1061 or DSG-1062 is enough.

Does a home charging station need a Type B RCD?

DSGCharge stations have built-in leakage current protection: AC 30mA and DC 6mA. Built-in DC leakage detection makes it possible in many cases to use a simpler RCD in the panel. The type of protection in the panel is determined by the installer according to the installation guidelines and the station's data.

Does a separate meter let you charge on the TOU tariff?

The TOU tariff is determined by the IEC meter (smart meter), not by the station. Peak hours apply only Sunday–Thursday (17:00-22:00 in winter and the transition seasons, 17:00-23:00 in summer), and weekends are off-peak in all seasons. A smart charging station lets you schedule charging for off-peak hours.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 