Upgrading your electrical connection to 40 amps for an EV: will a load management system save you the headache?

Considering upgrading your electrical connection to 40 amps because of an electric vehicle? Find out how a smart load management system can save you money, time and unnecessary bureaucracy. The complete guide.
Electrical panel with circuit breakers and an RCD

Upgrading your electrical connection to 40 amps for an EV: will a load management system save you the headache?

In short: לא תמיד צריך להגדיל את חיבור החשמל ל-40 אמפר כדי להתקין עמדת טעינה לרכב חשמלי. הגדלת חיבור עולה לרוב ₪6,000–₪10,000 ונמשכת בין כמה שבועות לחודשים, ואילו מערכת ניהול עומסים דינמית (DLM) מווסתת את קצב הטעינה לפי הצריכה בבית ומאפשרת להתקין עמדה גם בחיבור קיים של 25 או 32 אמפר.

DSGCharge (DSG Charging Solutions) is one of Israel's leading companies in EV charging solutions: active since 2021, with about 20,000 of its chargers and charging stations sold and installed, and it provides installation and service nationwide.

It finally happened. After months of anticipation, your shiny new electric vehicle is parked in the driveway. You are enjoying the quiet, the fuel savings and the contribution to the environment. But then, when you plug it in for the first time and turn on the air conditioner, the most frustrating thing happens – the main breaker trips. Welcome to the dilemma that troubles many electric vehicle owners in Israel: do you really need to go through the bureaucratic and expensive process of Upgrading the electrical connection to 40 amps, or is there perhaps a smarter alternative? Is a load management system for electric vehicles the solution that will prevent the headache and save you thousands of shekels? In this comprehensive guide, the experts at DSG Charging Solutions sort it all out.

If you are planning a home charging station, you can compare the 11kW and 22kW models on the Home charging stations in the DSGCharge store.

Bought an electric vehicle? Congratulations! But is your electrical connection ready?

The excitement that grips the owner of a new electric vehicle is completely understandable. It is a significant technological change, a move to cleaner transportation, and above all – the end of dependence on fuel stations. But alongside all the advantages comes a new electrical reality. Most homes in Israel have a standard electrical connection of 25 amps or 32 amps (on a three-phase connection). This connection was designed to handle typical household appliances, but it doesn't always take into account the new ‘beast’ in the family: the charging station. Discovering that the existing infrastructure may not be able to handle the load is a surprising and unpleasant moment that raises a critical question. Is the only solution to open your wallet, prepare for digging and bureaucracy, and upgrade the connection? Or perhaps technology offers a workaround that is far more efficient and economical? The answer, fortunately, is yes, but first it is important to understand why the problem arises in the first place.

The need for a connection upgrade: when and why does it happen?

To understand the problem, we need to talk in terms of ‘amps’ (A), the unit of measurement for electric current. Think of your home electrical connection as a main water pipe of a certain thickness. Every electrical appliance you turn on ‘draws’ a certain amount of water (current) from the pipe. If you open too many faucets at the same time, the pressure drops, and in the case of electricity – the main circuit breaker trips to prevent damage to the system. An EV charging station is an especially large ‘faucet’.

Let's compare the current draw of common appliances with that of a charging station:

  • Average air conditioner: Draws between 10 and 15 amps.
  • Electric water heater: Draws about 10-16 amps.
  • Oven: Draws about 10-15 amps.
  • Home charging station (three-phase 11kW): Draws 16 amps *on each phase*.
  • Faster charging station (three-phase 22kW): Can draw up to 32 amps *on each phase*.

Now, imagine a typical Israeli scenario on a summer evening: the car is plugged in (16A), the living room air conditioner is running (15A), someone turned on the water heater for a shower (10A) and the oven is heating dinner (12A). On a standard 25A or even 32A connection, the total momentary consumption easily exceeds the limit and trips the main circuit breaker. This is exactly the point where many people think the only solution is to upgrade the main ‘pipe’ to 40 amps, but as we will see, this is not always the right or most cost-effective step.

Dynamic load management prevents breaker trips and ensures continuous operation.
Dynamic load management prevents power trips and ensures continuous operation.

How much does it cost to upgrade a connection to 40 amps? The process and the price

You have decided it is time to upgrade your electrical connection. Be prepared for a bureaucratic process that requires patience, coordination and, of course, a considerable expense. The process is not as simple as pressing a button; it involves several parties and stages, and every small mistake along the way can delay it by weeks. Here is a breakdown of the main stages and associated costs:

  1. Hiring a certified electrician: The first and essential step is contacting an electrician with the appropriate license. The electrician will carry out a thorough inspection of the existing electrical infrastructure in your home, from the electrical panel to the main connection point, to make sure it can support the higher power. The cost of the inspection and initial consultation can range from 300 to 600 shekels.
  2. Submitting an application to the IEC: After the electrician confirms that the infrastructure is in order, they submit a formal application on your behalf to the Israel Electric Corporation (IEC) to upgrade the connection. The application includes plans and technical approvals.
  3. Paying a fee to the IEC: Upgrading the connection is not a free service. The IEC charges a fee for the upgrade, which as of 2026 can reach thousands of shekels, depending on the size of the upgrade and the type of connection (single-phase or three-phase).
  4. The electrician's work: After receiving approval from the IEC, the electrician carries out the required physical work. This work may include replacing main cables, replacing the main circuit breaker in the panel, and sometimes additional adjustments to the infrastructure. The cost of this work can range from 6,000 to 10,000 shekels and even more, depending on the complexity.
  5. Coordination and final inspection: When the work is finished, you need to schedule a visit from an IEC representative to carry out the final inspection and connect the property to the grid at the new capacity.

All in all, the entire process can take anywhere from several weeks to months, and the total cost usually ranges from 6,000 to 10,000 shekels. This is a bureaucratic headache and a significant financial burden that many people are not aware of when they buy the car. This is exactly where the technological solution comes in that makes this entire process unnecessary, in line with theMinistry of Energy regulations that encourage smart consumption management.

The smart, cost-effective solution: a dynamic load management system (DLM)

Imagine for a moment a smart traffic controller at a busy intersection. Instead of a simple traffic light, it detects the traffic load in each direction and adjusts the lights dynamically to prevent traffic jams. This is exactly the analogy for how a dynamic load management system (Dynamic Load Management – DLM) works in your home electrical infrastructure. Instead of widening the ‘road’ (upgrading the connection), the system manages the ‘traffic’ (electricity consumption) in a smart and efficient way.

So how does it work in practice? The principle is remarkably simple. A certified electrician installs a small current sensor (CT clamp) in the main electrical panel, on the cable that carries electricity to the whole house. This sensor is the system's ‘ears’; it continuously ‘listens’ to the home's total electricity consumption. This information is transmitted in real time to the smart charging station. When the system detects that household consumption is approaching the connection limit (for example, 24 amps on a 25-amp connection), it automatically sends a command to the charging station to temporarily reduce the charging rate. As soon as another appliance in the house turns off (for example, the air conditioner reaches the desired temperature), total consumption drops, and the system instructs the charging station to go back to charging at full speed. The end result: the vehicle charges at the maximum possible efficiency at any given moment, without causing overload and without ever exceeding the existing connection limit. This is a solution that applies the principles of the ISO 50001 energy management standard at the household level.

Advantages of a load management system (DLM)

  • Saving thousands of shekels: The system completely eliminates the need for the expensive connection upgrade process, saving the IEC fees and the electrician's work.
  • No bureaucracy or headaches: No more forms, waiting for representatives or cumbersome coordination with the IEC.
  • Fast and simple installation: A certified electrician can install the system together with the charging station within a few hours, with no need for complex infrastructure work.
  • The ultimate safety solution: The system actively prevents overloads on the electrical infrastructure, keeping the home safe and preventing potential damage to appliances.
  • Ideal for private homes and apartment buildings: The solution is flexible and suits both a private customer and charging management for multiple vehicles in an apartment building, where upgrading the common connection is a far more expensive and complicated project.

The full process, from checking the electrical panel to connecting the station and load management, is explained on the page EV charging station installation from DSGCharge.

DSG Charging Solutions: our expertise, your savings

While many still seeEV charging as a technical challenge, we at DSG Charging Solutions see it as an opportunity to implement smart, cost-effective solutions. We specialize in the supply and installation of smart charging stations from DSGCharge, designed from the outset to work in perfect synergy with load management systems. Our solutions are not ‘off the shelf’; we believe in full customization to the customer's needs. Our professional team comes on site, carries out a comprehensive survey of the electrical infrastructure, understands your usage patterns – both for the vehicle and at home – and only then recommends the optimal solution. Whether it is a private home with a limited electrical connection or an apartment building that wants to install several charging stations without getting into an expensive infrastructure upgrade project, our expertise ensures that you get the most efficient, safe and cost-effective solution that will serve you for many years to come.

The smart sensor monitors total electricity consumption and enables automatic regulation of charging.
The smart sensor monitors overall electricity consumption and allows automatic regulation of charging.

Frequently asked questions

Will a load management system significantly slow down my vehicle's charging?

זו שאלה מצוינת וחשש נפוץ. התשובה הקצרה היא – ברוב המוחלט של המקרים, לא תרגישו בהבדל. המערכת חכמה ומנצלת את הזמן ביעילות. רוב טעינת הרכבים מתבצעת בלילה, שעות בהן צריכת החשמל הכללית בבית נמוכה משמעותית. בזמנים אלו, המערכת תאפשר לעמדה לטעון במלוא המהירות האפשרית. ההאטה הזמנית מתרחשת רק בפיקים של צריכה, למשל כשמספר מכשירים כבדים פועלים בו-זמנית. גם אז, הטעינה לא נעצרת אלא רק מואטת. בסופו של יום (או לילה), הרכב שלכם יהיה טעון במלואו ומוכן לנסיעה בבוקר, בדיוק כמו בטעינה ללא המערכת.

Is the solution also suitable for an apartment building?

Absolutely, and not only is it suitable – it is highly recommended and considered the ultimate solution for apartment buildings. Upgrading the building's common (‘shared’) electrical connection is an extremely expensive and logistically complicated project that requires the consent of all residents. A central load management system makes it possible to install a large number of charging stations in the parking garage while making smart use of the existing capacity. The system divides the available power among the connected vehicles dynamically and equally, ensuring that everyone gets charged without tripping the building's power. This is the key that allows electric vehicles to enter existing buildings smoothly. At DSGCharge we offer charging management solutions for apartment buildings specially tailored to these challenges.

What is the cost difference between the two options?

The difference is dramatic. As we detailed, the connection upgrade process involves fixed fees to the IEC and high labor costs for the electrician, which can easily add up to 5,000-8,000 shekels and sometimes even more, and that is before the cost of the charging station itself. In contrast, adding a load management module to a smart charging station is a significantly cheaper solution. The exact cost depends on the charging station model and the installation conditions, but in general you save thousands of shekels. Beyond the initial savings, you get the added value of improved safety and smart energy management. To get an accurate picture, the best way is to get a personalized quote.

In summary: a smart decision today, savings for years to come

Switching to an electric vehicle is a smart, economical and green decision. But for the experience to be perfect, it is important to make a smart decision about your home charging infrastructure as well. Before you rush into the bureaucratic and expensive process of upgrading your electrical connection, stop and consider the technological alternative. A smart charging station equipped with a dynamic load management system is not a compromise – it is the most advanced, safe and efficient solution for the vast majority of homes in Israel. This is not just an investment in your vehicle, but an investment in the proper, smart management of your entire home electricity system, which will save you money, time and unnecessary headaches.

Not sure what the right solution is for you? You don't have to decide alone. The experts at DSG Charging Solutions will be happy to provide you with personal, professional advice with no obligation, and build the perfect charging package for you. Contact the DSGCharge experts for a consultation today, and start charging smart.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 