EV charging stations directly from DSGCharge: smart home stations with an app, managed public stations and DC fast charging stations for businesses and vehicle fleets. All stations come with professional installation and service nationwide.

EV charging stations

Showing 1–12 of 26 results

How do you choose an EV charging station?

  1. Where the station will be installed. Private house or assigned parking: a home station. Apartment building: a managed station with metering for each resident. Business, parking facility or municipality: a public station with payment processing and remote management.
  2. Power. The charging rate is set by the weakest link: the station, the car's on-board charger and the electricity connection. On a single-phase connection charging is up to about 7.4kW, and on three-phase 11kW or 22kW.
  3. How many cars. For two cars at home: two standard stations with load management, cheaper than a dual station. A dual station is mainly suited to parking facilities and public places.
  4. AC or DC. AC for home and work, charging over a few hours. DC for fast charging in tens of minutes, for vehicle fleets, stations and businesses.
  5. Management. App, scheduling for off-peak TOU hours, RFID cards and management via the OCPP protocol.

Station types

Installation and service

You can order professional installation together with the station, nationwide. The steps, price and standards are on the page EV charging station installation.

Why DSGCharge

  • The importer, active since 2021.
  • About 20,000 chargers sold and installed.
  • Rated 4.8 out of 5 in Google reviews (as of November 2026).
  • Nationwide installation and service.
  • SII-approved products.
  • Cloud management system for managed and public stations.

Guides to help you choose

Frequently asked questions

Which charging station is right for a home? On a three-phase connection, an 11kW station is enough for most private cars. On a single-phase connection charging will be up to about 7.4kW.

How long does it take to charge an EV at home? A 60 kWh battery, from empty to full: about 6 hours at 11kW, and about 9 hours at 7.4kW. Day to day 2–4 hours overnight are enough.

What is the difference between an AC and a DC station? AC supplies alternating current, and the car's on-board charger converts it. DC charges the battery directly, so it's much faster.

Can a station be installed in an apartment building? Yes. The process with the building committee is detailed inthe law on installing a charging station in an apartment building.

How much does a charging station cost? The current price appears on each product. A full comparison onCharging station price list.

Accessibility Toolbar