How much does an EV charging station cost? The full 2026 price list including installation

How much does a home charging station cost including installation in 2026? Station and installation price list, electrical connection upgrades, examples of total cost in a private home and an apartment building, and the cost of charging itself.
A modern EV connected to a home charging station in a private parking spot in the evening

In short: Home charging station for an electric vehicle usually costs ₪4,000–₪6,000 including installation in a private home, and₪7,000-₪10,000 in an apartment building where a connection has to be split from the meter and a long cable run. The price is made up of three parts: the station itself (about ₪1,600–₪3,300), the installation work (about ₪2,500–₪3,000 for up to 30 meters of cable) and site-specific extras – additional meters, splitting from the meter, a cabinet or pedestal, and sometimes an electrical connection upgrade with the Israel Electric Corporation (IEC). The final price is set only after checking the electrical panel, the distance to the parking space and the connection size.

Updated: November 2026

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and its installation and service teams operate nationwide. The prices in this guide are DSGCharge store prices. For the full installation process: EV charging station installation; for all models and accessories: EV charging stations.

📊 Guide highlights (updated November 2026)

  • Home station 11-22kW: ₪1,590-₪2,390. Managed station for a building: ₪3,290.
  • Standard installation: ₪2,590 up to 20 meters of cable, ₪2,990 up to 30 meters, and each additional meter ₪69.
  • Connection upgrade from 3X25 to 3X40 amps: a payment to the IEC of about₪2,900 before VAT, plus electrician work.
  • Charging at home costs about₪10 per 100 km – compared with about₪65 in a gasoline car.

For all models and current prices, see the EV charging stations in our store.

Home charging station price list 2026

The price of a station depends mainly on its power (how fast it charges), its smart features (app, RFID, load management, OCPP) and whether it's intended for a private home or a shared parking garage. These are DSGCharge's prices, alongside the market price range:

Station type Suitable for DSGCharge price Market range
Smart charging station 11kW (DSG-1061) Private home with a three-phase connection, most electric vehicles. Activation via RFID, app or Plug&Play ₪1,590 ₪1,200-₪2,200
Smart charging station 22kW (DSG-1062) Vehicles that support 22kW AC charging, or anyone who wants headroom for the future ₪1,790 ₪1,200-₪2,500
Advanced smart charging station 22kW (DSG-1072) Like the DSG-1062, with Wi-Fi in addition to Bluetooth – monitoring and charging control through the app even when you're away from home ₪2,390 ₪1,700-₪3,000
Managed charging station 22kW (DSG-6012) Apartment building, parking facility, business – per-user billing and load management ₪3,290 ₪2,400-₪4,000
Dual charging station 2×11kW / 2×22kW Two electric vehicles in the same parking area ₪5,990-₪6,490 ₪5,000-₪8,000
Granny cable / portable EV charger up to 3.7kW (DSG-350) Backup and occasional charging from a household socket (up to 10 amps), with no installation ₪699 ₪700-₪1,500

💡 How much power do you really need? Most electric vehicles in Israel charge on AC at up to 11kW, so a 22kW station won't charge them any faster. It's worth the small price difference only if your car supports 22kW, if you plan to replace your car, or if you want to share the power between two vehicles. With a single-phase connection, the maximum is about 7kW anyway. More on this topic: 11kW or 22kW station – which is better.

How much does installation cost?

The installation work is the part that varies most from home to home. A standard installation includes a dedicated circuit breaker in the electrical panel, residual current protection, running the cable in an external conduit to the parking space, mounting the station, commissioning and testing.

Component DSGCharge price Notes
Standard installation up to 20 meters of cable ₪2,590 In an external conduit, including connection to the panel and commissioning
Standard installation up to 30 meters of cable ₪2,990 Suitable for most parking spaces in private homes and small parking lots
Each additional meter of cable ₪69 per meter Beyond the meters included in the installation
Splitting the connection from the IEC meter ₪2,790 Includes a splitter panel next to the meter, payment to the IEC for disconnection and reconnection, and inspector approval
apartment building installation survey ₪690 The amount is credited against the installation cost if you install with us
Charging station cabinet – wall-mounted / Pole-mounted 790 / ₪1,390 Protection against vandalism and weather in open parking
Telescopic pedestal for mounting a station ₪690 When there's no wall next to the parking space

What a standard installation doesn't include: Construction work such as chiseling into a wall, lifting interlocking pavers, cutting asphalt, digging, pouring concrete or drywall work, as well as an electrical connection upgrade with the IEC. In a professional quote these items appear separately, so they don't come as a surprise at the end.

A certified electrician checks a home electrical panel to determine whether it is single-phase or three-phase

3 examples of total cost

To see how the numbers add up, here are three common cases based on the price list above:

Scenario What's included Estimated cost
Private home, electrical panel close to the parking space 11kW station (₪1,590) + installation up to 20 meters (₪2,590) About ₪4,180
Private home, distant parking space (35 meters) Smart charging station 22kW (₪2,390) + installation up to 30 meters (₪2,990) + 5 additional meters (₪345) About ₪5,725
Apartment building, basement parking (40 meters from the meter) Managed charging station (₪3,290) + installation up to 30 meters (₪2,990) + 10 additional meters (₪690) + splitting from the meter (₪2,790) About ₪9,760

If you also need an electrical connection upgrade, chiseling or a cabinet, add them to the total. Want a calculation for your home? installation cost calculator gives an initial estimate within a minute.

7 factors that determine the final price

  1. The distance from the electrical panel to the parking space. This is the most significant factor. The cable for a three-phase station is thick and expensive, and every meter beyond what's included in the installation costs money – and labor.
  2. The cable route. Running it in a wall-mounted conduit is the simplest. Passing through shafts, ceilings, several floors or under flooring adds to the cost.
  3. Construction work. Chiseling, lifting pavers, digging or cutting asphalt are priced separately, and sometimes require an additional tradesperson.
  4. Condition of the electrical panel. In many homes the station isn't the problem – the panel is. An old panel with no free space or without suitable protections requires adaptation or a sub-panel.
  5. Size of the electrical connection. If the existing connection (for example, 3X25 amps) isn't enough for the station and the home together, there are two options: a connection upgrade with the IEC, or a station with load management that adjusts the charging rate to the household consumption. More on this: Upgrading the connection to 40 amps vs. a load management system.
  6. Private home or apartment building. In a building you usually need to split a connection from the apartment's meter or connect to shared infrastructure with metering for each resident – and this changes both the type of station and the scope of work.
  7. Station type and extras. A managed charging station with per-user billing, a protective cabinet, a pedestal, a separate meter – each of these adds to the cost, but sometimes saves much more later on.

Electrical connection upgrade: how much does it cost and when is it needed?

An 11kW station consumes roughly as much as a large air conditioner running nonstop. In a home with a 25-amp three-phase connection, running the station together with air conditioners, an oven and a water heater can trip the main circuit breaker. In that case there are two options:

  • Upgrading the connection to 3X40 amps. According to the Electricity Authority's tariff book (July 2026), the connection fee to the IEC for moving from 3X25 to 3X40 in a single apartment is about ₪2,900 before VAT, and the annual capacity charge rises by about ₪76 a year. On top of that comes the electrician's work. The IEC states a lead time of up to 30 working days from payment, and longer if grid work is required.
  • A station with load management. The station measures household consumption and lowers the charging rate when necessary – without upgrading the connection. In most homes this is the cheaper and faster solution.

A certified electrician should check the existing connection before you decide. The order with the IEC is placed by the consumer registered on the electricity account.

Installation in an apartment building: what's different about the price?

In an apartment building, installation is almost always more expensive than in a private home, because the parking space is far from the apartment and the meter, and the cable runs through common areas. There are two main ways to connect the station:

  • Splitting from the apartment's meter – the station is connected to the resident's electricity account, so there's no need to settle accounts with the building committee. Suitable when there are only one or two residents with an electric vehicle.
  • Shared infrastructure with managed charging stations – the building sets up a single infrastructure for the whole parking garage, and each resident pays for their own consumption through a management and payment system. Suitable when more residents are switching to electric vehicles, and it prevents duplicate cables running from every apartment.

Before getting a quote in a building, it's worth ordering a Installation survey: a surveyor comes to the building and checks the route from the meter to the parking space and what's required – and the quote you receive afterward is accurate. Information about your rights with the building committee: the law on installing a charging station in an apartment building, and about the solution for the whole building: Charging station installation in apartment buildings.

How much does a managed charging station cost in an apartment building, and what's the monthly cost?

The DSG-6012 managed charging station (22kW) costs ₪3,290 in the DSGCharge store, plus the installation cost depending on the distance from the infrastructure. The service fee for a managed charging station is ₪35 per month + 20 agorot per kWh. The station is connected to a cloud management system that divides power among the stations (load management) and bills each resident for their own consumption.

Model Who invests in the infrastructure Commitment
The building invests The building / the residents No commitment
DSGCharge invests DSGCharge 10-year commitment

As of November 2026.

A full explanation of the solution for the whole building: Managed charging stations in apartment buildings. To calculate the monthly charging cost under the TOU tariff: Charging cost calculator.

Why not to choose a station based on price alone

The common mistake is comparing station prices before checking the infrastructure. A station that's ₪300 cheaper isn't worth much if, after ordering, it turns out the panel isn't suitable, the connection is too small, or the station doesn't support the load management the building will require later. Here's the right order:

  1. Checking the electrical panel, the connection size and the distance to the parking space.
  2. Choosing a power rating and station type that suit the infrastructure and the vehicle – not just the price.
  3. Getting a detailed quote that includes all the items.

A station with open communication (OCPP) and load management costs a little more, but it's the one that will allow connection to the building's system, billing by consumption and upgrades without replacing equipment when the second resident buys an electric vehicle.

Checklist: what to check in a quote

  • Does the price include the station, installation, commissioning and testing – or only some of them?
  • How many meters of cable are included, and what's the price for each additional meter?
  • Which construction work is not included (chiseling, lifting flooring, digging)?
  • Has the electrical connection size been checked, and is an upgrade or load management required?
  • Is the installation performed by a certified electrician and inspected?
  • What's the warranty on the station and the installation, and who provides service after installation?
  • Does the station support OCPP and load management – in case the building sets up a shared system?

How much does charging itself cost after installation?

Once you've invested in a station, charging at home is the cheapest way to charge: about ₪10 per 100 km on the uniform residential tariff, and less than that during off-peak hours on the TOU tariff. A driver who covers 20,000 km a year saves about ₪11,000 a year compared with gasoline, so a station with installation usually pays for itself in less than a year.

All the tariffs, night and TOU plans, the cost of a full charge and a comparison table with gasoline – in the dedicated guide: How much does it cost to charge an EV at home.

Frequently asked questions

How much does a home charging station cost including installation?

In a private home where the panel is close to the parking space – about ₪4,000–₪4,500 (an 11kW station and installation up to 20 meters). For a distant parking space or with an advanced smart charging station – about ₪5,000–₪6,000. In an apartment building with splitting from the meter – usually ₪7,000–₪10,000.

Can you get a final price over the phone?

You can get an estimate, but a final price requires knowing the distance from the panel to the parking space, the condition of the panel and the connection size. So for a private home, photos of the panel and parking space are sent, and in an apartment building an on-site survey is recommended.

A 7kW, 11kW or 22kW station – what's the price difference?

The difference in the station price is small – a few hundred shekels. The real difference is in the infrastructure: an 11 or 22kW three-phase station needs a three-phase connection and a thicker cable. In a home with a single-phase connection, the maximum is about 7kW.

Do you have to upgrade the electrical connection?

Not always. If the existing connection isn't enough, you can upgrade it with the IEC (about ₪2,900 before VAT for moving from 3X25 to 3X40, plus electrician work), or install a station with load management that adjusts charging to household consumption.

How long does installation take?

A standard installation in a private home usually takes a few hours on a single day. In an apartment building, and especially when splitting from the meter or a connection upgrade is needed, the timeline also depends on approvals and on the IEC.

Which is better in a building: splitting from the meter or a managed charging station on shared infrastructure?

For a single resident with an electric vehicle, splitting from the meter is simple and clear – the charging goes on their own electricity bill. When there are, or are expected to be, several residents with electric vehicles, shared infrastructure with managed charging stations and billing by consumption is cheaper for each resident and saves duplicate cables.

Is a smart charging station worth the extra cost?

Yes, in most cases. The price difference is a few hundred shekels, and it lets you schedule charging for cheaper TOU hours, track consumption, and connect the station to a building management system in the future.

What is the warranty on the station?

DSGCharge home charging stations come with a 24-month on-site warranty at the customer's home (12 months for the portable charger), and it can be extended up to 5 years.

Prices on the DSGCharge website are correct as of November 2026 and subject to change. Market price ranges were collected from published price lists of installation companies. Electricity and connection tariffs are per the Electricity Authority's tariff book, in effect from July 1, 2026.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 