An EV charging station in an underground parking garage is safe when installed according to the Electricity Administration guidelines. What is required, what fire officials have said, what the building regulations mandate and how to plan load management.

In short: Yes. A charging station in an underground parking garage is safe when it is installed according to the Electricity Administration guidelines (25.11.2025): a fixed station with laboratory approval, a dedicated circuit, a dedicated RCD and a nearby isolating switch, mechanical protection, and an inspection by an inspecting electrician before commissioning. In an apartment building, load management is added, because the parking garage's connection is limited.

Updated: November 2026

This question comes up at almost every residents' meeting: is it even allowed to charge an EV in an enclosed parking garage under the building, and what happens if there's a fire? In this guide we'll go over what the official guidelines require, what fire officials have said, what the building regulations mandate for new buildings, and how to plan a charging station in an underground parking garage that meets all the requirements.

Is it allowed to install a charging station in an underground parking garage?

Yes. The Electricity Administration guidelines for installing an EV charging system apply to every parking space, including building parking, business parking and public parking facilities, and they do not prohibit installation in an underground parking garage. What matters is that the installation meets every section of the guidelines and is carried out by at least a certified electrician.

The Electricity Administration is the body at the Ministry of Energy that sets the safety rules for electrical installations. The guidelines were published on 25.11.2025, and all the sections are detailed in the guide Charging station installation guidelines our

What do the guidelines require of a charging station in an enclosed parking garage?

The guidelines don't define a separate chapter for underground parking, but several sections are especially important in a shared parking garage. The table summarizes them by section number.

Guideline section What's required Why it matters in an underground parking garage
Section 3: Design and installation At least a certified electrician; the charging current is limited to the circuit breaker's current No amateur installations in a shared parking garage
Section 4: Supply A dedicated final circuit from a cable, overcurrent protection for each connection point, a nearby labeled isolating switch Each station can be disconnected on the spot, without searching the main panel
Section 6: RCD A dedicated 30mA RCD for each AC connection point, of the type the guidelines specify The main protection against electric shock
Section 7: Overvoltage Mandatory in the shared parking garage of a residential building and in public use A quote for a building without such protection is incomplete
Section 10: Equipment Accredited laboratory approval, mechanical protection or IK08, operating height 0.5-1.5 meters In a parking garage, vehicles pass close to the station
Section 15: Initial inspection An inspecting electrician before first commissioning and after a major change A station must not be operated before the inspection
Section 16: Periodic inspections Pressing the RCD test button and a visual inspection at least once a year; an electrician's inspection once every six years Whoever is responsible for the parking garage needs a schedule

As of November 2026, according to the Electricity Administration guidelines of 25.11.2025.

IK08 is the impact resistance rating of the station's enclosure, according to the IEC 62262 standard. When the station doesn't meet this rating, it is protected by a sheltered location, aCharging station cabinet or a parking stopper.

Do EVs catch fire more often than gasoline cars?

According to fire officials in Israel, no. The Dan District commander of the Israel Fire and Rescue Authority said in an interview with Walla (22.4.2025) that electric cars catch fire less often than gasoline cars and have far fewer incidents. The challenge is extinguishing: a battery fire lasts longer and is harder to put out, so the fire service prepares for it separately.

According to the same article, the Fire Commissioner appointed a committee on electric vehicles in 2022, and following it, dedicated fire blankets were purchased and placed at stations in urban areas with underground parking garages. In an article in Calcalist (12.8.2024), fire officials noted that the electrical systems in some existing parking garages were not designed for the load of charging stations. That is exactly why the installation should be planned in advance rather than connecting stations to an existing panel.

Is there a special regulation for EVs in underground parking garages?

As of November 2026, we have not found a published national regulation that deals specifically with EV parking or charging stations in underground parking garages. A former deputy fire commissioner told Calcalist (18.8.2025) that there are fire safety requirements for parking garages, but no regulations dedicated to EVs, and no ban on parking an EV in an old parking garage either.

The practical meaning: in an existing parking garage, the general fire safety requirements of the garage apply, and the Electricity Administration guidelines apply to the stations themselves. In the parking garage of a business or public building, it's a good idea to also coordinate the design with the building's fire safety consultant.

What do the building regulations require in a new residential building?

The Planning and Building Regulations (Installation of Parking Spaces) (Amendment), 5782-2022, published on 7.9.2022, require charging infrastructure in new multi-unit construction: a building of six or more apartments on at least two floors, whose building permit application was submitted from March 2023 (six months after publication).

  • A shared electrical panel intended only for EV charging.
  • An electrical connection to this panel of at least 3 kilowatts times 20% of the number of parking spaces, i.e., about 600 watts per parking space.
  • Conduits from the panel to each of the parking spaces. Parking in a mechanical parking system is exempt.

Note the math: in a parking garage with 100 spaces, the minimum connection is 60 kilowatts. A single 22kW station at full charging uses more than a third of that. So in a new building, just like in an old one, stations in every parking space are only possible with load management.

Why does an underground parking garage need load management?

Load management is a system that divides the available power among the stations charging at that moment, so that total consumption doesn't exceed the connection size. Without load management, every additional station requires increasing the connection; with load management, dozens of stations can be connected to the same panel.

In an apartment building, this is also what makes it possible to bill each resident only for what they charged. This is how the Managed charging stations in apartment buildings from DSGCharge work: every station is connected to a cloud management system, the system balances the load, and DSGCharge reads the meter, bills each resident according to a TOU meter and transfers the money to the building committee. A full explanation of power balancing is in the guide Load management for charging stations.

Which charging station is suitable for an underground parking garage?

In a shared parking garage, you install a fixed station rather than a portable charger, with laboratory approval and a connection to load management. In an underground parking garage there's another point that's easy to miss: weak cellular reception. A managed station needs a stable connection to the cloud, so it's better to connect it with a network cable (LAN) or Wi-Fi.

Model Power Communication and management Best for Price
Managed charging station 22kW DSG-6012 22kW Wi-Fi, LAN or 4G, RFID card, app, OCPP Shared building parking with billing per resident ₪3,290
Public dual charging station 22kW DSG-6052 2x22kW Managed via OCPP in the cloud Business or public parking, guest parking ₪6,990
Smart charging station 22kW DSG-1062 Up to 22kW App, RFID, Bluetooth Assigned private parking in a building, when the station is connected to the apartment ₪1,790
Universal charging station cabinet DSG-410 – – Mechanical protection for a wall-mounted station ₪790

Store prices are correct as of November 2026. The price is for the station only, without installation. All stations in the category EV charging stations.

What should be checked before installing in an underground parking garage?

Before installing the first station in an enclosed parking garage, it's worth going through a short checklist. It saves duplicate work when more residents ask for a station.

  • Connection size and panel condition: How much power is available for the parking garage, and whether there is room for a separate charging panel.
  • Cable route: The distance from the panel to the parking spaces. The length of the charging cable itself is limited by the guidelines, as explained in the guide on Charging cable length.
  • Connectivity: Whether there is cellular reception on the parking level, or whether a network cable needs to be run.
  • Location of each station: Protected from vehicle impact, at the right height, without blocking passage.
  • Planning for the future: A system that allows stations to be added gradually, with load management and billing per user.
  • Approvals in an apartment building: What is required from the building committee and the residents, as explained in the guide EV charging station in an apartment building.

If you're planning stations throughout the parking garage rather than a single station, also read the guide Who provides a charging management system for a building.

Who installs and manages charging stations in underground parking garages?

DSGCharge is one of Israel's leading companies in EV charging solutions and has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. About 20,000 chargers and charging stations have been sold and installed, and its installation and service teams work nationwide.

In the parking facilities of buildings, towers and businesses, DSGCharge provides the entire chain: the stations, EV charging station installation, connection to a cloud management system (OCPP managed stations), load management, monthly billing and service. When the building invests in the infrastructure, there is no commitment; when DSGCharge invests in the infrastructure, the commitment is for 10 years.

Want a tailored quote?

Tell us how many parking spaces there are in the garage and how many stations you need today. You can get an initial estimate with theCharging station installation cost calculator, leave their details or call 077-9920350.

Frequently asked questions

Is it allowed to charge an EV in an underground parking garage?

Yes. The Electricity Administration guidelines (25.11.2025) apply to every parking facility and do not prohibit charging in an underground parking garage, provided the station is installed according to all sections and inspected by an inspecting electrician before commissioning.

Is an EV more dangerous in an enclosed parking garage?

According to the Dan District commander of the Israel Fire and Rescue Authority (Walla, 22.4.2025), electric cars catch fire less often than gasoline cars. A battery fire is harder to extinguish, so it's important to plan the installation and not connect stations to an existing panel.

Can you charge in a parking garage with a portable charger?

In a shared parking garage, our recommendation is a fixed station. According to the guidelines, a regular household outlet is allowed only for occasional charging, in a parking space that is not fixed, at a current of up to 10 amps.

How many stations can be installed in a parking garage without increasing the connection?

It depends on the available power. With load management, power is shared among the stations charging at that moment, so many more stations can be connected than without management. The exact estimate is made after checking the connection and the panel.

What must a developer of a new building prepare in the parking garage?

According to the Planning and Building Regulations (Installation of Parking Spaces) of 2022: new multi-unit construction requires a dedicated charging panel, a connection of at least 3 kilowatts times 20% of the number of parking spaces, and conduits to each parking space.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar