Will your charging station also suit your next electric car?

Bought an electric vehicle and worried that the charging station you install today will become irrelevant when you change cars? The concern is understandable, but the solution lies not in the connector type, but in proper planning of the infrastructure, the charging power and the ability to expand in the future.

Will your charging station also suit your next electric car?

Buying EV charging station is an investment for years. It is not just another car accessory, but infrastructure that is supposed to become part of your daily routine at home, in the building or at the business. So it's completely natural to stop for a moment and ask: “Wait, what if in two or three years I switch to a newer model – will I have to replace the entire installation and start over?”

This concern is justified. The electric vehicle market is evolving rapidly, batteries are getting bigger and charging speeds are improving. It's easy to get lost among terms like 11kW, 22kW, single-phase, three-phase, Type 2 or Load management. Out of this confusion, many people make a common mistake: they focus on the “most powerful charging station” or the flashiest brand, instead of asking what will really guarantee them peace of mind and flexibility for years to come.

The good news is that in most cases, the answer is no – you won't have to replace everything. The less convenient news is that this flexibility doesn't depend only on the charging station itself, but on the advance planning. That's the difference between a quick purchase and building a charging solution that will serve you faithfully with your next car, and the one after it.

You can compare DSGCharge charging stations, from 11kW and 22kW home charging stations to managed charging stations for buildings and businesses, on the EV charging stations.

The main concern: will the connector fit the next car? (Spoiler: that's not the real problem)

Many customers assume that the biggest risk is that the plug type on the charging station won't fit their future car. In practice, this is the smallest concern. The Type 2 connector is the absolute standard in Israel and Europe for AC charging (home charging and slow public charging). All electric vehicles sold in Israel today are equipped with a Type 2 port, and there is no reason for this trend to change in the foreseeable future.

So where does the risk actually lie? In short-term planning. The problem won't be whether you can plug in the car, but whether the electrical system and infrastructure you set up can support it efficiently, safely and without turning every charge into a headache. Your future flexibility is not determined by the shape of the plug, but by three main factors:

  1. Charging power (kW): Does the power you chose match your home's infrastructure and your real needs?
  2. Electrical infrastructure: Was the installation done professionally in a way that allows flexibility, or is it “just enough” for the current car?
  3. Smart management capabilities: Do you have control over electricity consumption, especially if a second car joins the family or more residents in the building switch to electric?

In other words, the question isn't “will the charging station fit the next car”, but “were the Installing the charging station and the advance planning done with the future in mind”.

What does change? Power, infrastructure and smart management capabilities

Let's break down the factors that really determine whether your charging solution will stand the test of time.

1. Charging power: why 22kW is not always the right solution

It's easy to assume that higher power (22kW) is always better. In reality, it's not that simple. The maximum charging speed depends on the weakest link in the chain: the charging station, the property's electrical infrastructure, and the vehicle's own on-board charger.

  • Single-phase infrastructure: The maximum a charging station can deliver is 7.4kW, provided you have at least 32 amps to allocate to the charging station and the vehicle can charge on a single phase at that rate.
  • Three-phase infrastructure: In most homes in Israel with a standard electrical connection (25A three-phase), the maximum power that can be allocated to a charging station is up to 11kW. Even if you install a 22kW charging station, it won't be able to deliver more than that.
  • Three-phase infrastructure: If you have a three-phase connection, you can install more powerful 11kW or 22kW charging stations. However, many electric vehicles (especially plug-in hybrids) don't support such fast AC charging at all, and are limited to 3.7kW.

The right choice: Instead of chasing the highest number, it's important to match the charging station's power to the existing infrastructure and the current car, but with an eye to the future. Sometimes, installing an 11kW charging station is a balanced solution that will serve most cars today and in the future, without overloading the electrical system.

2. Electrical infrastructure: the foundation for everything

The difference between an amateur and a professional installation is critical for the future. A proper installation is not just running a cable from the panel to the parking space. It includes a thorough inspection of the electrical panel, an assessment of the existing loads in the home, choosing the right cable cross-section for the distance, and installing the required protection devices. Infrastructure built “on the cheap” may not only limit you in the future, but can also be dangerous and, on top of that, cause voltage drops. 

The right choice: work with a company like DSGCharge that provides a complete solution – from consultation and an on-site suitability check to Charging station installation by certified electricians. Quality infrastructure built today will let you replace a charging station or upgrade the power relatively easily in the future, without the need for chiseling and complex electrical work all over again.

3. Load management: what makes the charging station truly smart

This is where the real key to the future lies, especially in homes with high electricity consumption, in apartment buildings or in businesses. Load management (dynamic, DLM) is a component installed in the electrical panel that lets the charging station “talk” to the rest of the house. It measures total consumption in real time, and if heavy appliances are turned on (air conditioner, water heater, oven), it automatically lowers the charging power to keep the main breaker from tripping. When the load drops, charging returns to full power.

The right choice: Home charging station with load management capability is a smart investment. It ensures that charging will always be optimal and safe, even if you add a second electric vehicle or your home's electricity consumption grows.

Long-term planning: how do you choose a solution that will grow with you?

A “future-proof” charging solution is not necessarily the most expensive or most powerful one, but the one that is properly planned for your specific situation.

  • In a private home: Even if you have one car today, it's worth considering whether a second electric vehicle may be added in the future. In that case, planning the infrastructure in advance or choosing a charging station with load management capability can save thousands of shekels in the future.
  • In an apartment building: Here, planning is critical. A situation where each resident installs a charging station independently very quickly leads to overloading the building's infrastructure, disputes and high costs. The right solution is a central managed charging system that allows dynamic load management across all the charging stations, user management and accurate billing for each resident. This is infrastructure that can easily be expanded as more residents switch to electric vehicles.
  • At a business or public parking facility: The future depends on the system's ability to grow. You need a solution that allows permission management (who can charge and when), usage monitoring, and the option of payment processing and billing customers. Such a system must be modular so that more Charging stations can be added easily as demand grows.

So how do you choose correctly? Questions you must ask before installation

Instead of focusing only on your next car model, focus on your reality. Before you buy a charging station, ask yourself (and your installer):

  • What is the electrical connection size at the property (single-phase or three-phase)?
  • How many electric vehicles are expected to use the charging station in the coming years?
  • Is it a private home, an apartment building, an office or a commercial parking facility?
  • Is load management needed to prevent power trips?
  • Is it worth preparing infrastructure that will make it easy to add charging stations in the future?

The answers to these questions will steer you to the right solution much more than comparing technical data on paper. Keep in mind: any general information online is only a starting point. When it comes to electricity, only a professional on-site inspection can give you the full picture.

At DSG Charging Solutions, we don't just sell off-the-shelf products. We build comprehensive charging solutions. Our process starts with understanding your unique needs – whether you are a private homeowner, a building committee, a fleet manager or a developer. We plan together with you a system that will work great today, and be ready to grow with you tomorrow.

Instead of guessing which of the dozens of The charging stations is the right one, let's talk about a solution that is truly tailored to you. Contact us for a consultation and initial planning, and we'll make sure your investment today will still be a smart one many years from now.

Frequently asked questions

If I change cars, will I have to replace the charging station too?

In most cases, no. The Type 2 connector is a uniform standard. The more important question is whether the infrastructure, the electrical capacity and the management capabilities of the existing solution were planned in advance in a flexible way that will also suit future cars with different charging capabilities.

What is more important for future planning, the charging station itself or the electrical infrastructure?

Both are important, but the infrastructure is the critical foundation. Quality, professional electrical infrastructure laid with the future in mind is what will let you upgrade or replace a charging station easily in the future, while poor infrastructure will limit you and make every change more expensive.

I live in an apartment building. Should I install a private charging station or think about a shared solution?

A “pirate” private installation can overload the building's infrastructure and cause problems. The recommended and correct long-term solution is to set up a managed charging system for all residents. Such a system takes care of proper load management, makes it easy to add residents in the future, and handles billing for electricity consumption.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar