22kW EV charging station: who it's for, what you need and how much it costs

A 22kW charging station is an advanced and common charging solution for private homes and offices in Israel, offering high charging speed and ease of use. In this article we look at when the charging station is suitable, its advantages, and what is important to check before buying – with an emphasis on professional matching and reliable service from DSGCharge.

Updated: November 2026

In short: A 22kW charging station is a three-phase AC charging station that delivers up to 22 kilowatts, meaning about 110-150 km of range per hour of charging. It requires a three-phase connection with 32 amps on each phase, and the vehicle will charge at 22kW only if its on-board charger supports it. In the DSGCharge store, a 22kW smart charging station costs ₪1,790 and a 22kW managed charging station costs ₪3,290 (as of November 2026).

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, and about 20,000 chargers and charging stations have been sold and installed, with installation and service teams throughout the country. In this guide you'll find what you need to install a EV charging stations rated at 22kW, who it pays off for and how much it costs.

If you're looking for a home charging station, you can compare the 11kW and 22kW models on the Home charging stations in the DSGCharge store.

What is a 22kW charging station?

A 22kW charging station is an alternating current (AC) charging station connected to three phases. It delivers up to 32 amps on each phase, for a total of about 22 kilowatts. This is the highest-power charging station in AC charging; above it you are already talking about DC fast charging stations.

kW vs. kWh: A kilowatt (kW) is the charging rate, and a kilowatt-hour (kWh) is the amount of energy in the battery. A 22kW charging station puts up to 22 kWh into the battery every hour.

Will my vehicle charge at 22kW?

The vehicle will charge at 22kW only if its on-board charger (OBC, On-Board Charger) supports 22kW AC charging. In many vehicles the on-board charger is 11kW, and then even a 22kW charging station will charge them at only 11kW. You can find this figure in the vehicle's specs, in the “AC charging” or “on-board charger” line.

The charging station and the vehicle “agree” on the current between them, so there is no danger in connecting an 11kW vehicle to a 22kW charging station. The full comparison between the two options: 11kW or 22kW charging station.

How long does it take to charge at a 22kW charging station?

Charging time depends on the battery size and the power the vehicle actually receives. The table shows the estimated time from empty to full, without charging losses:

Battery sizeVehicle that supports 22kWCar with an 11kW on-board chargerSingle-phase 7.4kW
40 kWhAbout 2 hoursAbout 3.5 hoursAbout 5.5 hours
60 kWhAbout 3 hoursAbout 5.5 hoursAbout 8 hours
80 kWhAbout 3.5 hoursAbout 7.5 hoursAbout 11 hours

In regular daily charging (40-60 km), you add only 8-12 kWh, so even an 11kW charging station is enough for most drivers. Detailed tables by model and power: How long does it take to charge an electric car.

What electrical connection does a 22kW charging station need?

A 22kW charging station needs a three-phase connection with 32 amps on each phase, a dedicated line from the electrical panel and a suitable circuit breaker and protection device. On a single-phase connection you can't reach 22kW: the maximum power is about 7.4kW.

  • 3X25 amp connection: You can install a 22kW charging station and limit its current, or upgrade the connection. A smart charging station lets you set the maximum current.
  • 3X40 amp connection and above: Usually allows charging at full power, depending on the consumption of the rest of the home.
  • Load management: A system that lowers the charging power when the home is using a lot of electricity, so as not to trip the main circuit breaker. Explanation: Load management for charging stations.

What the difference between single-phase and three-phase means in practice: Single-phase vs. three-phase in a charging station.

Who is a 22kW charging station for?

  • A home with a vehicle that supports 22kW, or with two electric vehicles that charge on the same night. Guide: Two electric vehicles at home.
  • Businesses and offices where vehicles park for several hours and need to fill up in a short time. See Charging stations for businesses.
  • Apartment buildings and parking facilities, with managed charging stations and power distribution among residents.
  • Anyone planning ahead: A 22kW charging station will charge your current vehicle at its own power, and will also suit your next vehicle.

If your vehicle charges at 11kW, you have one vehicle and you drive regular distances, an 11kW or a 22kW charging station will give you the same speed in practice. It's worth comparing price and infrastructure as well. The complete selection guide: Home charging station.

How much does a 22kW charging station cost?

Prices of 22kW charging stations in the DSGCharge store, as of November 2026:

ModelTypeSuitable forPrice
DSG-1062Smart charging station 22kWPrivate house₪1,790
DSG-1072Smart charging station 22kWPrivate house₪2,390
DSG-6012Managed charging station 22kW (OCPP)Buildings, parking facilities and businesses₪3,290
DSG-3012Dual charging station 22kWTwo cars₪6,490
DSG-6052Public dual charging station 22kW (OCPP)Parking facilities and businesses₪6,990
DSG-6112Public dual charging station 22kW, floor-standing (OCPP)Parking facilities and businesses₪7,990

Installation: Installation up to 20 meters (DSG-9903) for ₪2,590, andinstallation up to 30 meters (DSG-9904) at ₪2,990. A connection upgrade, digging or routing in a shared parking garage are priced separately. Quick estimate: Charging station installation cost calculator. What the installation includes and how it is carried out: EV charging station installation.

Smart or managed 22kW charging station?

A 22kW smart charging station is suitable for a private home: app control, scheduling charging for cheaper hours and current limiting. A 22kW managed charging station, such as the DSG-6012, connects to a cloud management system via the OCPP protocol, and enables permissions, load management across several charging stations and billing per user.

OCPP is an open communication protocol between the charging station and the management system. The full explanation: Managed charging station and OCPP. In buildings, DSGCharge sets up and manages the system, reads the TOU meter and bills each resident according to consumption. Service fees for a managed charging station: ₪35 per month + 20 agorot per kWh. Details: Managed charging stations in apartment buildings.

How much does it cost to charge at a 22kW charging station?

The charging station's power doesn't change the price per kWh. What matters is the electricity tariff and the time of charging. On the TOU (time-of-use) tariff, peak hours apply only on Sun’–Thu’ (17:00-22:00 in winter and the transition seasons, 17:00-23:00 in summer), and weekends are off-peak in all seasons. A smart charging station lets you schedule charging for off-peak hours. Calculation based on your vehicle and tariff: Charging cost calculator.

Why buy a 22kW charging station from DSGCharge?

  • DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The price, warranty and service come from a single source.
  • The products are approved by the Standards Institution of Israel (SII).
  • 24-month warranty on home charging stations, and installation and service throughout the country.
  • A range of 22kW charging stations: smart for the home, managed for buildings and businesses, and dual for two vehicles.

Frequently asked questions about 22kW charging stations

How long does it take to charge an electric car at a 22kW station?

In a vehicle that supports 22kW AC charging, a 60 kWh battery will charge from empty to full in about 3 hours. In a vehicle with an 11kW on-board charger, the same battery will charge in about 5.5 hours, even from a 22kW charging station.

Can a 22kW charging station be installed in a home with a single-phase connection?

Not at full power. On a single-phase connection the maximum power is about 7.4kW. To get 22kW you need a three-phase connection with 32 amps on each phase.

Will my vehicle charge at 22kW?

Only if its on-board charger (OBC) supports 22kW AC charging. In many vehicles the on-board charger is 11kW. You can find this figure in the vehicle's specs, in the “AC charging” line.

How much does a 22kW charging station cost?

In the DSGCharge store, as of November 2026: a 22kW smart charging station (DSG-1062) at ₪1,790, a 22kW managed charging station (DSG-6012) at ₪3,290 and a 22kW dual charging station (DSG-3012) at ₪6,490. Standard installation up to 20 meters: ₪2,590.

Is a 22kW charging station worth it even if my vehicle charges at only 11kW?

Yes, if you have a suitable three-phase connection. The charging station will charge your current vehicle at 11kW, and will also suit your next vehicle if it supports 22kW. In a home with two vehicles, it allows flexibility in distributing power.

Which 22kW charging station is suitable for an apartment building or a business?

For buildings, parking facilities and businesses, a managed charging station is suitable, such as the DSG-6012 (22kW, Wi-Fi/LAN/4G, RFID and app), which connects to a cloud management system via OCPP and enables load management, permissions and billing per user.

Want to check whether a 22kW charging station is right for you? leave your details or call: 077-9920350. You can also choose a charging station in theCharging stations and accessories.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 