Two electric cars at home? A dual charging station or two separate stations (the complete guide)

Adding a second electric vehicle feels natural, until you realize that two batteries have to share the same home electrical infrastructure. So what is the right solution? A dual charging station, or perhaps two separate stations? In this guide we explain how smart load management lets you charge two vehicles simultaneously without upgrading your entire electrical system, and what you must check before choosing and installing.

Two electric cars at home? A dual charging station or two separate stations (the complete guide)

Adding a second electric vehicle to the family is a logical decision. The convenience, savings and peace of mind are already familiar from the first vehicle. But then comes the logistical question: how do you charge two electric vehicles in one home, with one electrical connection, without turning every evening into a complex coordination game between the water heater, the air conditioner and the cars?

The common mistake is thinking in terms of “adding another socket”. In practice, adding a second charging station without planning is a sure recipe for overloading the electrical panel and, in the worst case, tripping the breaker just when you need the vehicle charged in the morning. The real question is not whether to install a Dual EV charging station or two separate stations, but how to plan a charging system that works in harmony with the whole home.

The solution lies not only in the hardware, but in smart system planning. In this guide we explain the options, break down the most important concept – load management – and present the checks you must carry out before making a decision.

To compare models and prices, see Home charging stations andDual charging stations in our store.

The real challenge: not two vehicles, but one electrical infrastructure

Before choosing a charging station model, it is important to understand the main limitation: the home's electrical capacity. Every home in Israel has an electrical connection of a defined size (for example, 25×3 amp three-phase). This capacity has to be enough for all the electrical consumers in the home: air conditioners, oven, water heater, washing machine, and now two electric vehicles too.

EV charging of one vehicle at a standard home charging station (11kW) requires about 16 amps – equivalent to running several air conditioners at once. Charging two vehicles simultaneously, without management, may require 32 amps or more – a figure most private homes simply cannot supply together with ongoing household consumption.

This is exactly where the challenge lies: how to divide the limited electrical resource between two vehicles that both need charging, usually at the same hours (evening and night), without causing the system to collapse. The solution requires more than just another Charging station installation ; it requires a system that knows how to manage itself.

The smart solution: how dynamic load management (DLM) prevents tripped breakers

If there is one technical concept every owner of two electric vehicles should know, it is Load management (Dynamic Load Management – DLM). This is the technology that turns charging two vehicles from a complex task into a simple, automatic operation.

How does it work in practice?

A DLM system measures the home's total electricity consumption in real time. It “knows” how much power the air conditioner, oven and water heater are consuming at any given moment. The system intelligently divides the remaining available power between the vehicles' charging stations.

For example:

  • During busy evening hours: When the air conditioners are running and dinner is cooking in the oven, household electricity consumption is high. The DLM system will detect this and allocate less power to the vehicles. Charging will be slower, but stable, and will not cause an overload.
  • Late at night: When the house “goes to sleep” and electricity consumption drops, the system detects the available power and automatically increases the vehicles' charging rate, to make sure both are ready in the morning.

The main advantage is that the system avoids the need for an expensive upgrade of the home's main electrical connection (a connection upgrade). It makes optimal use of the existing infrastructure, saves headaches and ensures that charging is always safe and efficient. This is the professional approach of DSGCharge: not just selling a product, but building a solution that works for your specific home.

A dual charging station or two smart charging stations? It's a planning question, not just a product question

Once you understand that load management is the key, you can examine the two common physical configurations:

1. A dual EV charging station

This is one physical unit containing two charging sockets or two cables. All components (including the load management system) are concentrated in one enclosure.

  • Advantages: A clean, compact installation, ideal for two adjacent parking spaces. Often a more aesthetic solution and simpler to operate.
  • Disadvantages: Less flexibility in location. If the parking spaces are not adjacent or there is a physical obstacle between them, the solution becomes cumbersome.

2. Two linked smart charging stations

In this configuration, you install two separate Charging stations , which “talk” to each other and to the load management controller. They operate as one coordinated system.

  • Advantages: Maximum flexibility in location. Each station can be installed in the optimal location for its parking space, even if they are far apart. Allows modular planning – you can start with one station and add the second in the future relatively easily.
  • Disadvantages: The installation may be somewhat more complex in terms of wiring, and requires professional planning to ensure stable communication between the stations.

So which is better? The answer depends on the parking layout, the budget and personal preferences. There is no absolutely “better” solution – only a solution that better suits your specific situation.

What must you check before installing? The checklist that will save you mistakes

Before buying equipment, carrying out a few preliminary checks will ensure that the chosen solution really suits you and prevent costly surprises later. Such a project does not start with buying a product, but with a professional assessment.

  1. Professional electrical infrastructure check: The first and most important step. Call in a certified electrician to check the size of the home's main connection (whether it is single-phase or three-phase), the condition of the electrical panel, and the existing load at peak hours. Only after this check can you know the maximum power that can be safely allocated to vehicle charging.
  2. Examining the physical location: Where exactly are the parking spaces located relative to the electrical panel? A long distance from the panel makes installation more expensive and requires thicker wiring. Are the parking spaces adjacent? Is there a convenient wall for installation, or is a dedicated pedestal needed? Planning the cable route is a critical part of the project.
  3. Assessing usage habits: Do both vehicles come home every evening with a nearly empty battery and need a full charge? Or does one of them drive short distances and need only a light top-up? Understanding your driving and charging patterns will help match the system's power and load management settings to your real needs.
  4. Planning for the future: Are you planning to replace one of the vehicles with a model with a larger battery in the future? Is there a chance a third vehicle will join the family? Planning the infrastructure correctly today can save complex and expensive work tomorrow.

At DSGCharge, we believe that proper planning is the foundation of a successful charging solution. We don't just sell EV charging station, but accompany the customer from the assessment stage, through choosing the right equipment (whether a dual charging station, two separate stations, or Charging cables and accessories), to professional and safe installation.

The first step is not choosing a product, but understanding the full picture. If you are planning to charge two electric vehicles at home, we invite you to a consultation and fitting call with our experts. Together we will check the infrastructure, understand your needs, and build a charging solution that works for you – no surprises and no headaches.

Frequently asked questions

Do you have to upgrade the main electrical connection to charge two vehicles at home?

Not always. In most cases, using a smart charging system with dynamic load management (DLM) makes efficient use of the existing infrastructure and lets you charge two vehicles simultaneously without exceeding the home's electrical limit. However, an infrastructure check by a certified electrician is required to confirm this.

Which is better: a dual charging station or two separate stations?

The choice depends mainly on the parking layout and the flexibility required. Dual station is an excellent and aesthetic solution for two adjacent parking spaces. Two separate, linked stations offer more flexibility if the parking spaces are far apart or if a modular installation is needed.

Can you install one station now and prepare for the second vehicle in the future?

Absolutely, and it is a smart, cost-effective move. If you know that another electric vehicle will join in the future, it is recommended to plan the infrastructure now (such as wiring and space in the electrical panel) so that adding the second station later will be simpler, faster and cheaper.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 