Charging stations for businesses: planning, management and billing – the complete guide (2026)

A comprehensive guide for businesses, fleet managers and parking facility owners on setting up EV charging. We review the differences between AC and DC stations, the importance of load management, integrating payment systems, and how to build infrastructure that fits future growth in the electric vehicle market in Israel.
Setting up charging stations for businesses: the complete guide for fleet managers, shopping centers and parking owners

Charging stations for businesses are no longer just a nice perk for employees. In a business with company cars, employees who arrive in an electric vehicle, or customers who park for an hour or more, a charging point in the parking lot saves time, money and dependence on public charging stations. This guide explains how to plan charging stations for a business according to its size and type of users, how many stations to install, what is needed on the electrical side, how to manage permissions and billing, and when AC is preferable and when DC.

In short: Most businesses do fine with 11–22kW AC stations, because vehicles stay parked for hours. Start by checking the available capacity on the connection, decide who charges (employees, company cars, customers) and who pays, and choose stations that can be managed remotely and expanded. DC is suitable only when vehicles need to charge in less than an hour.

The models and prices of Public charging stations and managed charging stations for businesses are available in our store.

Who are charging stations for businesses suitable for?

Three types of users determine the planning, and most businesses have more than one of them:

  • Company cars and vehicle fleets: The vehicles belong to the business, and electricity is a business expense. It is important to know which vehicle charged, how much and when, in order to control costs.
  • Employees with a private car or company car: They park for a full workday. You need to decide whether charging is a benefit, whether the employee pays, and how to allocate stations when there are more vehicles than stations.
  • Customers and visitors: They come for a limited time and expect simple charging with clear payment. A station open to the public is also subject to the Electricity Authority's regulatory rules.

A common mistake in small businesses is installing one station “for everyone”. After a few weeks it turns out that an employee is plugged into it from morning to evening, and a customer who wanted to charge couldn't find a spot. The decision about who uses the station and when should be made before installation, not after.

Charging stations for offices: how is it different from a business that serves customers?

In an office, employees park for 8–9 hours straight, so AC stations of 7.4kW to 22kW are enough to replenish each vehicle's daily driving. DC fast charging stations are needed in an office only when there are fleet vehicles that return to the parking lot and need to head out again within an hour or two.

What determines the success of an office project is management, not the number of stations:

  • Permissions: Only authorized employees charge – with an RFID card or app, with separation between employees, fleet vehicles and guests.
  • Load management: The available capacity on the building's connection is automatically divided among the connected vehicles, so you can install more stations without upgrading the connection. The full explanation is in theLoad management for charging stations.
  • Billing policy: Free charging as an employee benefit, billing per kWh, or a monthly quota per employee – with a report by employee or department.
  • Fleet vehicles: When some of the vehicles are company cars, it is worth connecting the stations to the EV fleet managementsystem, including expense reimbursement for charging at the employee's home.
Office situation Suitable station Price (as of October 2026)
Several employees, permissions and reports needed Managed charging station DSG-6012 (22kW) ₪3,290
Two vehicles on one pole Dual charging station DSG-3012 (2 × 22kW) ₪6,490
Parking facility shared by several companies, managed via OCPP in the cloud DSG-6052 / DSG-6112 ₪6,990 / ₪7,990

How to plan charging stations for offices, step by step

  1. Count: How many employees arrive in an electric vehicle today, and how many are expected to switch to electric in the next two to three years (including company cars and leasing).
  2. Electrical check: A check of the connection size and the available capacity in the parking lot panel – this determines how many stations can run simultaneously with load management.
  3. Policy: Free charging as a benefit, billing by consumption or a monthly quota – and who gets priority (fleet vehicles, managers, shift workers).
  4. Phased installation: Install the required number of stations now, and prepare infrastructure (cabling and conduits) for future expansion without opening up the parking lot again.
  5. Cloud management: Stations that support OCPP let you manage permissions, reports and billing from one place – the explanation is in theManaged charging station: what is OCPP.

How many charging stations does a business need?

You don't plan by the number of parking spaces, but by the number of electric vehicles, the dwell time and how much energy each vehicle needs per day. A vehicle that drives 60–80 km a day needs roughly 10–15 kWh, and at a 7–11kW AC station it replenishes that in an hour or two. So one station can serve several vehicles a day, if there is order.

Business size Typical situation Recommended starting solution
Self-employed or a business with 1–3 vehicles Vehicles return in the evening and charge overnight, or park near the business during the day One or two 7–11kW smart charging stations, with an app or RFID for identification. No complex payment processing
Small to medium business with 4–15 vehicles Employees and company cars park for a workday 22kW dual AC stations with load management, per-user permissions and consumption reports
Offices, a factory or a campus with dozens of vehicles More vehicles than stations, arrivals at similar times A system of managed stations via OCPP: permission groups, queues, prioritization, billing by employee or department
A business with customers (hotel, mall, restaurant) Occasional customers, from an hour to overnight Public charging stations with payment processing, and for short stays DC as well

Rule of thumb for businesses with employees: you can start with one station for every 3–5 electric vehicles, provided there is permission and queue management, and add stations as usage grows. It is important to prepare infrastructure (conduits, space in the panel) for the next phase already in the first installation.

AC or DC: which station suits a business?

At an AC station, power is limited by the charger inside the vehicle – 7.4–11kW in most vehicles and 22kW in some. That is entirely sufficient when a vehicle is parked for several hours. A DC station converts the power inside the station and reaches tens and hundreds of kilowatts, but requires a large electrical connection and a much higher investment.

  • AC is suitable for employee parking, company cars that charge overnight, hotels and offices. This is the solution for most businesses.
  • DC is suitable for fleets working in shifts that have no time to wait, for fuel stations, and for places where customers stay less than an hour. Full details, including the electrical connection required for each power level, are in the guide DC fast charging station for businesses.

To compare power levels and charging times, you can use theCharging time calculator and the guide AC or DC charging station.

What is needed electrically?

The first step in any project is checking the available capacity on the existing connection, not just the connection size. A business has air conditioning, machinery, lighting and elevators, and sometimes less remains than you think. For illustration: a 3X40 amp connection is about 27.7 kVA, a 3X63 connection about 43.6 kVA, and a 3X80 connection about 55.4 kVA (calculated at 400V). A 22kW dual charging station at full power consumes 44kW.

This is where Load management for charging stations: the system divides the available power among the connected vehicles and takes the business's other consumers into account, so you can connect more stations without immediately upgrading the connection. If a connection upgrade is still needed, check it early, because it depends on the IEC's approval and work.

The installation is carried out by an electrician with the appropriate license and in accordance with the Electricity Administration guidelines (11/2025), including a suitable RCD and periodic inspections. The requirements are detailed in the guide Guidelines for installing an EV charging station.

How do you manage permissions, queues and prioritization among employees?

When there are more vehicles than stations, without clear rules, fights over spots break out. A charging management system solves this with several tools:

  • Permissions by user or group: Only authorized users can activate the station, via the app or an RFID card. You can define groups such as management, service vehicles, employees and guests.
  • Prioritization: Service vehicles that go out into the field get priority in power or time.
  • Time limit and queue: A notification to the employee when the vehicle has finished charging, so they free up the spot for the next in line.
  • Reports: Consumption by employee, vehicle or department, for monitoring and billing.

All of DSGCharge's public charging stations are managed via the OCPP protocol from a cloud computing system, so you can manage permissions, pricing and reports remotely and connect additional stations later. For a business with a vehicle fleet, see also EV fleet management, including vehicle identification by license plate and a home charging expense reimbursement report for the employee.

Who pays for the electricity? Billing and payment in a business

There are three main approaches, and they can be combined:

  1. The business pays: Suitable for company cars, or when charging is an employee benefit. The management system provides a consumption report for monitoring.
  2. The employee pays: Billing per kWh at a rate set by the business, via payroll deduction or payment in the app.
  3. Customers pay: A station open to the public with payment via app, card or credit card. The business sets the price and can turn the station into a source of income.

Payment processing and billing are run by the DSGCharge operations system: an app, credit card payment terminals at the station, RFID cards and per-user permissions. Full details on the page Charging station operations system. It is also worth checking the business's electricity tariff: with a time-of-use tariff, charging during off-peak hours and on weekends is cheaper, and a management system can schedule charging accordingly.

A station open to customers: what does regulation require?

If the station is open to the public, the Electricity Authority's rules for public charging stations apply to it (Decision 73006, in effect from 26.7.2026): price display, a payment option for occasional customers, and for stations above 50kW a credit card payment terminal. The obligations apply to the station operator. A station intended for the business's employees only and not open to the public is exempt from these rules (as of 10/2026). Full explanation on the page Charging stations for parking facilities.

A business that wants to offer charging to customers without investing or operating can choose a partnership model: the site owner provides the space and infrastructure, and DSGCharge sets up, manages and maintains the stations, with revenue sharing depending on the location and subject to a feasibility check. Details on the page Setting up public charging stations.

Which stations suit a business?

Common mistakes when planning charging stations in a business

  1. One station for employees and customers without rules. The first employee to arrive takes it for the whole day.
  2. Installing without checking available capacity. The stations overload the connection at peak times, or a need to upgrade the connection is discovered in the middle of the project.
  3. Stations that can't be managed. Without user identification there is no control over who charges, and no report for billing.
  4. DC in a place where vehicles park all day. A high investment with no benefit for the employee.
  5. Not preparing infrastructure for expansion. Every additional station requires digging and panel changes again.

Why DSGCharge?

DSGCharge, part of S.M.C. Dor HaAtid, has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own: AC stations up to 22kW including dual stations, and DC fast and ultra-fast charging stations up to 480kW. About 20,000 chargers and charging stations sold and installed, and installation and service are provided nationwide by dozens of teams. As the importer, we supply the equipment, installation, management system and maintenance from a single source.

How to get started?

  1. Tell us about your business: How many electric vehicles you have today and will have in a year, who charges (employees, fleet, customers) and the connection size.
  2. Infrastructure check: Available capacity, distance from the panel and station locations.
  3. Planning: Number of stations for the first phase, load management, permissions and billing.
  4. Installation and activation: Connection to the management system and training for the administrator.

Leave your details to plan charging stations for your business and we will get back to you.

Frequently asked questions

How many charging stations does a business with employees need?

You can start with one station for every 3–5 electric vehicles, provided there is permission and queue management, because a vehicle parked for a workday needs only an hour or two of AC charging. Add stations as usage grows, and prepare infrastructure for expansion already in the first installation.

Does a business need a DC station, or is an AC station enough?

For most businesses an 11–22kW AC station is enough, because the vehicles stay parked for hours. DC is suitable for fleets working in shifts, fuel stations and places where customers stay less than an hour.

How do you bill employees for charging at work?

A management system identifies each employee via the app or an RFID card and generates a consumption report per employee. The business can fund charging as a benefit, bill per kWh at a rate it sets, or combine the two.

Does a station for employees only have to comply with the Electricity Authority's rules for public charging stations?

A station intended for the site's employees and not open to the public is exempt from the regulatory rules for public charging stations. A station open to customers is subject to them (as of 10/2026).

What do you do if there isn't enough capacity on the business's electrical connection?

Start with load management, which divides the available power among the vehicles and takes the other consumers into account. If that is not enough, submit a connection upgrade request to the IEC – and it is worth doing so early.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar