In short: A home charging station needs 16 to 32 amps per phase, depending on the power: 16A single-phase gives about 3.7kW, 32A single-phase about 7.4kW, 3x16A about 11kW and 3x32A about 22kW. With a residential 1×40 or 3×25 connection, load management or a current limit is recommended, and a 22kW station at full power suits a 3×40 connection.
Updated: November 2026
This is one of the most common questions before installation: how many amps does a charging station need, and is the home's electrical connection enough? The answer depends on three factors: the home's connection size (for example 1×40 or 3×25), the power the vehicle can accept when AC charging, and how much electricity the home consumes during those hours. This guide explains how to calculate, what suits each connection and when it is worth considering a connection upgrade.
How many amps does a charging station need, by charging power?
Current (amps) and power (kW) are related through voltage. On single-phase, power is roughly 230 volts times the current, and on three-phase roughly 690 volts times the current per phase. That is why the same 32A station gives about 7.4kW on single-phase and about 22kW on three-phase.
Short definition: kW is power, meaning the charging rate at a given moment. kWh (kWh) is the amount of energy that goes into the battery. Amps is the current the station draws from the panel, and it is what determines whether the home's connection can handle the load.
| Station connection | Current per phase | Charging power (approx.) | Estimated time for 42 kWh* |
|---|---|---|---|
| Single-phase | 16A | 3.7kW | About 11.5 hours |
| Single-phase | 32A | 7.4kW | About 5.7 hours |
| Three-phase | 3x16A | 11kW | About 3.8 hours |
| Three-phase | 3x32A | 22kW | About 1.9 hours (only in a vehicle that accepts 22kW AC) |
*42 kWh is roughly a charge from 10% to 80% on a 60 kWh battery. The calculation is energy divided by power, without losses, so in practice the time is a little longer. As of November 2026. A full table by battery and power is in the guide How long does it take to charge an EV at home.
What electrical connection do I have at home, and how do I check?
A residential connection in Israel is written as the number of phases times the amps per phase, for example 1×40 (single-phase 40 amps) or 3×25 (three-phase 25 amps per phase). You can see the connection size on your electricity bill, on the second page, in the line “Payment for KVA capacity”.
According to the Electricity Authority tariff book (July 2026 update, via TheMarker's guide of 30.9.2026), these are the capacities of the common connections:
| Connection size | Connection capacity | Suitable station (without a connection upgrade) |
|---|---|---|
| 1×40 (single-phase) | 9.24 kVA | Up to 7.4kW, with load management or a current limit |
| 3×25 (three-phase) | 17.32 kVA | 11kW, or 22kW with a current limit |
| 3×40 (three-phase) | 27.71 kVA | 22kW, preferably with load management |
As of November 2026. The final decision on the current is made by the electrician after checking the panel and the actual consumption.
How many amps are left for the home after connecting a charging station?
Whatever the station draws is subtracted from what is left for the rest of the home. On a 1×40 connection, a 7.4kW station draws 32A, leaving only about 8A for the home – meaning an air conditioner and an oven together may trip the main circuit breaker. On a 3×25 connection, an 11kW station draws 16A per phase, leaving about 9A per phase.
On a 3×40 connection, a 22kW station draws 32A per phase and leaves about 8A per phase. That is why load management is recommended even on a large connection: it automatically lowers the charging current when the home consumes more and restores it when consumption drops.
Short definition: Load management is a system that measures the home's consumption in real time and adjusts the charging current to it, so that the total does not exceed the connection size. Details are in the guide Load management for charging stations.
Is a 22kW station suitable for a 3×25 connection?
A 22kW station needs 32A per phase, more than the 25A available on a 3×25 connection. So it can be installed only when it is configured for a lower current or with load management, and then in practice it charges at less than 22kW.
According to the Electricity Administration guidelines (25.11.2025), the charging power is limited to the rated current of the protective device protecting the circuit. That is, if the circuit is protected at 20A, the station is configured to 20A at most. If you want a full 22kW, first check that the vehicle actually accepts 22kW when AC charging. In many vehicles the ceiling is lower, and then an 11kW station is enough. The full comparison is in the guide 11kW or 22kW charging station.
Single-phase or three-phase: which is better for a home charging station?
On single-phase, a home charging station is effectively limited to 7.4kW at most, because it draws up to 32A from one phase. On three-phase, the same current is split across three phases, so you can reach 11kW or 22kW without overloading a single phase.
For most drivers who charge overnight, 7.4kW or 11kW is enough to start every morning with a full battery. The differences in charging times and when it is worth switching to three-phase are explained in the guide Single-phase or three-phase charging station.
When do you need to upgrade the electrical connection, and how much does it cost?
A connection upgrade is needed when, even with load management, there is not enough current to charge at the rate you need, or when you want to switch from single-phase to three-phase. According to the Electricity Authority tariff book (July 2026), the payment to the IEC is ₪1,019.38 plus ₪181.44 for each additional kVA, before VAT, multiplied by a coefficient based on the number of apartments in the order.
For example, according to the calculation in TheMarker's guide (30.9.2026), upgrading an apartment from 1×25 to 3×25 costs about ₪3,115 before VAT, not including the electrician's work. For upgrades up to 3×40 there is a fast track of up to 30 business days. Before upgrading, check whether load management solves the problem at a lower cost. The comparison is in the guide Upgrading the electrical connection to 40 amps vs. load management.
Which DSGCharge station suits each connection?
DSGCharge sells and installs home, smart and managed charging stations, and the electrical connection of each station is listed on the product page. The prices in the table are store prices, and the stations are configured during installation to the current that suits your connection.
| Model | Power and connection | Suitable for | Store price |
|---|---|---|---|
| DSG-1061 Smart station | 11kW, three-phase 16 amps | 3×25 connection and above | ₪1,590 (instead of ₪2,190) |
| DSG-1062 Smart station | 22kW, three-phase 32 amps | 3×40 connection, or 3×25 with a current limit | ₪1,790 (instead of ₪2,390) |
| DSG-1072 Smart charging station with Wi-Fi | 22kW, three-phase 32 amps | Like DSG-1062, with Wi-Fi control | ₪2,390 |
| DSG-6012 Managed station | 22kW, three-phase 32 amps, OCPP | Apartment building, parking facility or business with load management | ₪3,290 |
| DSG-350 Granny cable | Up to 3.7kW, household plug, adjustable amps | Occasional charging from a household outlet | ₪699 (instead of ₪990) |
| DSG-9903 Installation up to 20 meters | Cable up to 20 meters in an external conduit, ₪69 per additional meter | Standard installation | ₪2,590 |
As of November 2026. All stations have built-in residual current protection, a 24-month on-site warranty, and the products are approved by the Standards Institution of Israel (SII). All models are shown on the page Home charging stations.
In an apartment building with several electric vehicles, the right choice is a managed charging station with shared load management for the entire parking garage, so that not every resident needs to upgrade their connection. The explanation is in the guide OCPP managed stations.
What does the electrician need to check before setting the current?
According to the Electricity Administration guidelines for installing an electric vehicle charging system (25.11.2025), the station is installed by an electrician, supplied by a circuit dedicated to charging only with suitable protection, and inspected by an inspecting electrician before first use. All the sections are explained in the guide Charging station installation guidelines.
- The connection size on the electricity bill and on the main circuit breaker.
- The home's consumption in the evening hours, when charging usually takes place.
- The AC charging power the vehicle accepts, per the owner's manual.
- The distance from the panel to the parking space and free space in the panel for a new circuit.
- Whether there is another electric vehicle in the home or planned, and therefore a need for load management.
If the home shares a meter with another unit and you want to split it, DSGCharge also offers Separate connection from the IEC meter (DSG-9907).
Why choose DSGCharge for a home charging station?
DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and installation and service are provided nationwide.
BeyondHome EV charging station, DSGCharge builds and manages charging systems for apartment buildings, parking facilities, businesses and vehicle fleets, including load management and billing by TOU meter. Details on theEV charging station installation process are on the installations page.
Want a tailored quote?
Send us the connection size from your electricity bill and your vehicle model, and the DSGCharge team will recommend a station and current setting that suit your home. to leave your details, for an initial estimate with theinstallation cost calculator, or by phone at 077-9920350.
Frequently asked questions
How many amps does a home charging station need?
16 to 32 amps per phase, depending on the power: 16A single-phase for about 3.7kW, 32A single-phase for about 7.4kW, 3x16A for about 11kW and 3x32A for about 22kW. The electrician sets the current according to the connection size and the circuit's protective device.
Is a 1×40 connection enough for a charging station?
Yes, for a station of up to 7.4kW, but it draws 32A and leaves only about 8A for the home. That is why load management or a charging current limit is recommended on a 1×40 connection.
Can a 22kW station be installed on a 3×25 connection?
Yes, only with a current limit or with load management, because a 22kW station needs 32A per phase. In practice it will charge at less than 22kW. For a full 22kW, a 3×40 connection is suitable.
How do you know your home's electrical connection size?
On your electricity bill, on the second page, in the line Payment for KVA capacity. The connection is written as the number of phases times amps, for example 1×40 or 3×25.
How much does an 11kW or 22kW charging station cost?
In the DSGCharge store, as of November 2026: the 11kW DSG-1061 at ₪1,590 and the 22kW DSG-1062 at ₪1,790, for the station only. A standard installation up to 20 meters (DSG-9903) costs ₪2,590.