A guide for kibbutz managements, local committees and regional councils: internal electricity grid, load management, managed charging stations and per-user billing, the rules of decision 73006 and a partnership model for public charging stations in the community.

In short: Charging stations on a kibbutz or moshav are planned according to who holds the electricity grid: on a kibbutz that distributes electricity over an internal grid, the connection and billing go through the kibbutz, and on a farm with its own meter the installation is similar to a private house. For a shared neighborhood, managed 22kW charging stations with load management and per-user billing are suitable, and in a commercial center open to the public the Electricity Authority's rules apply.

Updated: November 2026

This guide is intended for kibbutz managements, local committees, cooperative associations and regional councils planning charging stations for members, residents, local businesses or visitors. It answers the questions that come up in every such project: who connects, how many stations are possible without upgrading the connection, how each user is billed, and what the regulations require.

What's different about charging stations on a kibbutz compared with a building in the city?

The main difference is the electricity grid. On most kibbutzim, electricity is purchased centrally and distributed to members, residents, public buildings and businesses over the kibbutz's internal grid, and responsibility for this grid lies with the kibbutz.

What this means for charging stations: before installing stations, you need to check the capacity of the internal grid and of the transformer that supplies the neighborhood, not just the house's connection. When many members plug in their vehicles during the same evening hours, the load accumulates on the same grid. That's why on a kibbutz, load management isn't an add-on but part of the planning.

Regulatory background: according to Electricity Authority decision 63210 (19.5.2022), as summarized in a professional circular for kibbutzim, a kibbutz that distributes electricity can transfer its distribution grid to the Israel Electric Corporation (IEC). So before planning, it's worth finding out who operates the grid in the community today: the kibbutz, a distribution company of the kibbutz or the IEC.

Who connects the charging stations to the electricity on a kibbutz or moshav?

It depends on who supplies electricity to the point where you want the station. When the farm or house is connected to the IEC with its own meter, the installation is identical to installation in a private house. When the supply goes through the grid of the kibbutz or the association, the connection is coordinated with whoever operates the grid.

Electricity situation at the site Whom to coordinate with What to check before installation
A house or farm with its own IEC meter The homeowner, as in a private house Connection size, single-phase or three-phase, distance from the panel to the parking space
A kibbutz member's house on an internal grid The kibbutz management or its distribution company Capacity of the grid and the transformer in the neighborhood, a meter for each station, billing method
Common parking in the neighborhood or near public buildings The kibbutz management or the local committee Number of parking spaces, load management, who pays for the infrastructure
A commercial center, visitor parking or an industrial zone in the community The site owner and the operator Dedicated connection, type of stations, the Electricity Authority's rules for a public charging station

In all cases, according to the Electricity Administration's guidelines for installing an electric vehicle charging system (25.11.2025), installation is carried out by an electrician, and the charging system is inspected by an inspecting electrician before commissioning. Details in the guide Charging station installation guidelines.

Which type of charging station suits each location in the community?

No single station suits the whole community. In a private house a home charging station is enough, common parking needs managed charging stations, and a place open to the public needs public charging stations with cloud management. As of November 2026, these are the suitable models from the DSGCharge store:

Model Power and type Suitable for Store price
Smart charging station DSG-1061 11kW, three-phase Private house or farm ₪1,590 (instead of ₪2,190)
Smart charging station DSG-1062 22kW, three-phase Private house or farm with a vehicle that accepts 22kW ₪1,790 (instead of ₪2,390)
Managed charging station DSG-6012 22kW, managed (Wi-Fi, LAN, 4G, RFID, app) Common parking in the neighborhood, load management and per-user billing ₪3,290
Dual public station DSG-6052 2x22kW, managed via OCPP Visitor parking, public buildings, commercial center ₪6,990
Dual free-standing public station DSG-6112 2x22kW, managed via OCPP Open parking lot with no wall for mounting ₪7,990 (instead of ₪9,900)
Public DC charging station DSG-5240 40kW, DC A commercial center or junction where people stop for a short time ₪24,900

The installation price is separate from the station price. A standard installation in a private house with up to 20 meters of cable (DSG-9903) costs ₪2,590 in the store. All the station models are in the category EV charging stations.

How many charging stations can be installed without upgrading the electrical connection?

You can install more stations than you might think, provided there's load management. Load management is a system that distributes the available power among the connected vehicles in real time, so the stations don't exceed the connection limit, even when everyone is charging together.

Example: 10 stations of 22kW are 220kW in theory, but in practice most vehicles in the neighborhood charge at night, over several hours, and don't need full power at the same moment. The system lowers the power for each vehicle when the load rises and raises it when the load drops. The decision on how many stations to install is made after checking the grid and the transformer, not based on an estimate. The full explanation is in the guide Load management for charging stations.

How do you bill each member or resident for charging?

In common parking, every charging session needs to be attributed to a user. With managed charging stations, each user is identified by a smart card or the app, and the system records how many kWh (kilowatt-hours, the unit of energy charged) each person charged and when.

In the DSGCharge managed system, the company reads the meter, bills each user according to their consumption and transfers the money to the managing body, just as it works in managed buildings. On a kibbutz this can be the kibbutz or the association, instead of the building committee. When the electricity price is on the TOU tariff (a seasonal tariff by the hour, in which nights and weekends are cheaper), the billing can reflect the charging hours. Service fees for a managed charging station: ₪35 per month and 20 agorot per kWh. The full explanation is in the guide Monthly charging report.

Do the Electricity Authority's rules for public charging stations apply to a kibbutz?

It depends on whom the station is open to. Electricity Authority decision 73006 (31.12.2025, in effect from 26.7.2026) sets rules for public charging stations, and according to its explanatory notes it doesn't apply to private places, including apartment buildings.

  • A station in a commercial center, visitor parking or at the entrance to the community that's open to every driver: the rules apply, for example price display. At a fast charging station (above 50kW and up to 150kW), a credit card payment terminal is required at new stations from 1.1.2027 and at all stations from 1.1.2028.
  • Slow station (up to 50kW): No payment terminal requirement, but the price must still be displayed.
  • Stations in parking for kibbutz members only: closer to a private place. If the stations are also open to guests or outside workers, it's worth checking the classification with a consultant.

About the decision and the payment terminal, see the guide Credit card payment terminal for a charging station.

Can public charging stations be set up in the community without investment?

Yes, in a partnership model. When the community has a location with traffic, such as a commercial center, a tourist attraction, a dining hall open to visitors or a main junction, DSGCharge can set up, manage and maintain the stations. No financial investment on your part; the revenue split is determined by the location and is subject to a feasibility check.

The public charging stations are managed via OCPP, an open protocol for communication between the station and a cloud management system. The operating system was developed by DSGCharge and includes an app, pricing, payment processing, reports and fault monitoring, and it can be customized and branded to the customer's requirements (White Label). Details on the page Setting up public charging stations.

What about a regional council, a factory or a vehicle fleet in the community?

A regional council can act like a local authority: purchase stations for public buildings and parking facilities, issue a tender or work in a partnership model. The models, tender clauses and regulations are detailed in the guide Charging stations for local authorities.

A kibbutz factory or a community vehicle fleet is suited to a workplace charging solution, with vehicle identification, reports for each vehicle and reimbursement of home charging expenses to the employee. Details on the page EV fleet management.

How do you start a charging station project on a kibbutz or moshav?

  1. Mapping the need: how many electric vehicles are in the community today, how many are expected, and where they park.
  2. Checking the electricity situation: who operates the grid, what the capacity is in each neighborhood, and whether there are separate meters.
  3. Site survey: panels, distances, transformers and connection points.
  4. Planning: Type of stations for each location, load management and billing method.
  5. Deciding on a model: the community purchases and pays for the infrastructure, or a partnership model in the public locations.
  6. Installation, inspection by an inspecting electrician and commissioning, followed by ongoing management and a monthly report.

Why work with DSGCharge?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations sold and installed, and installation and service are provided nationwide. The products have Standards Institution of Israel (SII) approvals.

For a kibbutz or moshav, this means one address for the whole community: home charging stations for members, Managed charging stations in apartment buildings in the neighborhoods, public charging stations for visitors, load management, per-user billing and a cloud management system.

Want a tailored quote?

Tell us how many electric vehicles are in the community, where they park and who operates the electricity grid, and the DSGCharge team will plan the stations, load management and billing method. to leave your details, for an initial estimate with theinstallation cost calculator, or by phone at 077-9920350.

Frequently asked questions

Who approves installing a charging station in a kibbutz member's house?

When the house receives electricity from the kibbutz's internal grid, the installation is coordinated with the kibbutz management or its distribution company, because they're responsible for the grid. When the house has its own IEC meter, the installation is identical to a private house.

Which station suits common parking in a kibbutz neighborhood?

A managed charging station, such as the DSG-6012 (22kW, ₪3,290 in the store, as of November 2026), with load management and user identification by card or app, to distribute the power and bill each user according to their consumption.

How do you bill each member for charging?

In a managed system, every charging session is attributed to a user. DSGCharge reads the meter, bills each user according to consumption and transfers the money to the managing body, for example the kibbutz or the association.

Does Electricity Authority decision 73006 apply to charging stations on a kibbutz?

It applies to public charging stations, for example in a commercial center open to every driver. According to the explanatory notes, it doesn't apply to private places, including apartment buildings. Stations that are also open to guests should be checked with a consultant.

Can public charging stations be set up in the community without investment?

Yes, in a DSGCharge partnership model at locations with traffic. No financial investment on the community's part; the revenue split is determined by the location and is subject to a feasibility check.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar