Updated: November 2026
Charging station testing is part of every installation and every maintenance visit for an AC station, whether in a private home, an apartment building or a business parking facility. Anyone who installs or maintains stations needs to know what to test, when and with which instrument. This guide is for electricians and installers, as well as station owners, building committees and parking facility managers who want to understand what the electrician is supposed to check.
If you're choosing a new station for your home, building or parking facility, you can compare all the models on the EV charging stations in the DSGCharge store.
What does charging station testing include?
Charging station testing includes three parts: testing the electrical installation that supplies the station, functional testing of the station itself against a simulated “vehicle,” and in some cases measuring power quality and loads in the panel. The first part is set by regulation, the second verifies that the station actually communicates with a vehicle and disconnects when it should, and the third is important mainly in buildings and parking facilities with several stations.
- The installation: Panel protections, the supply route, earthing and its continuity, the RCD and DC leakage current detection.
- The station: Transitions between charging states, response to communication and earthing faults, correct cable detection.
- The grid: Voltage, current, harmonics, phase imbalance and load during charging.
What do the Electricity Administration guidelines require in the pre-operation inspection?
Section 15 of the Electricity Administration's “Guidelines for Installing an EV Charging System” (published on 25.11.2025) states that a charging system is inspected before its first operation and after every fundamental change, by an inspecting electrician holding a suitable license. The guidelines define a fundamental change as replacing the charger model, a change in the means of protection against electric shock, or a change in the supply circuit or cable cross-section.
The inspection covers 12 topics:
- Accredited laboratory approvals for the equipment and compliance with the standard.
- Compliance with the electricity regulations and the guidelines.
- The protective devices in the supply panel.
- The supply route to the station.
- Stable installation, mechanical protection and signage.
- The earthing system, including a local electrode if there is one.
- Earthing continuity up to the connection point.
- Protection against electric shock.
- RCD and DC leakage current detection.
- Overvoltage protection in stations for public use.
- Measurements at the vehicle connection points or at the station terminals, including proper operation of the protections.
- Testing vehicle-to-grid supply capability (V2X), if present.
The results are documented in an inspection report using the form published by the Electricity Administration, and the installer hands it over to the system owner (sections 15(b) and 17). A full explanation of all sections of the guidelines is in the guide Charging station installation guidelines.
Which RCD should be tested in a charging station?
Under section 6 of the guidelines, every AC connection point is protected by a dedicated RCD that trips at a residual current above 30mA. The RCD must be Type B, or Type A or F together with a means of detecting DC leakage current. The detection device can be built into the station, attached to it or in the panel.
During the inspection, it is important to verify which solution is actually in place. A station with a built-in DC detector and a Type A RCD in the panel is a valid configuration, but only if the detector actually exists in the installed model. DC leakage current is current that comes from the charger inside the vehicle, and a regular Type AC RCD may fail to detect it and may even be weakened by it.
Which instruments are used to test a charging station?
No single instrument does it all. An inspecting electrician uses an installation tester for earthing, insulation and RCD trip time tests. Alongside it, there are two dedicated instruments for charging stations: an instrument that simulates an electric vehicle and tests the station itself, and an analyzer that measures power quality and loads.
| Device | What is checked by | Best for | Price (as of November 2026) |
|---|---|---|---|
| AC charging station tester, model DSG-500 | Vehicle simulation via a Type 2 socket, charging states A, B, C, D, communication fault (CP) and earthing fault (PE) simulation, cable resistance | Installers, service technicians, inspecting electricians | ₪1,190 (instead of ₪1,790) |
| Power quality and load analyzer, model DSG-10602 | 4 voltage channels and 4 current channels, harmonics up to the 50th, THD, power and energy per phase, imbalance, flicker, inrush current, long-term logging | Electrical designers, management companies, buildings and parking facilities with several stations | ₪17,990 (instead of ₪19,990) |
| Installation tester (multifunction) | Earthing and continuity, insulation, RCD trip time and trip current | an inspecting electrician | The electrician's working equipment |
Prices according to the DSGCharge store. All the instruments are in the category Testing equipment.
How do you test an AC charging station with a vehicle-simulating instrument?
An instrument like the DSG-500 connects to the station cable through a Type 2 socket and behaves like an electric vehicle. This lets you test the station without a car in the parking space and reproduce faults that are hard to reproduce with a real vehicle. The instrument works with both single-phase stations (up to 250V) and three-phase stations (up to 480V), with indicator lights for each phase and each state.
A typical work sequence:
- State A, not connected: Verify that the station is in standby and there is no voltage on the connector.
- State B, connected: The station detects a “vehicle” and signals the allowed current. In a managed charging station, this is also the moment to check authorization via RFID or the app.
- State C, charging: The station closes the contactor, and you check that there is voltage on all the phases that are supposed to work.
- State D, charging with ventilation required: Check that the station responds according to its settings.
- Fault simulation: Disconnect the communication line (CP) and the earth (PE) in simulation, and check that the station stops charging and displays a fault.
- Cable test: Measure the cable resistance and verify that the station detects it correctly.
States A to D are defined in the international standard IEC 61851-1, which describes the basic communication between an AC station and a vehicle: the station sends a signal on the CP line, and the vehicle changes the voltage on the line to indicate whether it is connected and ready to charge.
When do you need a power analyzer and not just a station tester?
A power analyzer is needed when the question is not “does the station work” but “can the power in the panel handle the load.” This happens mainly in an apartment building, parking facility or business with several stations, when planning to add stations, or when there are unexplained trips.
The DSG-10602 displays waveforms in real time, measures harmonics and THD, active, reactive and apparent power per phase, imbalance and flicker, and records inrush current. You can leave it in continuous logging: 20 parameters every second, for a period of about 300 days according to the product specifications, with a battery for about 8 hours of operation. This shows what happens in the panel during evening peak hours, when most vehicles plug in.
In buildings with a load management system, the measurement helps determine how much current can be distributed among the stations without increasing the connection size. Managed charging stations such as DSG-6012 are limited to the current set for them from the cloud, so it is important to base the setting on a real measurement.
How often should a charging station be inspected?
Under section 16 of the Electricity Administration guidelines, the owner of the charging system is responsible for maintenance even after installation. The table summarizes the intervals:
| When | Who | What | Section |
|---|---|---|---|
| Before first operation and after a major modification | an inspecting electrician | Inspection covering 12 topics and an inspection report | 15 |
| At least once a year | Station owner | Pressing the RCD test button and a visual inspection | 16(a) |
| Once every six years | Electrician, ordered by the owner | System inspection and testing of the RCDs with a suitable instrument | 16(b) |
| When the RCD is the only protection against electric shock | Owner / electrician | Button every six months, instrument test every two years | 16(e) |
| When a dangerous defect is found | Owners | Immediate disconnection, and do not reconnect until repaired and inspected by an inspecting electrician | 16(g) |
Source: Electricity Administration, “Guidelines for Installing an EV Charging System,” 25.11.2025 (gov.il).
What do you check when a charging station isn't charging?
When a station isn't charging, the check starts with a simple question: is the fault in the station, the vehicle or the supply? A vehicle-simulating instrument answers this quickly: if the station passes all the states with the instrument, the problem is probably in the vehicle or its settings. If not, check the supply, the RCD and the cable.
- RCD that trips only during charging: check for DC leakage current and the RCD type.
- Slower charging than expected: check how many phases are working and what current the station is signaling.
- Trips in the evening hours: check the load and voltage in the panel with an analyzer.
Owners of a home charging station have a separate guide with simple checks they can do themselves: Charging station not responding?. In cloud-connected stations, many faults are diagnosed remotely before anyone goes on site. This is one of the advantages of OCPP managed stations: fault log, connection status and current limit, all available from the office.
Who tests and maintains stations installed by DSGCharge?
DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, and about 20,000 chargers and charging stations have been sold and installed to date, with installation and service teams across the country. The products hold Standards Institution of Israel (SII) approvals.
Beyond selling testing instruments, DSGCharge carries out EV charging station installation, setup and management of charging systems in buildings and parking facilities, and service for existing stations:
- Charging station installation up to 20 meters, DSG-9903: ₪2,590
- Out-of-warranty technician service call, DSG-9909: ₪590
You can see all the products on the Charging stations and accessories, and estimate the installation cost with the calculator Charging station installation cost calculator.
Frequently asked questions about charging station testing
Who is allowed to inspect a charging station before operation?
Under section 15 of the Electricity Administration guidelines (25.11.2025), an inspecting electrician holding a suitable license. The inspection is required before first operation and after every fundamental change, and the results are recorded in an inspection report.
How often should a home charging station be tested?
The station owner presses the RCD test button and visually inspects the station at least once a year. Once every six years, an electrician performs an inspection and tests the RCDs with an instrument.
What does an AC charging station tester do?
It connects to the station cable and simulates an electric vehicle. This lets you test charging states A to D, the response to a communication fault and an earthing fault, and cable detection, without a vehicle in the parking space. The DSG-500 costs ₪1,190 (as of November 2026).
Does a station tester replace the inspecting electrician's inspection?
No. It tests the station itself. Earthing, insulation and RCD trip time are tested with an installation tester, and the official pre-operation inspection is carried out by an inspecting electrician.
Which RCD is required for a charging station?
A dedicated 30mA RCD for each AC connection point, Type B, or Type A or F with a means of detecting DC leakage current. The detection device can be built into the station (section 6 of the guidelines).
Leave your details in theContact or call 077-9920350, and the DSGCharge team will get back to you.