Home charging station or a regular socket? The difference in safety, speed and price (2026)

A regular household socket is suitable only for occasional charging, up to 10 A (about 2.3kW). A home charging station charges at 7.4 to 22kW on a dedicated circuit with built-in protection. A comparison of speed, safety and price.

In short: A regular household outlet is suitable only for occasional charging: according to the Electricity Administration's guidelines, up to 10 amps, about 2.3kW, and a full charge takes a night or more. A home charging station charges at 7.4 to 22kW, on a dedicated circuit with built-in protections. In your regular parking space, a station is the safe and fast solution. In the DSGCharge store, stations from ₪1,590.

The question of whether you can get by with a regular outlet or need to install a charging station comes up for almost everyone who gets their first electric vehicle. The difference between the two isn't only speed. It also concerns safety, what the guidelines in Israel allow in your regular parking space, and the cost over time. In this guide you'll find an organized comparison of a charging station vs. a regular outlet, with a table of charging times, the Electricity Administration's requirements and the prices in the store.

If you've already decided on a station and want to choose a model, the guide Home EV charging station covers all the considerations, and you can compare all the models in the category Home charging stations.

Is it allowed to charge an electric vehicle from a regular household outlet?

Yes, but only for occasional charging. According to the Electricity Administration's guidelines for installing an EV charging system (published on 25.11.2025), a regular household outlet is permitted for occasional charging in a parking space that isn't your regular one, at a current of up to 10 amps. That's suitable for visiting family, a vacation or an emergency.

In your regular parking space, the guidelines expect a different solution: a charging station on a dedicated circuit, or a portable EV charger that connects with an industrial plug (CEE, known in the field as a "sikum" plug) to a dedicated outlet on a separate line installed by an electrician. In any case, using an extension cord or a splitter is prohibited. You'll find the details of the sections in the guide Guidelines for installing an EV charging station.

What is the difference between a regular outlet and a charging station in terms of speed?

A household outlet at 10 amps provides about 2.3kW, that is, about 2.3 kWh for every hour of charging. A home charging station charges at 7.4kW on a single-phase connection and at 11kW or 22kW on a three-phase connection – 3 to 9 times faster. The actual power is also limited by the vehicle's onboard charger.

kW (kilowatt) is the charging rate, and kWh (kilowatt-hour) is the amount of energy that goes into the battery. The table shows an estimate of charging times, based on energy divided by power:

Charging source Power Adding 20 kWh (a long daily drive) A 60 kWh battery from 10% to 80% (42 kWh)
Regular household outlet, up to 10 amps About 2.3kW About 9 hours About 18 hours
Single-phase station 7.4kW About 2.7 hours About 5.7 hours
Three-phase 11kW station 11kW About 1.8 hours About 3.8 hours
Three-phase 22kW station (for a vehicle that accepts 22kW AC) 22kW About an hour About 2 hours

Estimate based on energy divided by power, as of November 2026. In practice, the time is a little longer because of losses and at the end of charging. More details in the guide How long does it take to charge an EV at home.

Is a charging station safer than a regular outlet?

Yes. A charging station is connected to a dedicated circuit with protections designed for prolonged charging, while a regular household outlet wasn't designed to work at full load for hours every night. That's why the guidelines limit the regular outlet to occasional charging and a current of up to 10 amps.

According to the guidelines, a station in a regular parking space gets:

  • Dedicated final circuit from the electrical panel, with overcurrent protection and a nearby disconnect switch (section 4).
  • A dedicated 30mA RCD Type B, or Type A or F with a device for detecting DC residual current (section 6). The protection can be built into the station.
  • Installation by a certified electrician and a check by an inspecting electrician before first operation (section 15).
  • Ingress protection of at least IP44 in an outdoor installation (section 10).

DSGCharge home charging stations have built-in residual current protection (DC 6mA and AC 30mA), along with protection against overvoltage, overcurrent, overheating and lightning. The products have Standards Institution of Israel (SII) approvals.

When is a regular outlet enough, and when do you need a station?

A regular outlet is enough when you don't have a regular parking space of your own, or when you charge away from home only occasionally. As soon as you have a regular parking space and the vehicle charges there most of the time, the right solution is a station, or at least a portable EV charger on a dedicated industrial outlet.

Your situation The right solution
Visiting family, a vacation, an emergency A granny cable for a household outlet, up to 10 amps
A regular parking space at a private home, daily charging A home charging station on a dedicated circuit
A regular parking space, you need a solution you can take with you A 7.4, 11 or 22kW portable EV charger on a dedicated CEE outlet
Parking in an apartment building A station with a suitable feed, and in a building with several vehicles: a managed system

Torn between a portable EV charger and a station? The guide Which portable EV charger to buy compares the models, and the guide on Granny cable explains when it's really useful.

How much does a charging station cost compared to a cable for a regular outlet?

A granny cable for a household outlet costs ₪699 in the DSGCharge store, and a home charging station starts at ₪1,590, plus installation. The cost of the electricity itself doesn't depend on the outlet or the station, but on the rate and the time you charge.

Model What is Power Connection Store price
DSG-350 Granny cable, for occasional charging Up to 3.7kW (from a household outlet up to 10 amps) Standard household plug, adjustable current ₪699 (instead of ₪990)
DSG-352 Portable charger 7.4kW Dedicated single-phase CEE socket ₪1,190
DSG-1061 Smart station 11kW Three-phase, dedicated circuit ₪1,590 (instead of ₪2,190)
DSG-1062 Smart station 22kW Three-phase, dedicated circuit ₪1,790 (instead of ₪2,390)
DSG-9903 Station installation up to 20 meters from the panel – – ₪2,590

Prices as of November 2026, according to the store. The station price is for the station only and does not include installation. The stations have a 24-month warranty.

For example, a DSG-1061 station with DSG-9903 installation comes to ₪4,180 according to today's store prices. The final installation price is determined by the distance from the panel and the actual work. A breakdown of all the cost components is in the price list EV charging station, and you can get an estimate with theInstallation cost calculator.

Do you need a three-phase connection to install a station?

No. A station can also be installed on a single-phase connection, at up to 7.4kW, which is roughly 3 times faster than a household outlet. On a three-phase connection you can reach 11kW or 22kW, if the vehicle accepts that much power in AC charging.

Before choosing, it's worth checking the connection size on your electricity bill and the power your vehicle accepts. The full explanation is in the guide Single-phase vs. three-phase.

What do you do in an apartment building?

In an apartment building, an outlet in the parking garage doesn't solve everyday charging: according to the guidelines, it isn't intended for charging in a regular parking space, and you also need to agree with the building on how each resident's consumption is measured. The solution is a station fed from your own meter or a system that measures and bills each resident separately.

The options, the law and the costs are detailed in the guide EV charging station in an apartment building. In a building where several residents need to charge, DSGCharge sets up and manages Managed charging stations in apartment buildings, with load management and billing by consumption.

How do you install a home charging station with DSGCharge?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations sold and installed, and installation and service are nationwide.

  1. Choose a station according to your home's connection and your vehicle.
  2. An electrician on behalf of DSGCharge arrives, installs a dedicated circuit from the electrical panel and mounts the station.
  3. The installation is inspected according to the guidelines before first operation, and you receive the documents.

Details about the process and prices on the page EV charging station installation.

Want a tailored quote?

Tell us about your home's connection and which vehicle you have, and we'll match a station and installation. leave your details, check an estimate with theinstallation cost calculator Or call: 077-9920350.

Frequently asked questions

Can you charge an electric vehicle every night from a regular household outlet?

According to the Electricity Administration's guidelines, a regular household outlet is intended for occasional charging in a parking space that isn't your regular one, at a current of up to 10 amps. In your regular parking space, you install a charging station on a dedicated circuit, or a dedicated CEE outlet for a portable EV charger.

How fast is a home charging station compared to a regular outlet?

A regular outlet provides about 2.3kW. A station provides 7.4kW on single-phase and 11 or 22kW on three-phase – that is, 3 to 9 times faster, depending on the power the vehicle accepts.

Is it allowed to connect a charging cable to an extension cord?

No. The guidelines prohibit using an extension cord, adapters and splitters with a portable EV charger. Connect the charger directly to the outlet.

How much does a home charging station cost including installation?

According to DSGCharge store prices in November 2026: a DSG-1061 station at ₪1,590 and installation up to 20 meters DSG-9903 at ₪2,590, together ₪4,180. The final installation price is determined by the actual work.

Does charging from a station cost more on the electricity bill?

No. The cost of electricity depends on the number of kWh and the rate, not on the outlet or the station. On the time-of-use (TOU) tariff, peak hours are only on Sunday-Thursday, and on the weekend the rate is off-peak in all seasons.

Updated: November 2026. Sources: the Electricity Administration's guidelines for installing an EV charging system (25.11.2025, sections 4, 6, 10, 12, 15); prices and specifications from the DSGCharge store.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar