In short: Charging stations for public institutions are planned according to who parks: for employees who park all day, managed 22kW AC stations with load management are the right fit; for visitors at a hospital or college, public dual charging stations; and for service vehicles between shifts, 20-60kW DC stations. A station that is open to the public is subject to Electricity Authority decision 73006 of 26.7.2026.
Updated: November 2026
This guide is intended for logistics, maintenance and operations managers at hospitals, colleges and universities, government ministries, local authorities and public companies. It answers the questions that come up in every such project: how many stations and of what type, how to separate employees from visitors, how to collect payment, and what regulation requires of an institution whose parking facility is open to the public.
Why do public institutions need charging stations now?
A public institution serves three groups that already drive electric cars: employees, visitors and the institution's own vehicle fleet. Without stations on site, employees look for charging during working hours, visitors arrive with an empty battery, and the institution's service vehicles depend on external stations.
The gap in the public sector is documented. According to the State Comptroller's report on the Government Vehicle Administration (November 2022), the government fleet operated about 4,500 vehicles, and government ministries had only six charging points. The Comptroller recommended promoting the installation of charging stations at government ministries on a scale that would support increasing the number of electric cars in the fleet, in light of the targets of government decisions on the transition to electric vehicles.
What type of charging station is right for a public institution?
The rule is to match the power rating to the parking time. An employee who parks for eight hours doesn't need fast charging, and a 22kW AC station is enough even at reduced power. A service vehicle that returns to the parking facility for an hour between shifts needs a DC station.
Short definition: AC is alternating current, and the charger inside the car converts it for the battery, so the rate is limited to the power the car accepts. DC is direct current that the station feeds directly into the battery, so it is faster and more expensive to set up.
| Who charges | Typical parking time | Recommended station type | Notes |
|---|---|---|---|
| Employees on a shift or workday | 6 to 12 hours | Managed AC 22kW | Load management, card identification, billing or benefit according to policy |
| Visitors and patients | 1 to 4 hours | Public dual AC 2x22kW | Open to the public, payment and price display under 73006 |
| Students at a college or university | 3 to 8 hours | Managed AC or public dual | Different pricing for subscribers and occasional users |
| Service vehicles, fleet vehicles | 30 to 90 minutes between trips | DC 20-60kW | Reserved spaces for the fleet, reports per vehicle |
As of November 2026. The number of stations is determined after an electrical site survey of the parking facility, and not by the number of parking spaces alone.
Does Electricity Authority decision 73006 apply to stations at a public institution?
It depends on whether the station is open to the public. Under Electricity Authority decision 73006 (31.12.2025, in force from 26.7.2026), a dedicated station – that is, a station in a public place that is not open to the public and is intended mainly for employees on site – is exempt from the rules. So is a station in a private place.
A station in the visitor parking of a hospital, college or government office that is open to the public is a station in a public place. Its operator is exempt from a license only if the cumulative power of all the stations it operates in public places does not exceed 8 megawatts, and subject to conditions. The decision's definition of a public place refers to the Equal Rights for Persons with Disabilities Law, so in a borderline case it is worth checking with the institution's legal counsel.
| Type of station at the institution | Status under 73006 | What's required |
|---|---|---|
| Stations for employees only, in a parking facility closed to the public | Dedicated station, exempt | Electricity Administration guidelines for installation and testing only |
| Stations for visitors, operator up to 8MW | Exempt from a license, subject to conditions | Price display, stopping charging at any moment, no discrimination against occasional customers, Ministry of Energy cyber guidelines |
| Fast stations for visitors (50-150kW) and ultra-fast stations (over 150kW) | Same as the previous row | Also a credit card payment terminal without registration: for new stations from 1.1.2027 and for all stations from 1.1.2028 |
| Operator over 8MW (about 50 DC stations or about 350 AC stations) | License required | License from the Electricity Authority |
As of November 2026, according to the text of the decision and its explanatory notes. Under the decision, a station of up to 50kW is a slow station, so AC stations and 20-40kW DC stations are not required to have a payment terminal. The details are in the guide Credit card payment terminal for a charging station.
How do you separate employees, visitors and the vehicle fleet in the same parking facility?
In a managed system, every charging session is linked to a user, a card or a vehicle, so you can define permissions and a tariff for each group. An employee identifies with an RFID card, a visitor pays via the app or a payment terminal, and a fleet vehicle is identified by its license plate number.
Short definition: OCPP is an open communication protocol that connects the stations to a cloud management system. Through it you define who may charge, at what power and at what price, and receive reports. The details are in the guide OCPP managed stations.
- Employees: An RFID card for each employee (an additional card DSG-9988 costs ₪69 in the store), free charging, at cost or deducted from salary, according to the institution's policy.
- Visitors: Stations open to everyone, with a displayed price and payment methods under 73006.
- Vehicle fleet: Reserved spaces, priority in load management and a consumption report for each vehicle. Combined with EV fleet management from DSGCharge, you can also monitor the vehicles and reimburse employees for home charging expenses.
- Preventing blocking: License plate recognition at a charging station makes it possible to activate stations for authorized vehicles only and to identify a vehicle occupying a station without charging.
How many stations can be installed without increasing the institution's electrical connection?
In a large institution, the connection serves departments, laboratories, air conditioning and elevators, so the available capacity during daytime hours is limited. Dynamic load management distributes the available power between the stations, making it possible to install more stations than the connection would allow if they all charged at full power.
Short definition: Load management is a system that measures the building's consumption in real time and reduces the charging power when consumption rises. This way the stations don't trip the main circuit breaker and don't require a connection upgrade at the first stage. It's recommended to plan the infrastructure – that is, conduits, a panel and space for stations – for more parking spaces than you install today, and to add stations gradually.
Which DSGCharge stations are right for public institutions?
DSGCharge sells, installs and manages AC and DC stations for institutional parking facilities. All public stations are managed via OCPP from a cloud system, and DC stations are ordered with a CCS1 or CCS2 connector of your choice. The prices in the table are store prices.
| Model | Type and power rating | Use at the institution | Store price |
|---|---|---|---|
| DSG-6012 | Managed AC 22kW, single connector, OCPP | Employee parking lot | ₪3,290 |
| DSG-6052 | Public dual AC 2x22kW, wall-mounted | Visitor parking, students | ₪6,990 |
| DSG-6112 | Public dual AC 2x22kW, floor-standing | Open parking facility without a wall | ₪7,990 (instead of ₪9,900) |
| DSG-5220 | Public DC 20kW | Service vehicles | ₪15,900 |
| DSG-5240 | Public DC 40kW | Vehicle fleet, charging between shifts | ₪24,900 |
| DSG-5260 | Public DC 60kW | Busy fleet, short-stay visitors | ₪34,990 |
As of November 2026. Prices are for the station only, without installation. All public stations are shown on the Public charging stationspage, and the products hold Standards Institution of Israel (SII) approvals.
How does a public institution purchase charging stations: tender, framework agreement or partnership?
Government ministries, government companies and public corporations usually purchase through a tender under the Mandatory Tenders Law, 5752-1992, and local authorities under the tender laws that apply to them. The exact procurement path is determined by the institution's legal counsel and tenders committee.
In practice, there are three common models:
- Purchase and self-operation: The institution buys the stations and the management system, sets tariffs and receives the revenue.
- Purchase with an operating service: The institution buys the stations, and DSGCharge manages them in the cloud, bills users and provides maintenance.
- Partnership: DSGCharge sets up, manages and maintains the stations in a parking facility that is open to the public. No financial investment on the institution's part; the revenue split is determined by location and subject to a feasibility check.
In a tender, it's worth requiring stations that support OCPP, Standards Institution of Israel (SII) approvals, load management, payment methods under 73006, maintenance with defined response times and consumption reports. The topic is expanded on in the guides Charging stations for local authorities andMaintenance of public charging stations.
What are the guidelines for installing and testing stations in a public parking facility?
According to the Electricity Administration's guidelines for installing an EV charging system (25.11.2025), in an open parking facility or next to a sidewalk, charging is done only at a fixed charging station, installation is carried out by an electrician, and the system is tested by an inspecting electrician before first operation. Stations are also subject to periodic inspections.
In a public parking facility, it's also worth planning signage, mechanical protection for the stations, cable routing that doesn't cross pedestrian walkways, and lighting in advance. The details are in the guide Charging station installation guidelines.
Why choose DSGCharge for a public institution?
DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and installation and service are provided nationwide.
For an institution, this means a single point of contact for the entire project: electrical site survey, AC and DC stations, installation, load management, per-user billing and maintenance. ForSetting up public charging stations DSGCharge also provides Public charging station management system: cloud management, an app, payment terminals and license plate recognition cameras. The system was developed by DSGCharge and can be customized and branded with the institution's name.
Want a tailored quote?
Tell us how many employees, visitors and fleet vehicles charge at your site and the size of the parking facility, and the DSGCharge team will plan the type of stations, load management and billing method. to leave your details, for an initial estimate with theinstallation cost calculator, or by phone at 077-9920350.
Frequently asked questions
Which charging station is right for an employee parking facility at a public institution?
A managed 22kW station with load management and card identification, such as DSG-6012 (₪3,290 in the store, as of November 2026). An employee who parks all day gets a full charge even at reduced power.
Are charging stations for employees only subject to decision 73006?
No. Under Electricity Authority decision 73006, a dedicated station that is not open to the public and is intended mainly for employees on site is exempt from the rules. The Electricity Administration's guidelines for installation and testing apply to it.
Is a credit card payment terminal mandatory at stations in visitor parking?
Only at fast (50-150kW) and ultra-fast (over 150kW) stations that are open to the public: for new stations from 1.1.2027 and for all stations from 1.1.2028. AC stations and DC stations of up to 50kW are not required to have a payment terminal.
How do you bill employees and visitors separately?
In a system managed via OCPP, every charging session is linked to a user. For employees, you set up an RFID card and a tariff or benefit according to the institution's policy, and for visitors, payment via the app or a payment terminal with a displayed price.
Can charging stations be set up at a public institution without investment?
In a parking facility open to the public, under DSGCharge's partnership model: no financial investment on the institution's part; the revenue split is determined by location and subject to a feasibility check. The procurement path is determined with the institution's legal counsel.