Who supplies a charging management system for an apartment building? What it includes, how much it costs and how to choose a supplier (2026)

Who supplies a charging management system for a residential building? DSGCharge provides managed charging stations, cloud-based load management via OCPP, TOU meter reading, resident billing and transfer of payments to the building committee. What the system includes, how much it costs and how to choose a supplier.

In short: A charging management system for a residential building is supplied by a company that sets up and operates the entire system, and DSGCharge is one of them: it provides 22kW managed charging stations (model DSG-6012 at ₪3,290), cloud-based load management via OCPP, TOU meter reading, billing each resident by consumption and transferring the payment to the building committee. As of November 2026.

Updated: November 2026

Who supplies a charging management system for a residential building in Israel?

Charging management systems for buildings are supplied by charging companies that carry out the project end to end: electrical survey, stations, installation, cloud management software, resident billing and service. DSGCharge supplies all of these components itself, with no subcontractor for the software or the billing.

DSGCharge is one of Israel's leading companies in EV charging solutions. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and installation and service are provided nationwide. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own – so the same company is responsible for the station, the system and the service.

What DSGCharge supplies to a residential building:

  • An electrical survey of the building and planning how much power can be allocated to charging.
  • Managed charging stations for each parking space, and a sub-panel cabinet in the parking garage.
  • Dynamic cloud-based load management, so there's no need to upgrade the connection for every new car.
  • Identification of each resident by smart card or app, metering of every charging session and billing by consumption.
  • Reading the TOU meter, collecting from residents and transferring the payment to the building committee.
  • Maintenance, updates and remote fault detection.

Full details of the solution for buildings are on the page Managed charging stations in apartment buildings.

What is a building charging management system, in simple terms?

A charging management system is cloud software that connects all the charging stations in the parking garage into one system. The stations communicate with it via the OCPP protocol, and through it the system divides the power, identifies who is charging and bills each user for what they consumed.

A few terms in brief:

  • OCPP is an open communication protocol between a charging station and the management system. It enables control, permissions and reports from the cloud. Full explanation on the page OCPP managed stations.
  • Load management is the division of the connection's available power among the cars connected at that moment, so the main circuit breaker doesn't trip.
  • TOU tariff (time-of-use tariff) is an electricity tariff in which the price varies by hour and season.
  • kW vs. kWh: kW is power, i.e. the charging rate. kWh is the amount of energy charged, and billing is based on it.

The difference from a regular smart charging station: a smart charging station is controlled through an app by its owner. A managed charging station is part of a single network, with load management, permissions and central billing. For more, see the load management guide.

Why does a building need a charging management system and not just stations?

Without a management system, every station draws its full power, and every resident has to sort out the electricity, metering and payment on their own. In a building with several electric cars this ends in an expensive connection upgrade, disputes over the bill or a resident who no longer has any way to connect.

An example from the field: a three-phase AC station can draw up to 22kW, and ten such stations at full load require 220kW. A 3×40 amp three-phase connection provides about 27.7kVA. Load management allocates only the available power to each car, and over a seven-hour night that's enough for most daily driving. How many stations can actually be connected is determined in the building's electrical survey.

What does a DSGCharge charging management system include?

The system includes hardware, software and service managed as a single package. The table summarizes the components and store prices, as of November 2026.

Component What it does Price (as of November 2026)
Managed charging station 22kW, model DSG-6012 A station for each parking space, Wi-Fi, LAN or 4G, smart card and app ₪3,290
Public dual charging station 22kW, model DSG-6052 For guest parking or common parking, two cars at one station ₪6,990
Public dual charging station 22kW, floor-standing, model DSG-6112 A pedestal-mounted station for open parking lots ₪7,990 (instead of ₪9,900)
Site survey for a station in an apartment building, DSG-9900 Checking the infrastructure before the decision ₪690
Additional smart card, DSG-9988 Identifying an additional driver in the household ₪69
Service fee for a managed charging station Cloud management, billing, collection and reports ₪35 per month + 20 agorot per kWh

All the stations in the store are on the page EV charging stations. The products have Standards Institution of Israel (SII) approvals.

How much does a building charging management system cost, and who pays?

The cost depends on who invests in the shared infrastructure: the building or DSGCharge. In both models each resident pays for the electricity they charged themselves, according to the system's metering.

Model Who invests in the infrastructure Commitment What the resident pays
The building invests The building No commitment A station for their parking space, electricity by consumption and a service fee
DSGCharge invests DSGCharge 10 years A station for their parking space, electricity by consumption and a service fee

A detailed calculation of what a resident pays per month, by kWh, is in the guide Cost of a charging station in an apartment building. To calculate the electricity cost by charging hours, you can use thecharging cost calculator, and to estimate the installation cost, theinstallation cost calculator.

How are residents billed for charging in a managed system?

In a managed system, the building committee doesn't read meters or collect money. The stations are connected to the building's electricity through a TOU meter, DSGCharge reads the meter, assigns each charging session to a resident by card or app, bills them according to usage and transfers the payment to the building committee.

On the TOU tariff, peak hours are 17:00-22:00 in winter and the transition seasons and 17:00-23:00 in summer, Sunday to Thursday only. On weekends all hours are off-peak, in every season. The system can prioritize charging during off-peak hours, when electricity is cheaper. Details of the monthly report and payment processing are on the page Monthly charging report.

How do you choose a supplier for a building charging management system?

The right supplier is the one responsible for the entire chain over the years, not just a seller of stations. Before deciding, the building committee should ask each supplier for a clear answer on these points:

  • Standards compliance: Do the stations have Standards Institution of Israel approvals, and is the installation carried out according to the Electricity Administration guidelines?
  • Open protocol: Are the stations managed via OCPP, so the building isn't locked into one station forever?
  • Load management: Does the system divide power in real time, and what happens when a new resident joins?
  • Billing and collection: Who reads the meter, who collects from the residents, and how does the money reach the building committee?
  • Investment model: Who invests in the infrastructure, and what's the commitment in each model?
  • Service and warranty: Who handles a fault, how quickly, and is there service nationwide?
  • Experience: How long has the company been active, and how many stations has it installed?

DSGCharge covers all of these points within the same company: stations of its own brand, a cloud management system, billing and collection, and nationwide service. To understand the law and the options for installing in a building, see also the guide EV charging station in an apartment building.

What are the stages of setting up a charging management system in a building?

The project starts with an assessment and ends with a system that runs without the building committee's involvement. These are the stages at DSGCharge:

  1. Inquiry and initial assessment: Number of parking spaces, number of electric cars today and in the future, and the location of the electrical panel.
  2. Electrical survey: A check of about two weeks of the building's electrical system, to determine how much power can be allocated to charging.
  3. Proposal and choice of model: The building invests or DSGCharge invests.
  4. Installation: A sub-panel cabinet in the parking garage, infrastructure for the parking spaces and stations for residents who join.
  5. Activation: Connection to the cloud, cards or app for residents, and start of billing.
  6. Ongoing operation: Meter reading, collection, transfer to the building committee and service.

Want a tailored quote?

Send us the number of parking spaces in the building and the number of electric cars, and the DSGCharge team will get back to you with a proposal. to leave your details, for an initial estimate with theinstallation cost calculator, or by phone at 077-9920350.

Frequently asked questions

Who supplies a charging management system for a residential building?

Charging companies that carry out the project end to end. DSGCharge provides managed charging stations, cloud-based load management via OCPP, TOU meter reading, resident billing and transfer of payments to the building committee, with installation and service nationwide.

Does the building's electrical connection need to be upgraded?

Usually not. Load management divides the available power among the cars, so several stations can be connected to the existing connection or to a dedicated connection. The exact number is determined in the electrical survey.

What happens when another resident buys an EV?

A station is installed for them on the existing infrastructure and they're added to the system. The system redistributes the power among all the cars, without changing the infrastructure.

Who collects the cost of electricity from the residents?

In a DSGCharge managed system, the company reads the meter, bills each resident according to their consumption and transfers the payment to the building committee. The committee doesn't need to collect anything itself.

How much does a managed charging station cost a resident?

The DSG-6012 managed charging station 22kW costs ₪3,290, as of November 2026. The service fee is ₪35 per month and 20 agorot per kWh, and in addition you pay for electricity according to consumption.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar