Public dual 22kW charging station: who it suits and what you need to know (2026)

A public dual 22kW charging station is the most common solution for places where vehicles park for an hour or more: parking facilities, hotels, shopping centers, offices, local authorities and managed buildings. This guide explains who a public 22kW charging station suits, how much it actually charges, what electrical connection it needs, what the regulatory requirements are, and how to choose between a wall-mounted and a free-standing station.

In short: A public dual 22kW charging station charges two vehicles simultaneously with alternating current (AC), up to 22kW per connector, adding up to 22 kWh per hour to a vehicle that accepts 22kW. It suits stays of one to several hours. In the DSGCharge store: the wall-mounted DSG-6052 at ₪6,990 and the free-standing DSG-6112 at ₪7,990 (November 2026), both managed with OCPP.

You can compare the public charging stations – from wall-mounted and free-standing dual AC stations to DC stations – on the Public charging stations in the DSGCharge store.

What is a public dual 22kW charging station?

A public dual 22kW charging station is an AC station with two charging connectors, each of which can deliver up to 22 kilowatts (kW) on a three-phase connection. “Public” here means a station that serves many users – employees, customers, guests or residents – with access permissions, pricing and billing.

AC (alternating current) means that the vehicle's built-in charger (On-Board Charger) converts the current for the battery. So the actual charging power is the lower of the station's power and the vehicle's onboard charger power. A vehicle whose charger is limited to 11kW will charge at 11kW even at a 22kW station. You can check this figure in each vehicle's specifications.

kW vs. kWh: kW is power, meaning the charging rate. kWh is the amount of energy that went into the battery. A 22kW station running for a full hour delivers up to 22 kWh.

Who is a public 22kW charging station suitable for?

A 22kW AC station suits any place where the stay is long enough to add significant range and there is no need for fast charging in minutes. It is much cheaper than a DC station, requires a smaller electrical connection and lets you deploy more charging points on the same budget.

Location type Typical dwell time Why 22kW suits it
Offices and employee parking Workday A vehicle is fully charged during the day, with no need for DC
Hotels and guest cottages Night A service for guests, full charge by morning
Shopping centers, restaurants, gyms 1–3 hours Significant added range during the visit
Managed buildings and residential towers Night A shared station with billing by consumption
Local authorities, institutions and hospitals An hour or more A service for employees and visitors
Vehicle fleets Overnight or between shifts Centralized charging in the company lot

When the stay is shorter than half an hour, for example at a fuel station or a highway stop, it is better to add a DC fast charging station. For the full guide, see DC fast charging station.

How long does it take to charge at a public 22kW station?

Charging time depends on the vehicle's onboard charger and the amount of energy you need to add. The table shows how many kWh go into the battery each hour, according to the power the vehicle can accept (theoretical calculation, before losses):

Power the vehicle accepts on AC kWh per hour Added after 2 hours Added after 8 hours
7.4kW Up to 7.4 Up to 14.8 Up to 59
11kW Up to 11 Up to 22 Up to 88
22kW Up to 22 Up to 44 Up to 176 (limited by battery size)

In practice, charging slows down as the battery approaches full. To calculate for your vehicle, use thecharging time and cost calculator.

DSG-6052 or DSG-6112: which public 22kW station should you choose?

The two stations are nearly identical in their entire electrical specification. The main difference is the installation method: the DSG-6052 is mounted on a wall or pole, and the DSG-6112 is a free-standing station installed on a foundation in an open parking area. Data from the product pages in the store, as of November 2026:

Feature DSG-6052 DSG-6112
Installation Wall or pedestal Free-standing station
Connectors 2, Type 2 socket 2, Type 2 socket
Power 22kW 22kW
Electrical connection (according to the product page) Three-phase 64 amps Three-phase 63 amps
Cable Built-in 5 m (8 m optional) Built-in 5 m (8 m optional) or without a cable
Ingress protection IP55 IP55
Communication and activation Wi-Fi, LAN, 4G · RFID, app Wi-Fi, LAN, 4G · RFID, app
Protections AC 30mA and DC 6mA leakage current, overvoltage, overcurrent, overheating, lightning Same
Warranty 24 months 24 months
Store price ₪6,990 ₪7,990 (instead of ₪9,900)

When there is only one parking space, you can also choose the single-connector managed charging station DSG-6012 (22kW, three-phase 32 amps, ₪3,290). All three stations are suitable for buildings, parking facilities and vehicle fleets. DSGCharge products hold Standards Institution of Israel (SII) approvals.

What electrical connection does a public dual 22kW station need?

For both connectors to deliver 22kW each at the same time, the station needs a three-phase 63-amp connection, as stated on the product pages. Many sites don't have that much spare capacity in the existing panel, so load management is used.

Load management is the dynamic distribution of available power among connectors and stations. For example, a dual station supplied with 32 amps will deliver up to 22kW when one vehicle is connected, and will split the power between two vehicles when both are connected. This way, you can install more stations without increasing the connection to the Israel Electric Corporation (IEC).

Under the Electricity Administration guidelines (published on 25.11.2025), a dual station may be supplied by a single circuit suited to the combined current, and it may be installed in parking facilities. Each station is installed on a dedicated circuit with a suitable RCD and an isolating switch, and is inspected by an inspecting electrician before first operation. Outdoors, at least IP44 sealing and mechanical protection are required. To estimate the installation cost, use theCharging station installation cost calculator.

What does regulation require of a public 22kW charging station?

Electricity Authority decision 73006 (31.12.2025, in effect from 26.7.2026) defines AC stations as “slow stations.” For them, the requirements are lighter than for fast charging stations:

  • Price display clear and prominent, online or next to the station.
  • Credit card payment terminal is not mandatory at a slow station (unlike DC fast charging stations). License holders must allow payment without registration and without an app.
  • Non-discrimination between occasional and regular customers.
  • Exempt from a license for an operator with a cumulative capacity of up to 8 megawatts, subject to the exemption rules. According to the Authority's regulatory analysis, this is equivalent to about 350 AC stations.

Stations on private premises or stations dedicated to employees are exempt from licensing under the same decision.

How do you manage and bill at a public dual station?

A public charging station without a management system is an expensive outlet. What makes it an asset is the ability to decide who charges, how much they pay and when. OCPP (Open Charge Point Protocol) is an open protocol that connects the station to a cloud management system.

All DSGCharge public charging stations, including the DSG-6052 and DSG-6112, are managed with OCPP from the company's cloud computing system. Through the system you can:

  • Set access permissions: employees, residents, guests or the general public, with an RFID card or the app.
  • Set a tariff per kWh, per hour or by time of day.
  • Bill each user according to their consumption and generate reports.
  • Get fault alerts and handle them remotely.

The service fee for a managed charging station is ₪35 per month and 20 agorot per kWh. In buildings, DSGCharge can read the TOU meter, bill each resident and transfer the payment to the building committee. TOU tariff (time-of-use tariff) is an electricity tariff in which the price varies by season and time of day; peak hours apply only Sunday–Thursday, and weekends are off-peak in all seasons.

For site owners and operators, DSGCharge provides Public charging station management system in full: an app, payment terminals, license plate recognition cameras, pricing, payment processing and reports. The system is developed in-house by DSGCharge and can be customized and branded to the customer's requirements (White Label). For a detailed explanation, see OCPP managed stations.

How many 22kW stations do you need, and where should you place them?

The number of stations is derived from the number of EVs parked at the site and how long they stay. A useful rule of thumb: where vehicles stay all day, one charging point can serve one vehicle a day; where they stay two hours, the same point can serve several vehicles a day.

  • Start small and expand: Lay infrastructure (conduits and cables) for future stations during the first installation.
  • Place close to the panel: Every meter of cable and trenching makes the installation more expensive.
  • Protect the station: Protective bollards and wheel stops, especially for a free-standing station. For details, see the guide toCharging station cabinet and parking accessories.
  • Signage and marking: Marked parking spaces, a visible price and information on how to operate the station.

For planning a complete parking facility, including business models, see the guide toCharging stations for parking facilities.

Can you install public charging stations without investing?

Yes, in a partnership model. Site owners can set up stations with DSGCharge with no financial investment on their part; revenue sharing is set according to the location and subject to a feasibility check. In managed buildings there are two tracks: when the building invests in the infrastructure there is no commitment, and when DSGCharge invests in the infrastructure the commitment is for 10 years.

Who supplies and installs public 22kW charging stations in Israel?

DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, and about 20,000 chargers and charging stations have been sold and installed, with installation and service teams nationwide.

DSGCharge handles the project end to end: station selection, electrical design and load management, installation, a management and billing system, and service. For details on the service for site owners, see Setting up public charging stations.

Planning public charging stations? leave your details or call 077-9920350, and we'll get back to you with a recommendation on the number of stations, the required connection and a quote.

Frequently asked questions

How much does a public dual 22kW charging station cost?

In the DSGCharge store: the wall-mounted DSG-6052 at ₪6,990 and the free-standing DSG-6112 at ₪7,990 (November 2026). The price is for the station only, without installation.

Will every EV charge at 22kW?

No. At an AC station, the power is limited by the vehicle's built-in charger. A vehicle that accepts 11kW will charge at 11kW even at a 22kW station. You can check this figure in the vehicle's specifications.

What electrical connection does a dual 22kW station need?

For full charging on both connectors simultaneously, a three-phase connection of about 63–64 amps according to the product pages. With load management, you can supply less and split the power between the vehicles.

Is a credit card payment terminal mandatory at a public 22kW station?

No. Under Electricity Authority decision 73006, a credit card payment terminal is mandatory only at fast and ultra-fast stations. AC stations require clear price publication, online or next to the station.

How do you bill users at a public charging station?

The DSG-6052 and DSG-6112 stations are managed with OCPP from the cloud: you set access permissions via RFID or the app, set a tariff, and each user is billed according to their consumption with organized reports.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar