A public dual 22kW charging station is the most common solution for places where vehicles park for an hour or more: parking facilities, hotels, shopping centers, offices, local authorities and managed buildings. This guide explains who a public 22kW charging station suits, how much it actually charges, what electrical connection it needs, what the regulatory requirements are, and how to choose between a wall-mounted and a free-standing station.
In short: A public dual 22kW charging station charges two vehicles simultaneously with alternating current (AC), up to 22kW per connector, adding up to 22 kWh per hour to a vehicle that accepts 22kW. It suits stays of one to several hours. In the DSGCharge store: the wall-mounted DSG-6052 at ₪6,990 and the free-standing DSG-6112 at ₪7,990 (November 2026), both managed with OCPP.
You can compare the public charging stations – from wall-mounted and free-standing dual AC stations to DC stations – on the Public charging stations in the DSGCharge store.
What is a public dual 22kW charging station?
A public dual 22kW charging station is an AC station with two charging connectors, each of which can deliver up to 22 kilowatts (kW) on a three-phase connection. “Public” here means a station that serves many users – employees, customers, guests or residents – with access permissions, pricing and billing.
AC (alternating current) means that the vehicle's built-in charger (On-Board Charger) converts the current for the battery. So the actual charging power is the lower of the station's power and the vehicle's onboard charger power. A vehicle whose charger is limited to 11kW will charge at 11kW even at a 22kW station. You can check this figure in each vehicle's specifications.
kW vs. kWh: kW is power, meaning the charging rate. kWh is the amount of energy that went into the battery. A 22kW station running for a full hour delivers up to 22 kWh.
Who is a public 22kW charging station suitable for?
A 22kW AC station suits any place where the stay is long enough to add significant range and there is no need for fast charging in minutes. It is much cheaper than a DC station, requires a smaller electrical connection and lets you deploy more charging points on the same budget.
| Location type | Typical dwell time | Why 22kW suits it |
|---|---|---|
| Offices and employee parking | Workday | A vehicle is fully charged during the day, with no need for DC |
| Hotels and guest cottages | Night | A service for guests, full charge by morning |
| Shopping centers, restaurants, gyms | 1–3 hours | Significant added range during the visit |
| Managed buildings and residential towers | Night | A shared station with billing by consumption |
| Local authorities, institutions and hospitals | An hour or more | A service for employees and visitors |
| Vehicle fleets | Overnight or between shifts | Centralized charging in the company lot |
When the stay is shorter than half an hour, for example at a fuel station or a highway stop, it is better to add a DC fast charging station. For the full guide, see DC fast charging station.
How long does it take to charge at a public 22kW station?
Charging time depends on the vehicle's onboard charger and the amount of energy you need to add. The table shows how many kWh go into the battery each hour, according to the power the vehicle can accept (theoretical calculation, before losses):
| Power the vehicle accepts on AC | kWh per hour | Added after 2 hours | Added after 8 hours |
|---|---|---|---|
| 7.4kW | Up to 7.4 | Up to 14.8 | Up to 59 |
| 11kW | Up to 11 | Up to 22 | Up to 88 |
| 22kW | Up to 22 | Up to 44 | Up to 176 (limited by battery size) |
In practice, charging slows down as the battery approaches full. To calculate for your vehicle, use thecharging time and cost calculator.
DSG-6052 or DSG-6112: which public 22kW station should you choose?
The two stations are nearly identical in their entire electrical specification. The main difference is the installation method: the DSG-6052 is mounted on a wall or pole, and the DSG-6112 is a free-standing station installed on a foundation in an open parking area. Data from the product pages in the store, as of November 2026:
| Feature | DSG-6052 | DSG-6112 |
|---|---|---|
| Installation | Wall or pedestal | Free-standing station |
| Connectors | 2, Type 2 socket | 2, Type 2 socket |
| Power | 22kW | 22kW |
| Electrical connection (according to the product page) | Three-phase 64 amps | Three-phase 63 amps |
| Cable | Built-in 5 m (8 m optional) | Built-in 5 m (8 m optional) or without a cable |
| Ingress protection | IP55 | IP55 |
| Communication and activation | Wi-Fi, LAN, 4G · RFID, app | Wi-Fi, LAN, 4G · RFID, app |
| Protections | AC 30mA and DC 6mA leakage current, overvoltage, overcurrent, overheating, lightning | Same |
| Warranty | 24 months | 24 months |
| Store price | ₪6,990 | ₪7,990 (instead of ₪9,900) |
When there is only one parking space, you can also choose the single-connector managed charging station DSG-6012 (22kW, three-phase 32 amps, ₪3,290). All three stations are suitable for buildings, parking facilities and vehicle fleets. DSGCharge products hold Standards Institution of Israel (SII) approvals.
What electrical connection does a public dual 22kW station need?
For both connectors to deliver 22kW each at the same time, the station needs a three-phase 63-amp connection, as stated on the product pages. Many sites don't have that much spare capacity in the existing panel, so load management is used.
Load management is the dynamic distribution of available power among connectors and stations. For example, a dual station supplied with 32 amps will deliver up to 22kW when one vehicle is connected, and will split the power between two vehicles when both are connected. This way, you can install more stations without increasing the connection to the Israel Electric Corporation (IEC).
Under the Electricity Administration guidelines (published on 25.11.2025), a dual station may be supplied by a single circuit suited to the combined current, and it may be installed in parking facilities. Each station is installed on a dedicated circuit with a suitable RCD and an isolating switch, and is inspected by an inspecting electrician before first operation. Outdoors, at least IP44 sealing and mechanical protection are required. To estimate the installation cost, use theCharging station installation cost calculator.
What does regulation require of a public 22kW charging station?
Electricity Authority decision 73006 (31.12.2025, in effect from 26.7.2026) defines AC stations as “slow stations.” For them, the requirements are lighter than for fast charging stations:
- Price display clear and prominent, online or next to the station.
- Credit card payment terminal is not mandatory at a slow station (unlike DC fast charging stations). License holders must allow payment without registration and without an app.
- Non-discrimination between occasional and regular customers.
- Exempt from a license for an operator with a cumulative capacity of up to 8 megawatts, subject to the exemption rules. According to the Authority's regulatory analysis, this is equivalent to about 350 AC stations.
Stations on private premises or stations dedicated to employees are exempt from licensing under the same decision.
How do you manage and bill at a public dual station?
A public charging station without a management system is an expensive outlet. What makes it an asset is the ability to decide who charges, how much they pay and when. OCPP (Open Charge Point Protocol) is an open protocol that connects the station to a cloud management system.
All DSGCharge public charging stations, including the DSG-6052 and DSG-6112, are managed with OCPP from the company's cloud computing system. Through the system you can:
- Set access permissions: employees, residents, guests or the general public, with an RFID card or the app.
- Set a tariff per kWh, per hour or by time of day.
- Bill each user according to their consumption and generate reports.
- Get fault alerts and handle them remotely.
The service fee for a managed charging station is ₪35 per month and 20 agorot per kWh. In buildings, DSGCharge can read the TOU meter, bill each resident and transfer the payment to the building committee. TOU tariff (time-of-use tariff) is an electricity tariff in which the price varies by season and time of day; peak hours apply only Sunday–Thursday, and weekends are off-peak in all seasons.
For site owners and operators, DSGCharge provides Public charging station management system in full: an app, payment terminals, license plate recognition cameras, pricing, payment processing and reports. The system is developed in-house by DSGCharge and can be customized and branded to the customer's requirements (White Label). For a detailed explanation, see OCPP managed stations.
How many 22kW stations do you need, and where should you place them?
The number of stations is derived from the number of EVs parked at the site and how long they stay. A useful rule of thumb: where vehicles stay all day, one charging point can serve one vehicle a day; where they stay two hours, the same point can serve several vehicles a day.
- Start small and expand: Lay infrastructure (conduits and cables) for future stations during the first installation.
- Place close to the panel: Every meter of cable and trenching makes the installation more expensive.
- Protect the station: Protective bollards and wheel stops, especially for a free-standing station. For details, see the guide toCharging station cabinet and parking accessories.
- Signage and marking: Marked parking spaces, a visible price and information on how to operate the station.
For planning a complete parking facility, including business models, see the guide toCharging stations for parking facilities.
Can you install public charging stations without investing?
Yes, in a partnership model. Site owners can set up stations with DSGCharge with no financial investment on their part; revenue sharing is set according to the location and subject to a feasibility check. In managed buildings there are two tracks: when the building invests in the infrastructure there is no commitment, and when DSGCharge invests in the infrastructure the commitment is for 10 years.
Who supplies and installs public 22kW charging stations in Israel?
DSGCharge is one of Israel's leading companies in EV charging solutions. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, and about 20,000 chargers and charging stations have been sold and installed, with installation and service teams nationwide.
DSGCharge handles the project end to end: station selection, electrical design and load management, installation, a management and billing system, and service. For details on the service for site owners, see Setting up public charging stations.
Planning public charging stations? leave your details or call 077-9920350, and we'll get back to you with a recommendation on the number of stations, the required connection and a quote.
Frequently asked questions
How much does a public dual 22kW charging station cost?
In the DSGCharge store: the wall-mounted DSG-6052 at ₪6,990 and the free-standing DSG-6112 at ₪7,990 (November 2026). The price is for the station only, without installation.
Will every EV charge at 22kW?
No. At an AC station, the power is limited by the vehicle's built-in charger. A vehicle that accepts 11kW will charge at 11kW even at a 22kW station. You can check this figure in the vehicle's specifications.
What electrical connection does a dual 22kW station need?
For full charging on both connectors simultaneously, a three-phase connection of about 63–64 amps according to the product pages. With load management, you can supply less and split the power between the vehicles.
Is a credit card payment terminal mandatory at a public 22kW station?
No. Under Electricity Authority decision 73006, a credit card payment terminal is mandatory only at fast and ultra-fast stations. AC stations require clear price publication, online or next to the station.
How do you bill users at a public charging station?
The DSG-6052 and DSG-6112 stations are managed with OCPP from the cloud: you set access permissions via RFID or the app, set a tariff, and each user is billed according to their consumption with organized reports.