How to choose a charging station for a Tesla in Israel? A professional guide from DSGCharge

Considering a charging station for your Tesla in Israel? The DSGCharge guide explains which stations are available, what to check before installation, how to choose the right cable, and the advanced solutions for Tesla owners in Israel. Includes practical recommendations and a call for professional advice.

How to choose a charging station for a Tesla in Israel? A professional guide from DSGCharge

Updated: November 2026

In short: Any home charging station with a Type 2 connector is suitable for a Tesla in Israel. In most Tesla models, the onboard charger accepts up to 11kW on AC charging, so an 11kW station (on a three-phase connection) is usually the right choice. In the DSGCharge store, an 11kW smart charging station costs ₪1,590 and a 22kW station costs ₪1,790 (as of November 2026), plus installation.

Bought a Tesla in Israel or planning to? The next question is: how do you choose a charging station that suits your car, your home and your daily routine exactly? Choosing the right charging station for your Tesla ensures convenient, safe and efficient charging – and prevents unnecessary faults.

DSGCharge is one of Israel's leading companies in EV charging solutions and has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. About 20,000 chargers and charging stations have been sold and installed, and the installation and service teams work across the country – in private homes, apartment buildings, parking facilities and businesses.

You can compare the 11kW and 22kW models on the Home charging stations in the DSGCharge store.

Is every charging station suitable for a Tesla in Israel?

Yes. Tesla models sold in Israel come with a Type 2 socket (the European standard) for AC charging and a CCS2 socket for DC fast charging. So any home charging station with a Type 2 connector will charge a Tesla, without an adapter.

What determines the actual charging speed is the combination of three things: the station's power, the home's electrical connection (single-phase or three-phase), and the vehicle's onboard charger (OBC – the component in the car that converts alternating current to the direct current that goes into the battery). An unsuitable installation can cause slow charging, disconnections or faults, so it's worth checking the electrical infrastructure before buying.

What power does a Tesla need: 7.4kW, 11kW or 22kW?

In most Tesla models, the onboard charger is limited to 11kW on AC charging (check your car's specifications). This means an 11kW station uses the car's full capability, and a 22kW station won't charge it any faster. A 22kW station can be useful if there's another EV in the household that supports 22kW, or if you want a station that will also suit your next car.

Station powerRequired electrical connectionActual charging power in a Tesla (11kW charger)Estimated time to add 60 kWh
Granny cable in a household outlet (up to 10A)Regular socketAbout 2.3kWAbout 26 hours (for occasional charging only)
7.4kWSingle-phase, 32A7.4kWAbout 8 hours
11kWThree-phase, 16A per phase11kWAbout 5.5 hours
22kWThree-phase, 32A per phase11kW (limited by the car)About 5.5 hours

Approximate calculation, without charging losses. As of November 2026.

A detailed explanation of the differences: 11kW or 22kW charging station, and on charging times by battery: How long does it take to charge an electric car. If your home has only a single-phase connection, a 7.4kW station will charge most of the battery during a normal night.

Which charging station should you buy for a Tesla?

For most Tesla owners in a private home, a smart charging station is the right fit – a station with an app, charge scheduling and consumption tracking. In an apartment building, parking facility or business, a managed charging station is the right fit; it connects to a cloud management system via the OCPP protocol (an open language in which charging stations talk to the management system) and enables load management, access permissions and billing for each user.

ModelTypePowerSuitable forStore price
DSG-1061Smart station11kWPrivate home, Tesla with an 11kW charger₪1,590
DSG-1062Smart station22kWA home with another car that supports 22kW₪1,790
DSG-6012Managed station (OCPP)22kWApartment building, parking facility, business₪3,290
DSG-3012Dual station2 × 22kWHome with two cars₪6,490
DSG-350Granny cable (portable charger)Up to 3.7kW, adjustable amperageBackup and occasional charging from a regular household outlet₪699

Store prices, as of November 2026. Installation is separate.

For all the models, accessories and cables: EV charging stations. The products have Standards Institution of Israel (SII) approvals.

AC or DC: do you need a fast charging station for your Tesla at home?

For most Tesla owners, a home AC station is enough: overnight charging fills the battery for a full day of driving. A DC station (direct current, which charges the battery directly without going through the onboard charger) is needed at home only in special cases – for example, when you drive very long distances every day, when there are several EVs, or for cars with an especially large battery. A DC station requires a larger electrical connection and a higher investment. Details: Home DC charging station.

What should you check in the electrical infrastructure before installing a Tesla charging station?

Before ordering a charging station, you must check the electrical infrastructure in the home or building: a code-compliant electrical panel, a dedicated line for the station, a suitable RCD, proper earthing and spare capacity on the connection. An 11kW or 22kW station requires a three-phase connection; in many apartments, we check whether a 16A or 32A per phase line can be added without overloading the rest of the home, and if not, we add load management or increase the connection size.

At DSGCharge, we carry out a site survey, examine all the components (distance from the panel, cable routing, panel limitations) and install according to the Electricity Administration guidelines. Prices, steps and requirements: EV charging station installation. For an estimated cost: Charging station installation cost calculator. A focused installation guide for Model Y owners: Installing a charging station for a Tesla Model Y.

A charging station with a fixed cable or a socket: which is better for a Tesla?

For most Tesla owners, a station with a fixed cable is more convenient: park, plug in and drive, without taking a cable out of the trunk. A station with a socket suits those who have several cars with different connectors, or those who want a clean station without a hanging cable.

  • Fixed cable (Tethered): maximum convenience, safety, less flexibility.
  • Socket (Socketed): flexibility, suits several cars, requires keeping a cable in the car.
  • Adapters: usually not needed for an Israeli Tesla, except in special cases.

How to choose the right cable: Type 2 charging cable.

How do you install a Tesla charging station in an apartment building?

In an apartment building, we recommend choosing a managed charging station with load management (smart distribution of electrical power among the stations so as not to exceed the building's connection). This way, several residents can charge simultaneously without increasing the connection size, and each resident is billed according to their consumption. DSGCharge builds and operates managed charging systems for buildings: the DSG-6012 station (₪3,290), a service fee of ₪35 per month + 20 agorot per kWh, and billing each resident by consumption. Details: charging stations in apartment buildings.

How much does a Tesla charging station cost, including installation?

The total cost consists of the station and the installation. In the DSGCharge store, an 11kW smart charging station costs ₪1,590 and a 22kW station costs ₪1,790. Standard installation up to 20 meters from the panel (DSG-9903) costs ₪2,590, and up to 30 meters (DSG-9904) ₪2,990 (as of November 2026). In other words, an 11kW station with installation up to 20 meters costs about ₪4,180. A greater distance, trenching, a cabinet or increasing the connection size adds to the cost. Full price list: How much does a charging station cost.

Do you need insurance for a Tesla charging station?

A home charging station is part of the structure, so it's worth confirming with your insurance company that it is covered under your building insurance and third-party liability insurance. What to check and which documents to prepare: EV charging station insurance.

When is it cheapest to charge a Tesla at home?

On the TOU (time-of-use) tariff, electricity is expensive only during peak hours Sunday–Thursday: 17:00-22:00 in winter and the transition seasons, and 17:00-23:00 in summer. On weekends, the whole day is off-peak, in all seasons, and prices vary by season. A smart charging station with scheduling lets you charge your Tesla only during off-peak hours. What it actually costs: How much does it cost to charge an EV at home, and a calculation based on your data: Charging cost calculator.

In summary: For a Tesla in a private home, an 11kW smart charging station on a three-phase connection is usually the right fit; in an apartment building – a managed charging station with load management and billing by consumption. Want a professional charging solution for your Tesla? To the charging stations store, or Leave your details and we'll get back to you. Phone: 077-9920350.

Frequently asked questions about Tesla charging stations in Israel

Is every charging station suitable for a Tesla?

Yes. Teslas in Israel come with a Type 2 socket, and any home charging station with a Type 2 connector will charge them without an adapter.

Is there any point in a 22kW charging station for a Tesla?

In most Tesla models, the onboard charger is limited to 11kW, so a 22kW station won't charge faster. It's worthwhile if there's another car that supports 22kW or with your next car in mind. More information: 22kW charging station.

How much does a Tesla charging station cost?

In the DSGCharge store, an 11kW smart charging station costs ₪1,590 and a 22kW station costs ₪1,790, and installation up to 20 meters costs ₪2,590 (as of November 2026).

Can a Tesla charging station be installed in any apartment?

Not always. You need to check the electrical infrastructure, space in the panel and spare capacity. In an apartment building, a managed charging station with load management is usually installed.

How long does it take to charge a Tesla at home?

With an 11kW station, you add about 60 kWh in about 5.5 hours, and with a 7.4kW station in about 8 hours. With a granny cable in a household outlet, charging is very slow and suitable for occasional charging only.

Do you need a DC station for a Tesla at home?

Usually not. An 11kW AC station is enough for overnight charging. A home DC station is suitable for special cases, such as very long drives every day or several EVs.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar