Bought a Chevrolet Silverado EV, a GMC Hummer EV or another electric pickup imported from the US, and discovered that a regular home charging station charges it very slowly? You are not alone. Charging station for an electric pickup American model has to solve two problems at once: a huge 130-200 kWh battery, and an American connector standard (CCS1) that doesn't match most of the infrastructure in Israel. In this guide we explain why this happens, how long each charge takes at each power level, what electrical connection you need, and how to choose a DC fast charging station for your home or business.

In short: An American electric pickup in Israel charges on alternating current (AC) on a single phase only, meaning about 7kW, so a full charge of a battery of about 200 kWh takes more than a full day. The solution is a 20-60kW DC home charging station with an original CCS1 connector, which cuts charging to about 4-12 hours. A 20kW charging station can make do with a 3X40 connection in most cases.

Which electric pickups come to Israel, and how do they differ?

Electric pickups come to Israel mainly through small-scale and parallel imports, not through the brands' official importers. According to reports in the business press, the GMC Hummer EV has been registered in Israel in the dozens, and the Chevrolet Silverado EV and Ford F-150 Lightning also appear in import records. The GMC Sierra EV, the Silverado's sibling on the same platform, also comes from the same source. What they all have in common: they were built for the North American market, with an American charging port and an on-board charger designed for the American power grid.

Model Battery capacity (per the manufacturer, depending on version) Maximum DC charging AC charging in the US (240V)
Chevrolet Silverado EV Up to about 200 kWh (Max Range version) Up to 350kW Up to 19.2kW
GMC Hummer EV Pickup About 200 kWh usable Up to 350kW (in 800V mode) Level 2 at 240V
GMC Sierra EV Ultium platform, like the Silverado Depending on the version Depending on the version
Ford F-150 Lightning 98 kWh (Standard) / 131 kWh (Extended) 150kW 11.3kW / 19.2kW

Data from manufacturers' publications for the American market. Other electric pickups imported from the US (including new models) usually behave the same way when it comes to charging: a CCS1 port and single-phase AC charging. Before buying a charging station, check your vehicle registration and the label on the charging port to see which standard your vehicle has.

Why doesn't an American pickup charge on three-phase AC in Israel?

This is the question that confuses pickup owners the most, and the answer is entirely technical:

  • The American J1772 (Type 1) connector is single-phase. It has only two current-carrying pins (L1 and L2/N), an earthing pin and two communication pins. It has no pins for three phases, so even a 22kW three-phase home charging station cannot deliver more than one phase to it.
  • The on-board charger (On-Board Charger) was designed for the American grid. In the US, fast home charging is done at 240V using a split-phase system, with currents of up to 80A. That is how the Silverado reaches 19.2kW there. In Israel the grid is 230V per phase, and a home charging station usually supplies up to 32A per phase, meaning about 7.4kW.
  • The CCS1 connector is a J1772 with two additional pins for direct current. So the only way to get high power is to bypass the on-board charger entirely and charge with direct current (DC) straight into the battery.

By comparison, a European vehicle with a Type 2 and CCS2 connector can charge on three-phase AC at 11-22kW. That is the essential difference between a CCS1 charging station and the European charging station that is common in Israel. Want to understand the terms in depth? See the charging glossary.

How long does it take to charge an electric pickup at each power level?

The basic calculation: energy (kWh) divided by power (kW), plus losses. To be conservative, we assumed 90% efficiency (meaning only 90% of the station's power goes into the battery), and added time for the end of charging, when the vehicle reduces power. This is an estimate only: actual time depends on temperature, battery condition and vehicle settings.

Station power 200 kWh battery, 10%-80% 200 kWh battery, 0%-100% 131 kWh battery, 10%-80%
7kW AC (single-phase) About 22 hours About 32 hours or more About 15 hours
20kW DC About 8 hours About 12 hours About 5 hours
30kW DC About 5.5 hours About 8 hours About 3.5 hours
40kW DC About 4 hours About 6 hours About 2.5 hours
60kW DC About 2.5-3 hours About 4.5 hours About 1.7 hours

The practical conclusion: with 7kW, a pickup that is driven a lot can't fully charge in one night. A 20kW DC charging station already allows a full “fill-up” overnight, and 30-40kW suits anyone who also needs to charge in the middle of the day, or a business with several pickups. To calculate based on your vehicle and mileage, use thecharging time and cost calculator.

Which charging station for an electric pickup is right for you?

A DC fast charging station for the home is not just another “wallbox”. It is a unit that contains a power converter, so the electrical connection it needs is also larger. You'll find a comparison between AC and DC for all vehicle types in the guide Home DC charging station. Here is the range of DSGCharge charging stations for pickups:

Model Power Three-phase input current (per spec) Approximate required capacity Minimum electrical connection Price (as of 10/2026, excluding installation)
DSG-5120 20kW DC 32A About 22 kVA 3X40 ₪9,428
DSG-5130 30kW DC 45A About 31 kVA Larger than 3X40 ₪15,328
DSG-5140 40kW DC 63A About 43.5 kVA At least 3X63 ₪22,408
DSG-5160 60kW DC 91A About 63 kVA At least 3X100 Upon quote

Capacity is calculated as 230V per phase times three phases (for comparison, a 3X40 connection is 27.71 kVA and 3X25 is 17.32 kVA). Important: the connection also has to serve the rest of the home's or business's consumption. So the “minimum connection” is a starting point, and the final decision is made after a load assessment. For charging stations of 30kW and up, most private homes will require coordinating a connection upgrade with the Israel Electric Corporation (IEC).

What's included in the spec of DSGCharge DC charging stations:

  • Connector CCS1 or CCS2, your choice at the time of ordering, so the pickup connects directly without an adapter.
  • Three-phase 380V input, 50/60Hz.
  • Built-in 5-meter cable, with the option of a longer cable.
  • Activation by RFID card, app or Plug&Charge, and support for the OCPP 1.6J protocol for remote management.
  • Built-in leakage protection (6mA DC / 30mA AC), protection against overvoltage, overcurrent, overtemperature and lightning, and an IP55 rating.
  • 24-month warranty with at-home service.

Don't have a large three-phase connection, or need a solution that moves between sites? Portable DC charging stations are also available: DSG-5020 (20kW) andDSG-5030 (30kW). For all models, see the DC fast charging stations category.

DC home charging station or public fast charging: which pays off more?

With a charging station at home you pay your own electricity rate. According to the Electricity Authority tariffs in effect from 1.7.2026 (incl. VAT): the flat residential rate is 63.52 agorot per kWh, and on the TOU tariff the off-peak price is about 46-50 agorot, compared with about ₪1.72 during summer peak hours. In the example of charging a 200 kWh battery from empty to full, including about 10% charging losses (about 220 kWh from the grid):

Where and when you charge Price per kWh (incl. VAT, 7/2026) Estimated cost of a full charge
Home, TOU tariff, off-peak hours ₪0.46-₪0.50 About ₪100–₪111
Home, flat rate ₪0.6352 About ₪140
Home, TOU tariff, summer peak (17:00-23:00) ₪1.72 About ₪379
Public fast charging According to the price published by the operator Multiply the published price by about 200 kWh

Two conclusions. First, a DC charging station at home makes the pickup very cheap to run, because a large battery means a lot of kWh in every charge, and every agora in the tariff is multiplied by 200. Second, it is worth scheduling charging for off-peak hours: a 20-30kW charging station finishes most charging sessions before morning, even if you start after 23:00. The hours: peak 17:00-22:00 in winter and the transition seasons, and 17:00-23:00 in summer (in the transition seasons and summer, weekends have no peak). For an exact calculation with your mileage and tariff: Charging cost calculator.

How do you install a DC home charging station?

  1. Checking the electrical connection. What is the existing connection size (1X40, 3X25, 3X40, etc.), what is the home's consumption, and is an upgrade needed? For a 20kW charging station, a 3X40 connection is enough in most cases.
  2. Choosing a location. Close to the electrical panel and to where the pickup parks. A DC charging station is a free-standing or wall-mounted unit of considerable weight; it needs a stable surface and room for the cable.
  3. Planning a dedicated circuit. According to the Electricity Administration guidelines, the charging station is fed from a dedicated circuit with suitable disconnection and protection devices, and is installed by an electrician with the appropriate license. A DC charging station requires a certificate of conformity to the IEC 61851-23 standard.
  4. Installation, testing and commissioning. Connection, pre-commissioning testing, configuring the connector (CCS1) and a test charge with the pickup.
  5. Connecting to management (optional). If you want to monitor consumption, restrict permissions or receive reports, the charging station is connected to a management system via the OCPP protocol.

For an installation cost estimate based on your distance and connection, go to theinstallation cost calculator, or read more about EV charging station installation.

What about adapters, and why is an original CCS1 connector better?

There are DC adapters between CCS2 and CCS1 on the market, as well as adapters that connect an American portable charging cable to an Israeli outlet. But before you rely on them as a permanent solution, it is important to know the guidelines: The Electricity Administration guidelines for installing an EV charging system (11/2025) state that it is forbidden to use an adapter for the EV connector, and that it is forbidden to use adapters, splitters or an extension cord in the socket outlet that feeds a charging device. In addition, occasional charging from a household outlet is limited to 10A, meaning about 2.3kW, which is only about 1% of a 200 kWh pickup battery for every hour of charging.

So the right solution for regular charging of an American pickup at home or at a business is a charging station with an original CCS1 connector. All DSGCharge DC charging stations are available with CCS1 as an option, precisely so you won't need an adapter. An explanation of all adapter types and the guidelines: DC and AC adapters for EVs.

Charging American pickups at a business: how many pickups, what power?

Contracting, agriculture, infrastructure and field companies that operate several electric pickups need to think about total power, not a single charging station. A few rules of thumb:

  • One pickup that drives up to a few hundred km a day: 20kW overnight is enough in most cases.
  • Several pickups that return together in the evening: Several 20-30kW charging stations with load management, or one 40-60kW charging station with rotating charging sessions.
  • Pickups that must head out again in the middle of the day: 40-60kW, and for a large fleet it is worth considering DC fast charging station at higher power.

At a business, OCPP support lets you manage the charging stations from the cloud: who charges, how much, and when. Read more about Managed charging station and OCPP and about EV fleet management.

What should you look for when buying a charging station for an electric Silverado?

  • Connector: Original CCS1, not CCS2 with an adapter.
  • Power that matches your connection: A 60kW charging station on a 3X40 connection won't work at full power. A 20kW station that always works is better than a 40kW station that trips the panel.
  • Warranty and service: Who comes when there's a fault, and how quickly? A DC charging station is a power product, and local service matters more than price.
  • Standards compliance: Compliance with the required standards and test approval from an accredited laboratory. Avoid self-importing charging stations without service in Israel.
  • Management: Support for OCPP, RFID card and app, so you can control who charges and get consumption data.

Why buy a charging station for an electric pickup from DSGCharge?

DSGCharge, part of S.M.C. Dor HaAtid, has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own, so there is no middleman between the manufacturer and you: the specs, inventory, warranty and service are all with us. To date, about 20,000 chargers and charging stations have been sold and installed, and we have installation and service teams nationwide. For pickups, we supply 20-60kW DC charging stations with an original CCS1 connector, OCPP support for remote management, a 24-month warranty, and a compatibility check of the electrical connection before installation. Beyond the private home, DSGCharge builds and manages charging systems for businesses and fleets. For the full range, see EV charging stations.

Want a charging station for your pickup?

Tell us which pickup you have, your electrical connection size and how far from the panel the charging station will be, and we'll recommend the right power and prepare a quote including installation. leave your details or call 077-9920350. Want an estimate first? Installation cost calculator.

Frequently asked questions

Why does my electric Silverado charge at only 7kW on a home charging station?

Because the American J1772 (Type 1) connector is single-phase, and the on-board charger was designed for the American 240V grid. In Israel it receives a single 230V phase, and on a 32A home charging station that is about 7.4kW. To charge fast, you need to bypass the on-board charger and charge with direct current (DC) via CCS1.

How long does it take to charge a Hummer EV on a DC home charging station?

By a conservative estimate, for a battery of about 200 kWh: from 10% to 80% takes about 8 hours on a 20kW charging station, about 5.5 hours at 30kW and about 4 hours at 40kW. On a 7kW single-phase AC charging station, the same charge takes about 22 hours.

What electrical connection does a DC home charging station need?

For a 20kW charging station (32A input current per phase), a 3X40 connection is enough in most cases. A 30kW charging station needs a connection larger than 3X40, a 40kW station at least 3X63, and 60kW at least 3X100. In any case, a load assessment is carried out, because the connection also serves the rest of the home.

Can you charge an American pickup on a CCS2 charging station with an adapter?

Such adapters exist, but the Electricity Administration guidelines for installing charging systems (11/2025) prohibit using an adapter for the EV connector. For regular charging at home or at a business, the right solution is a charging station with an original CCS1 connector.

How much does it cost to charge an electric pickup at home?

According to 7/2026 tariffs incl. VAT, a full charge of about 200 kWh (including losses) costs about ₪140 on the flat rate and about ₪100–₪111 during off-peak hours on the TOU tariff. Charging during summer peak hours costs 3 times as much or more, so it is worth scheduling charging for the night.

Is a DSGCharge DC charging station also suitable for a regular electric vehicle?

Yes. When ordering, you choose a CCS1 connector for an American pickup or CCS2 for most electric vehicles in Israel. The charging station delivers the power the vehicle is able to accept, up to the station's rated power.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 