Beyond a conduit in the wall: how to plan charging infrastructure that increases the value of your project

In new projects, "EV readiness" is no longer a minimal technical item. The article explains why proper planning of charging infrastructure, load management and preparation for future expansion are a strategic move that directly affects the property's value, the residents' experience and the project's ability to stay relevant and attractive for years to come.
Beyond a conduit in the wall: how to plan charging infrastructure that increases the value of your project
Beyond a conduit in the wall: how to plan charging infrastructure that increases the value of your project

Beyond a conduit in the wall: how to plan charging infrastructure that increases the value of your project

It usually happens too late. The plans are almost finalized, the parking garage is already “sorted out”, and then someone at the table asks: “Wait, what about charging for electric vehicles?”. Suddenly an item that seems simple enters the picture — EV readiness in a new building — but it very quickly becomes clear that it isn't just another conduit, another electrical point, or another requirement you can tick off and move on from.

The real question isn't whether there will be residents with Electric car. They're already here, and the numbers are only rising. The question is a different one: will your project look truly ready, or just “sort of ready”? Because in today's market, and certainly in tomorrow's, there's a huge difference between a building with a basic readiness item and a building where charging infrastructure was planned in advance – infrastructure that can grow, be managed smartly, and not turn the parking garage into an area of expensive improvisations.

For developers, contractors, management companies and planners, this is no longer a question of a gimmick. It's a business decision that affects planning, marketing, operations and property value. When you understand this in time, you can save a lot of headaches later — and build a project that stays relevant and leading for years.

Why is basic “readiness” no longer enough?

When people say “readiness”, most imagine one thing: we'll run an empty conduit, leave space, and when a resident wants a EV charging station — we'll deal with it case by case. On paper, it sounds reasonable. In practice, this is exactly where new projects miss the big picture.

Charging infrastructure doesn't begin and end with a single station. It begins with the question of how the building will function when not one resident asks to charge, but five, ten or twenty. A new building that wasn't built with forward thinking may very quickly find itself with a parking garage full of inconsistent solutions, arguments over electricity consumption, and loads the original system was never designed to carry.

Simply put: if the planning assumes we'll just “cut a corner”, the project will run into the problem later, when the solution is already more expensive, more cumbersome and less aesthetic. This is exactly where the difference between basic readiness and planning a managed system comes in.

In a new building, it makes sense to think of the parking garage as a single infrastructure, planned for future growth and control. This includes main infrastructure routes, smart distribution of feeds, room for expansion in the electrical panels, and a Load management system that will let more residents charge simultaneously, without tripping the system or requiring an expensive connection upgrade.

This point is especially critical at the marketing stage. Today's apartment buyer is no longer satisfied with a general statement that “there's EV readiness”. They want to understand whether it's readiness you can work with, or an item that sounds good in the brochure but on site will require additional work, chiseling, approvals and adjustments that weren't taken into account.

The three components of smart charging infrastructure

One of the common mistakes is thinking in terms of a single product, as if the whole question is which Home charging station the resident will install. In a new project, the thinking needs to be system-wide. Not “which station”, but “which environment will allow installing Charging stations correctly, efficiently and economically – both today and five years from now”.

A modern charging system in a new project consists of several layers:

  1. Planned physical infrastructure: This is the foundation. A main conduit route, strategic placement of electrical cabinets and panels, and ensuring convenient access between the panels and all parking spaces. Proper planning here prevents unnecessary chiseling and drilling after occupancy.
  2. Flexible electrical infrastructure: This is where thinking about power comes in. How much electricity is available to the building? How do you distribute it in a way that allows future growth? A dynamic load management (DLM) system is a key component, allowing the available power to be divided among several vehicles charging simultaneously, instead of allocating a fixed maximum power to each station.
  3. Management and control layer: This is the layer that turns a collection of stations into a smart system. It allows the management company or the building committee to manage users, track each resident's electricity consumption, generate accurate bills, and monitor the system's health. This is the key to preventing disputes and ensuring smooth day-to-day operation.

Today, more and more projects aren't settling for a “partially ready” solution but are planning in advance a system that can grow. Not everything has to be installed on day one, but the foundation has to be right. Otherwise, every future expansion becomes an expensive, cumbersome project in its own right.

How does proper planning translate into real value (and ROI)?

Some things increase property value not because they're flashy, but because they solve future problems and remove friction. Smart charging infrastructure belongs exactly in this category.

  • For the developer and contractor: The value lies in risk management and in creating a more attractive asset. Proper planning at the construction stage prevents unexpected costs and complex hassles after handover. A project with managed charging infrastructure is a premium asset that is easier to market and price.
  • For the marketing team: This is a clear competitive advantage. Instead of a vague answer, salespeople can present a concrete, managed, future-ready solution. It's a message that resonates well with a sophisticated buyer audience.
  • For the resident and the management company: The value is peace of mind and operational simplicity. The resident knows there's a clear, easy path toCharging station installation, and the billing for their consumption is accurate. The management company gets an orderly system that prevents arguments and allows full control.

Even if you don't measure it with a single ROI figure, the logic is simple. A building that is genuinely ready for future charging needs is a more attractive, more orderly asset that is easier to operate. It avoids patch-on-patch solutions that look bad, cost more and generate unnecessary complaints.

So how do you start? Planning charging infrastructure with experts

The right way to plan charging infrastructure in a new project doesn't start with choosing a station brand, but with a strategic conversation about the future. How many parking spaces are relevant? What growth is expected over the next five years? Is a user billing solution needed? And how do you stay flexible without inflating the budget?

That's exactly why there's decisive value in working with an organization that knows the field end to end. AtDSG Charging Solutions, we don't just sell equipment – we build a complete solution. Our experience, from home charging solutions to complex managed systems for buildings, parking facilities andVehicle fleets, allows us to match the most suitable solution to the nature of the project, its budget and its future vision.

The process starts with a consultation, continues with detailed planning with the electrical engineer and the architect, and ends with support until working infrastructure is in place. When you do it in time, the routes are set correctly, room is allocated for expansion, and you avoid a situation where after occupancy everyone asks “why didn't anyone think of this earlier?”.

If you're in the planning stages of a new building, parking facility or real estate project and want to make sure your readiness will be an asset and not a burden — we invite you to contact us for consulting and charging solution planning. A good conversation at the right stage can save a lot of expensive fixes at the wrong stage.

Frequently asked questions

Is it enough to include “EV readiness” in the specification without planning a complete system?

Basic readiness (such as an empty conduit) is a start, but it doesn't solve the challenges of the future. Without planning for load distribution, expansion capacity and user management, the building will be “ready” only on paper and will need expensive upgrades later on.

When is the best stage to bring charging consulting into a new project?

As early as possible, at the initial planning stage together with the electrical consultant and the architect. The further planning progresses without proper consideration of charging infrastructure, the more flexibility decreases and the required adjustments become more complex and expensive.

Does every new building need to install charging stations in every parking space from day one?

Not necessarily. In many cases, the most efficient and economical solution is to plan smart backbone infrastructure (Future-Proof) that allows charging stations to be added gradually, according to the residents' actual demand, without the need for complex infrastructure work each time.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 