Cost of a charging station in an apartment building: how much a resident pays per month (2026)

Updated: November 2026

In short: The cost of a charging station in an apartment building with a DSGCharge managed system consists of two parts. One-time: a DSG-6012 managed charging station for ₪3,290 and installation from ₪2,590. Monthly: a ₪35 service fee, 20 agorot per kWh and the cost of electricity according to a TOU meter. A resident who charges 250 kWh a month during off-peak hours in winter pays about ₪202 a month.

A building committee that receives a request from a resident with an electric car usually asks two questions: who pays for the infrastructure, and how much it will cost each resident at the end of the month. In this guide we've gathered the Cost of a charging station in an apartment building in a managed system, with prices from the store and official electricity tariffs, and calculation examples by amount of charging. The legal side and the order of steps are detailed in the guide EV charging station in an apartment building.

What does the cost of a charging station in an apartment building include?

In a building with a managed system, the cost is divided into three layers: the building's common infrastructure, the resident's one-time cost (the station and installation in their parking space), and the monthly cost (service fee and electricity according to use). Each layer is financed differently, so it's worth understanding each one separately.

  • Common infrastructure: A charging panel, main cabling and a load management system. It is determined according to the site survey in the building, and there are two models for financing it (details below).
  • One-time cost per resident: A managed charging station and installation from the infrastructure to the parking space.
  • Monthly cost per resident: A fixed service fee, a small surcharge per kWh, and the electricity itself according to a TOU meter.

Managed system is a system in which all the stations in the building are connected to the cloud, identify the user, share the available power among themselves (load management) and meter every charging session for billing. Full details on the setup are on the page Managed charging stations in apartment buildings.

How much does it cost a resident to join the building's charging system?

The one-time cost for a resident joining a managed system starts at about ₪5,880: a DSG-6012 managed charging station for ₪3,290 and a standard installation of up to 20 meters for ₪2,590. When the parking space is farther from the infrastructure, installation of up to 30 meters costs ₪2,990. Prices include VAT and are correct as of November 2026.

Component Model Price When do you need
apartment building installation survey DSG-9900 ₪690 Once, at the start of the process: checks the connection, the panel, the distances and the expected number of users
Managed charging station 22kW DSG-6012 ₪3,290 For each resident who joins: user identification, load management and billing, cloud connection via OCPP
Charging station installation up to 20 meters DSG-9903 ₪2,590 Standard installation in an external conduit
Charging station installation up to 30 m DSG-9904 ₪2,990 When the parking space is farther from the feed point
Additional smart card DSG-9988 ₪69 For another vehicle or a family member

Prices from the DSGCharge store, incl. VAT, as of November 2026. Chiseling, excavation and connection upgrades are not included.

22kW is the station's maximum power (kilowatts, the charging rate). In practice, the car charges according to its on-board charger and the power the load management system allocates to it at that moment.

Who pays for the common infrastructure: the building or DSGCharge?

There are two models, and the difference between them is mainly who finances upfront and whether there is a commitment. If the building invests in the infrastructure itself, there is no commitment period. If DSGCharge invests in the infrastructure, the building committee doesn't finance the panel, the main cabling and the system upfront, and a 10-year commitment is required.

Question The building invests in the infrastructure DSGCharge invests in the infrastructure
Upfront financing of the common infrastructure The building fund or the residents DSGCharge
Commitment period None 10 years
Management, billing and monthly report DSGCharge DSGCharge
Suitable for A building with a fund that wants full flexibility A building that doesn't want to collect money upfront from all residents

In both models, the cost of the common infrastructure is determined after the site survey, because it depends on the connection size, the location of the panel, the distances in the parking garage and the number of parking spaces that will be connected in the future. In large buildings and towers with dozens or hundreds of parking spaces, advance planning is especially important.

How much does a managed charging station cost a resident per month?

A resident's monthly bill in a managed system consists of three components: a service fee of ₪35 a month, a surcharge of 20 agorot for every kWh charged, and the cost of the electricity itself according to the building's TOU meter. Those who charge a little pay a little, and those who charge a lot pay according to their usage.

kWh (kilowatt-hour, kWh) is the unit of energy that goes into the battery, and it's what appears on the bill. TOU tariff (time-of-use tariff) is a tariff in which the price per kWh changes by season and hour. According to the Electricity Authority tariff book (update of 1.7.2026), these are the low-voltage energy component prices, incl. VAT:

Season Off-peak (agorot per kWh) Peak (agorot per kWh)
Winter (December-February) 46.63 114.70
Transition (March–May, October–November) 45.78 49.58
Summer (June–September) 50.42 172.23
Flat tariff, for comparison 63.52 63.52

Source: the Electricity Authority tariff book, update of 1.7.2026; VAT (18%) is included in the calculation. As of November 2026. Peak hours apply only Sunday to Thursday (17:00-22:00 in winter and the transition seasons, 17:00-23:00 in summer). Weekends and night hours are off-peak in all seasons.

Calculation example: how much will a resident pay according to the amount of charging?

The table shows the monthly bill for three usage levels, with all charging done during off-peak hours in winter (46.63 agorot per kWh). This is the common situation in a residential building: the car stays in the parking garage all night, and the management system prioritizes off-peak charging.

Charging per month Off-peak electricity 20 agorot per kWh Service fee Total per month
150 kWh ₪69.95 ₪30.00 ₪35 ₪134.95
250 kWh ₪116.58 ₪50.00 ₪35 ₪201.58
400 kWh ₪186.52 ₪80.00 ₪35 ₪301.52

An example for illustration only, based on the TOU energy component and the service fees above, as of November 2026.

For the same 250 kWh, off-peak charging in summer (50.42 agorot) brings the bill to about ₪211, and in the transition seasons (45.78 agorot) to about ₪199. Charging during peak hours in winter is significantly more expensive: 250 kWh at peak would cost ₪286.75 for the electricity alone. To translate kWh into kilometers according to your car and mileage, use theCharging cost calculator.

Is it cheaper to connect a station to the apartment's meter?

In terms of electricity alone, connecting to the apartment's meter is a few dozen shekels a month cheaper, because there's no service fee. 250 kWh on the flat tariff (63.52 agorot) costs ₪158.80, compared with about ₪202 in a managed system off-peak. But such a comparison isn't always relevant, because connecting to the apartment's meter is possible only in some buildings.

Criterion Connection to the apartment's meter A managed system for the whole building
Equipment and installation Smart station DSG-1062 (₪1,790) + splitting from the meter DSG-9907 (₪2,790) + installation DSG-6012 managed charging station (₪3,290) + installation
Monthly billing On the apartment's electricity bill ₪35 + 20 agorot per kWh + electricity according to the TOU tariff
When it's possible Assigned parking space and a reasonable route from the meter Even when the meters are far from the parking garage or the parking is common
When more residents join Each resident runs their own cable from the meter They join the existing infrastructure, with load management
Work for the building committee None None: DSGCharge reads the meter, bills and transfers to the building committee

Prices from the store, as of November 2026.

When the meters are on the entrance floor and the parking garage is two levels below, when there are dozens of residents who will want to charge in the coming years, or when the building's connection can't take any more load, the managed system is usually the practical way. Load management divides the available power among the stations in real time, so stations can be added without upgrading the connection right away. A full explanation in theLoad management for charging stations.

How is each resident's bill calculated at the end of the month?

With every charging session, the station identifies the resident by card or app, and the management system records how many kWh were charged and at what time. DSGCharge reads the building's TOU meter, bills each resident according to their exact usage and transfers the cost of electricity to the building committee. The committee doesn't read meters or chase payments.

  1. Identifying the resident at the station (smart card or app).
  2. Metering every charging session: kWh, time and season.
  3. Pricing according to the TOU tariff that was in effect at that hour.
  4. Billing the resident, and transferring the cost of electricity to the building committee, which pays the meter's bill.

A detailed example of a report for several residents, including the difference between those who charge at night and those who charge during peak hours, is in the guide Monthly charging report. The stations connect to the management system via the OCPPprotocol, an open standard for communication between a charging station and a cloud-based management system. Read more inOCPP managed stations.

How do you reduce the monthly bill?

  • Charge off-peak: In winter, a peak kWh costs 2.5 times as much as an off-peak kWh, and in summer more than three times as much. The management system prioritizes charging during off-peak hours.
  • Make use of the weekend: Friday and Saturday are off-peak in all seasons.
  • Don't charge “just in case” in the evening hours: Plugging in during the evening with charging scheduled for the night gets the same amount of charge at a lower price.
  • Plan the infrastructure in advance: Infrastructure planned for the entire parking garage saves repeat work when more residents join.

Why do building committees choose DSGCharge?

DSGCharge is one of Israel's leading companies in EV charging solutions, and it sets up and manages charging systems for buildings and towers end to end: site survey, planning, installation, load management, billing according to a TOU meter, and service. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and its installation and service teams operate nationwide. Its products have Standards Institution of Israel (SII) approvals.

Want to know how much installation will cost in your parking space? Try the Charging station installation cost calculator, or leave your details and we'll get back to you with a check of your building. Phone: 077-9920350.

Frequently asked questions

How much does charging station installation in an apartment building cost?

In a DSGCharge managed system: a DSG-6012 station for ₪3,290 and installation of up to 20 meters for ₪2,590 (up to 30 meters: ₪2,990), as of November 2026. A site survey in the building costs ₪690. The common infrastructure is priced after the site survey.

How much does a resident pay per month for a managed charging station?

A ₪35 service fee, 20 agorot per kWh, and the cost of electricity according to the TOU tariff. A resident who charges 250 kWh off-peak in winter pays about ₪202 a month.

Does the building committee need to finance the infrastructure upfront?

Not necessarily. If the building invests in the infrastructure, there is no commitment. If DSGCharge invests in the infrastructure, the building committee doesn't finance it upfront, and a 10-year commitment is required.

Does a resident who doesn't charge pay anything?

The monthly bill (service fee, per-kWh surcharge and electricity) applies to whoever has a managed charging station and charges at it. How the cost of the common infrastructure is divided is determined by the building's decision and the agreement with it.

Why is electricity at a managed charging station billed according to the TOU tariff?

Because the stations are connected through a TOU meter, where a kWh is cheap during off-peak hours. A car that charges at night pays less than the flat tariff: 46.63 agorot per kWh off-peak in winter, compared with 63.52 agorot (incl. VAT, as of November 2026).

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 