Updated: November 2026
In short: The cost of a charging station in an apartment building with a DSGCharge managed system consists of two parts. One-time: a DSG-6012 managed charging station for ₪3,290 and installation from ₪2,590. Monthly: a ₪35 service fee, 20 agorot per kWh and the cost of electricity according to a TOU meter. A resident who charges 250 kWh a month during off-peak hours in winter pays about ₪202 a month.
A building committee that receives a request from a resident with an electric car usually asks two questions: who pays for the infrastructure, and how much it will cost each resident at the end of the month. In this guide we've gathered the Cost of a charging station in an apartment building in a managed system, with prices from the store and official electricity tariffs, and calculation examples by amount of charging. The legal side and the order of steps are detailed in the guide EV charging station in an apartment building.
What does the cost of a charging station in an apartment building include?
In a building with a managed system, the cost is divided into three layers: the building's common infrastructure, the resident's one-time cost (the station and installation in their parking space), and the monthly cost (service fee and electricity according to use). Each layer is financed differently, so it's worth understanding each one separately.
- Common infrastructure: A charging panel, main cabling and a load management system. It is determined according to the site survey in the building, and there are two models for financing it (details below).
- One-time cost per resident: A managed charging station and installation from the infrastructure to the parking space.
- Monthly cost per resident: A fixed service fee, a small surcharge per kWh, and the electricity itself according to a TOU meter.
Managed system is a system in which all the stations in the building are connected to the cloud, identify the user, share the available power among themselves (load management) and meter every charging session for billing. Full details on the setup are on the page Managed charging stations in apartment buildings.
How much does it cost a resident to join the building's charging system?
The one-time cost for a resident joining a managed system starts at about ₪5,880: a DSG-6012 managed charging station for ₪3,290 and a standard installation of up to 20 meters for ₪2,590. When the parking space is farther from the infrastructure, installation of up to 30 meters costs ₪2,990. Prices include VAT and are correct as of November 2026.
| Component | Model | Price | When do you need |
|---|---|---|---|
| apartment building installation survey | DSG-9900 | ₪690 | Once, at the start of the process: checks the connection, the panel, the distances and the expected number of users |
| Managed charging station 22kW | DSG-6012 | ₪3,290 | For each resident who joins: user identification, load management and billing, cloud connection via OCPP |
| Charging station installation up to 20 meters | DSG-9903 | ₪2,590 | Standard installation in an external conduit |
| Charging station installation up to 30 m | DSG-9904 | ₪2,990 | When the parking space is farther from the feed point |
| Additional smart card | DSG-9988 | ₪69 | For another vehicle or a family member |
Prices from the DSGCharge store, incl. VAT, as of November 2026. Chiseling, excavation and connection upgrades are not included.
22kW is the station's maximum power (kilowatts, the charging rate). In practice, the car charges according to its on-board charger and the power the load management system allocates to it at that moment.
Who pays for the common infrastructure: the building or DSGCharge?
There are two models, and the difference between them is mainly who finances upfront and whether there is a commitment. If the building invests in the infrastructure itself, there is no commitment period. If DSGCharge invests in the infrastructure, the building committee doesn't finance the panel, the main cabling and the system upfront, and a 10-year commitment is required.
| Question | The building invests in the infrastructure | DSGCharge invests in the infrastructure |
|---|---|---|
| Upfront financing of the common infrastructure | The building fund or the residents | DSGCharge |
| Commitment period | None | 10 years |
| Management, billing and monthly report | DSGCharge | DSGCharge |
| Suitable for | A building with a fund that wants full flexibility | A building that doesn't want to collect money upfront from all residents |
In both models, the cost of the common infrastructure is determined after the site survey, because it depends on the connection size, the location of the panel, the distances in the parking garage and the number of parking spaces that will be connected in the future. In large buildings and towers with dozens or hundreds of parking spaces, advance planning is especially important.
How much does a managed charging station cost a resident per month?
A resident's monthly bill in a managed system consists of three components: a service fee of ₪35 a month, a surcharge of 20 agorot for every kWh charged, and the cost of the electricity itself according to the building's TOU meter. Those who charge a little pay a little, and those who charge a lot pay according to their usage.
kWh (kilowatt-hour, kWh) is the unit of energy that goes into the battery, and it's what appears on the bill. TOU tariff (time-of-use tariff) is a tariff in which the price per kWh changes by season and hour. According to the Electricity Authority tariff book (update of 1.7.2026), these are the low-voltage energy component prices, incl. VAT:
| Season | Off-peak (agorot per kWh) | Peak (agorot per kWh) |
|---|---|---|
| Winter (December-February) | 46.63 | 114.70 |
| Transition (March–May, October–November) | 45.78 | 49.58 |
| Summer (June–September) | 50.42 | 172.23 |
| Flat tariff, for comparison | 63.52 | 63.52 |
Source: the Electricity Authority tariff book, update of 1.7.2026; VAT (18%) is included in the calculation. As of November 2026. Peak hours apply only Sunday to Thursday (17:00-22:00 in winter and the transition seasons, 17:00-23:00 in summer). Weekends and night hours are off-peak in all seasons.
Calculation example: how much will a resident pay according to the amount of charging?
The table shows the monthly bill for three usage levels, with all charging done during off-peak hours in winter (46.63 agorot per kWh). This is the common situation in a residential building: the car stays in the parking garage all night, and the management system prioritizes off-peak charging.
| Charging per month | Off-peak electricity | 20 agorot per kWh | Service fee | Total per month |
|---|---|---|---|---|
| 150 kWh | ₪69.95 | ₪30.00 | ₪35 | ₪134.95 |
| 250 kWh | ₪116.58 | ₪50.00 | ₪35 | ₪201.58 |
| 400 kWh | ₪186.52 | ₪80.00 | ₪35 | ₪301.52 |
An example for illustration only, based on the TOU energy component and the service fees above, as of November 2026.
For the same 250 kWh, off-peak charging in summer (50.42 agorot) brings the bill to about ₪211, and in the transition seasons (45.78 agorot) to about ₪199. Charging during peak hours in winter is significantly more expensive: 250 kWh at peak would cost ₪286.75 for the electricity alone. To translate kWh into kilometers according to your car and mileage, use theCharging cost calculator.
Is it cheaper to connect a station to the apartment's meter?
In terms of electricity alone, connecting to the apartment's meter is a few dozen shekels a month cheaper, because there's no service fee. 250 kWh on the flat tariff (63.52 agorot) costs ₪158.80, compared with about ₪202 in a managed system off-peak. But such a comparison isn't always relevant, because connecting to the apartment's meter is possible only in some buildings.
| Criterion | Connection to the apartment's meter | A managed system for the whole building |
|---|---|---|
| Equipment and installation | Smart station DSG-1062 (₪1,790) + splitting from the meter DSG-9907 (₪2,790) + installation | DSG-6012 managed charging station (₪3,290) + installation |
| Monthly billing | On the apartment's electricity bill | ₪35 + 20 agorot per kWh + electricity according to the TOU tariff |
| When it's possible | Assigned parking space and a reasonable route from the meter | Even when the meters are far from the parking garage or the parking is common |
| When more residents join | Each resident runs their own cable from the meter | They join the existing infrastructure, with load management |
| Work for the building committee | None | None: DSGCharge reads the meter, bills and transfers to the building committee |
Prices from the store, as of November 2026.
When the meters are on the entrance floor and the parking garage is two levels below, when there are dozens of residents who will want to charge in the coming years, or when the building's connection can't take any more load, the managed system is usually the practical way. Load management divides the available power among the stations in real time, so stations can be added without upgrading the connection right away. A full explanation in theLoad management for charging stations.
How is each resident's bill calculated at the end of the month?
With every charging session, the station identifies the resident by card or app, and the management system records how many kWh were charged and at what time. DSGCharge reads the building's TOU meter, bills each resident according to their exact usage and transfers the cost of electricity to the building committee. The committee doesn't read meters or chase payments.
- Identifying the resident at the station (smart card or app).
- Metering every charging session: kWh, time and season.
- Pricing according to the TOU tariff that was in effect at that hour.
- Billing the resident, and transferring the cost of electricity to the building committee, which pays the meter's bill.
A detailed example of a report for several residents, including the difference between those who charge at night and those who charge during peak hours, is in the guide Monthly charging report. The stations connect to the management system via the OCPPprotocol, an open standard for communication between a charging station and a cloud-based management system. Read more inOCPP managed stations.
How do you reduce the monthly bill?
- Charge off-peak: In winter, a peak kWh costs 2.5 times as much as an off-peak kWh, and in summer more than three times as much. The management system prioritizes charging during off-peak hours.
- Make use of the weekend: Friday and Saturday are off-peak in all seasons.
- Don't charge “just in case” in the evening hours: Plugging in during the evening with charging scheduled for the night gets the same amount of charge at a lower price.
- Plan the infrastructure in advance: Infrastructure planned for the entire parking garage saves repeat work when more residents join.
Why do building committees choose DSGCharge?
DSGCharge is one of Israel's leading companies in EV charging solutions, and it sets up and manages charging systems for buildings and towers end to end: site survey, planning, installation, load management, billing according to a TOU meter, and service. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. The company has been active since 2021, about 20,000 chargers and charging stations have been sold and installed, and its installation and service teams operate nationwide. Its products have Standards Institution of Israel (SII) approvals.
Want to know how much installation will cost in your parking space? Try the Charging station installation cost calculator, or leave your details and we'll get back to you with a check of your building. Phone: 077-9920350.
Frequently asked questions
How much does charging station installation in an apartment building cost?
In a DSGCharge managed system: a DSG-6012 station for ₪3,290 and installation of up to 20 meters for ₪2,590 (up to 30 meters: ₪2,990), as of November 2026. A site survey in the building costs ₪690. The common infrastructure is priced after the site survey.
How much does a resident pay per month for a managed charging station?
A ₪35 service fee, 20 agorot per kWh, and the cost of electricity according to the TOU tariff. A resident who charges 250 kWh off-peak in winter pays about ₪202 a month.
Does the building committee need to finance the infrastructure upfront?
Not necessarily. If the building invests in the infrastructure, there is no commitment. If DSGCharge invests in the infrastructure, the building committee doesn't finance it upfront, and a 10-year commitment is required.
Does a resident who doesn't charge pay anything?
The monthly bill (service fee, per-kWh surcharge and electricity) applies to whoever has a managed charging station and charges at it. How the cost of the common infrastructure is divided is determined by the building's decision and the agreement with it.
Why is electricity at a managed charging station billed according to the TOU tariff?
Because the stations are connected through a TOU meter, where a kWh is cheap during off-peak hours. A car that charges at night pays less than the flat tariff: 46.63 agorot per kWh off-peak in winter, compared with 63.52 agorot (incl. VAT, as of November 2026).