What's the difference between Type 1 and Type 2, and how does it affect choosing a charging station?

Does your vehicle need a Type 1 or a Type 2 connector? A professional DSGCharge guide explains the differences, what's important to know before choosing a charging station, and how to avoid costly faults. Including tips for a full match in Israel.

What's the difference between Type 1 and Type 2, and how does it affect choosing a charging station?

In short: Type 1 (J1772) is an American and Japanese connector that supports only single-phase AC charging, up to 7.4kW. Type 2 (Mennekes) is the European standard and the official standard in Israel, and it also supports three-phase charging at 11kW and 22kW, depending on the vehicle and the infrastructure. So first check which inlet your vehicle has, and only then choose a station, cable or adapter.

Electric vehicles are quickly becoming a leading choice in Israel, but not every vehicle and not every charging station are compatible with each other. One of the most common questions at DSGCharge is: “What's the difference between Type 1 and Type 2, and how does it affect me?” This guide will help you understand the differences, avoid costly mistakes and choose correctly.

The article is intended for electric vehicle owners, residents of apartment buildings, contractors, developers and building committees – anyone making a decision about smart, safe charging in Israel.

Once you understand which connector your vehicle has, you can choose a suitable model from the EV charging stations in the DSGCharge store.

If your vehicle's connector doesn't match the station, you can see the Type 1 to Type 2 adapters and the charging cables on the page Charging cables and adapters in the DSGCharge store.

Differences between a Type 1 and a Type 2 connector – what's important to know?

Type 1 and Type 2 are the two main standards for EV charging plugs and inlets. Type 1 (J1772) is an American/Japanese standard, common in vehicles imported from the US (such as an American Nissan Leaf, Chevrolet Volt, older Mitsubishi Outlander PHEV). Type 2 (Mennekes) is the official European and Israeli standard, and the standard in most new electric vehicles in Israel.

What this means: a Type 1 plug won't connect to a charging station with a Type 2 socket, and vice versa, unless you use a dedicated adapter. So knowing the connector type in your vehicle is critical for matching a charging station, preventing faults and maintaining safety.

Technical differences: Type 1 vs. Type 2

The differences aren't only in the shape of the connector, but also in charging capability, safety and flexibility:

  • Type 1: Supports single-phase (AC) charging only, up to 7.4kW. Mainly suitable for American/Japanese vehicles. No option for three-phase charging (11kW or 22kW).
  • Type 2: Supports single-phase and three-phase charging ( 11kW, 22kW – depending on the vehicle and infrastructure). This is the official standard in Israel, with advantages in safety, charging speed and future flexibility.

In practice, Type 2 allows faster charging, an easy upgrade path and compatibility with public stations. Type 1 vehicles are limited to single-phase power only.

How do you know what suits your vehicle in Israel?

The rule: check the inlet type in the vehicle – Type 1 or Type 2 – and only then choose a charging station and accessories. At DSGCharge we come across customers who bought a Type 2 charging station and discovered that the vehicle requires Type 1 (mainly in privately imported vehicles).

A charging station must be installed only by a certified electrician, in full compliance with the Israeli standard and the vehicle type. If your vehicle has a Type 1 connector, a Type 2 charging station can usually be adapted using a suitable cable or a high-quality adapter – but the exact compatibility must be checked in each case.

Choosing the right charging station and cable with DSGCharge

At DSGCharge we see costly mistakes in choosing charging stations without checking the connector type. A wrong purchase can mean the station won't connect to the vehicle, or charging will be slower than its potential. That's why our selection process always starts with understanding the vehicle model, the inlet type, the nature of use (private/public/in an apartment building) and the electrical infrastructure.

The DSGCharge advantage: a complete end-to-end solution – charging station, compatible cable/adapter, certified installation, professional advice and after-installation service. Our team of experts checks full compatibility and explains all the implications to the customer, including future upgrade options (such as switching to three-phase charging).

DSGCharge, one of Israel's leading companies in EV charging solutions and the importer of its charging stations, has been active since 2021, has sold and installed about 20,000 chargers and charging stations, and provides installation and service nationwide.

  • Identifying the inlet type in the vehicle (Type 1 or Type 2)
  • Checking the electrical infrastructure at home/in the parking facility
  • Matching a charging station to the Israeli standard (Type 2) or a solution for Type 1 users
  • Choosing a high-quality cable/adapter if needed
  • Professional installation that meets legal requirements

For advice and a personalized charging solution – contact us and we'll be happy to accompany you from the first question to smooth, safe charging.

Frequently asked questions: adapters, charging and load management

Does a Type 1 to Type 2 adapter solve all the problems? Not always. A high-quality adapter solves the physical connection issue, but not all aspects of safety, standards and charging power. For example, an adapter won't make a three-phase charging station fast for a Type 1 vehicle – the vehicle will charge at single-phase power only.

In apartment buildings and office buildings, it's important to check the suitability of smart load management in advance, to prevent overloads or power cuts. At DSGCharge we carry out a comprehensive check of load management system suitability, whether for private, public or business charging stations.

Don't compromise on the quality of the adapter or cable – a cheap, non-standard purchase can cause faults and even a safety hazard. Always buy cables and adapters only from a professional source, with the guidance of a certified electrician.

For the list of high-quality cables and accessories – visit theCharging stations and accessories store from DSGCharge.

In summary: correct charging starts with an exact match

The choice between Type 1 and Type 2 is a decision that affects the entire experience of using an electric vehicle. Fast, safe, fault-free charging is possible only when you choose a charging station, cable and accessories that fully match the vehicle, the infrastructure and your personal needs.

At DSGCharge you'll find a professional team, advanced charging solutions, nationwide service and support from the consultation stage through installation and ongoing service.

For professional advice and a charging solution matched to your vehicle – Contact DSGCharge and we'll be happy to help you choose correctly and enjoy safe, efficient, personalized charging.

Frequently asked questions

Can you charge a Type 1 vehicle at a Type 2 charging station?

Yes, but you need an adapter or a suitable cable. It's important to make sure of full compatibility and buy only a standard-compliant product, with the guidance of a certified electrician.

Does a Type 1 to Type 2 adapter affect charging speed?

The adapter doesn't change the vehicle's power limit. A Type 1 vehicle will charge at single-phase power only, even if the station supports faster charging.

Is every Type 2 charging station suitable for every vehicle in Israel?

Most new vehicles in Israel use Type 2, but you should check the vehicle's inlet type before buying. Some American vehicles require Type 1.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar