Installing an EV charging station in a parking space far from the electrical panel: what to check before you start

Installing an EV charging station in a parking space far from the panel is possible in many cases, but it requires proper planning. In this guide you'll find out what really needs to be checked between the panel and the parking space, what installation work may be required, and how to plan a solution that won't limit you later on.

Installing an EV charging station in a parking space far from the electrical panel: what to check before you start

If you have Electric car and your parking space is far from the electrical panel, you're not alone. This is one of the most common situations we encounter atDSG Charging Solutions: a private house where the panel is inside the house and the parking space is at the edge of the lot, an apartment building with underground parking, or a private parking space whose access isn't “next to” the existing infrastructure.

The good news is that in many cases it's possible to carry out EV charging station installation In a distant parking space. The more important news: it isn't right to decide based on distance alone. What matters is the route, the condition of the infrastructure, the connection type, the site conditions and whether you need to think already now about future use. So before choosing EV charging station, you need to understand what the installation will look like in practice.

At DSGCharge we don't look only at the product itself, but at the whole solution: from the panel to the charging point, including Charging station installation, infrastructure adaptation, load assessment and the option to expand later. This is especially true when it comes toHome charging station or a complex parking space.

If you're installing a station in a private house, you can compare the 11kW and 22kW models on the page Home charging stations in the DSGCharge store.

Charging station installation in a distant parking space: who does this happen to most?

This situation is especially common in three types of properties:

  • Private homes – when the parking space is at the front, in the yard, at the side of the house or on a different level from the electrical panel.
  • Apartment buildings – when the parking space is in an underground parking facility, and the relevant panel is located in an electrical room, a utility cabinet or on another floor.
  • Parking facilities and businesses – when a charging station needs to be connected at a remote point, while keeping the infrastructure orderly and allowing for expansion.

Exactly in these cases, it isn't enough to choose one of the Charging stations by power or design. The distance affects the installation method, the route of the line, the type of work on site, and sometimes also the decision whether Load management or a more managed solution is required.

What is checked between the electrical panel and the parking space before installing a charging station?

The first check isn't “how many meters are there from the panel to the parking space,” but how you actually get from the panel to the charging point. Sometimes a short distance creates a complex installation, and sometimes a long distance actually allows an orderly and simple route.

These are the main points checked before EV charging station installation:

  • The cable route – whether a line can be run in a wall, a ceiling, existing conduit, a service shaft, outdoors or through a parking facility.
  • Physical access – whether it's necessary to pass between levels, through closed areas, tiling, drywall, concrete or shared walls.
  • Electrical panel condition – whether the panel is suitable for the station, and whether an infrastructure adaptation is required before installation.
  • Connection type – single-phase or three-phase, depending on the existing infrastructure and the desired solution.
  • Existing loads – whether there are other significant electrical appliances, and whether it's right to incorporate Load management.
  • Station location – not only where it's possible to install, but also where it will be convenient and safe to charge every day.

That's exactly why an early suitability check is more important than a quick quote. At DSGCharge we look at the full picture: not only whether it's possible to install, but how to plan a solution that will work properly after installation too.

What work may be required when the charging point is far away?

When the parking space isn't adjacent to the panel, Charging station installation can include more than installing the station itself. In some cases the work is relatively simple, and in others more complex infrastructure is required.

Among the work that may be required:

  • Running a power line along a long route
  • Exposed or concealed conduits
  • Drilling between walls or levels
  • Passing through existing conduit or preparing new conduit
  • Working in outdoor conditions or in an underground parking facility
  • Adjusting the installation location for convenient use and cable protection
  • Lifting interlocking pavers/cutting asphalt/digging in the ground 
  • Split from the IEC meter 

In an apartment building there are also additional considerations: a route that passes through common property, keeping the parking facility looking tidy, and understanding whether it's right to think only about one station or about infrastructure that will later serve additional residents. Here the advantage of DSG Charging Solutions lies in a solution-oriented approach rather than “just installation.”

It's also important to remember that it isn't right to set a fixed price in advance without a site inspection. The cost depends on the station type, the power, the length of the route, the complexity of the route and whether additional work is required. If you're at the equipment selection stage, you can start by browsing theEV charging stations and fine-tune the installation according to the conditions on site.

How do you plan a home or private charging station that will also suit the future?

One of the common mistakes is planning only for the current situation. If you're already building infrastructure for a distant parking space, it's worth thinking a step ahead: what will happen if you change cars, add a second vehicle, or want to move to a smarter system in the future?

Proper planning in advance can include:

  • Choosing Home charging station that suits actual usage habits
  • Checking whether it's right to prepare flexible infrastructure for the future
  • Integration Load management when the infrastructure requires it
  • Choosing an installation location that won't make everyday use difficult
  • Taking into account the possibility of expansion, especially in a home with two vehicles or in an apartment building

In simple terms: if you're already opening a route and carrying out work, it's better to think ahead than to discover a year from now that you need to start everything over. This is true in a private house, and it's even more true in buildings, parking facilities and businesses.

If ease of use is also important to you, it's worth checking in advance EV charging cables and complementary equipment that will suit the length, the location and the way you actually charge.

Common mistakes before requesting a quote for charging station installation in a distant parking space

Before requesting a quote, it's worth avoiding a few mistakes that keep recurring:

  • Focusing only on distance – “It's about 15 meters” isn't enough. The route matters no less than the distance.
  • Choosing a station before checking the infrastructure – not every EV charging station suits every house, parking space or panel.
  • Not thinking about the future – an additional vehicle, an additional user or the need for a smarter station can make changes more expensive later on.
  • Treating installation as a purely technical matter – everyday use is also affected by ease of connection, aesthetics, location, access and maintenance.
  • Asking for a price without a clear picture of the site – without understanding the route and the complexity, the estimate may be inaccurate.

In such cases, what saves time, costs and frustration is an orderly preliminary consultation. DSGCharge accompanies private customers, buildings, businesses and parking facilities with inspection, matching and installation nationwide — based on the understanding that the right solution starts with proper planning.

It's important to stress: any Installing an EV charging station in a distant parking space must be carried out by a certified professional and in accordance with the relevant requirements of the law and the standard. The information here is general and doesn't replace a professional on-site inspection.

If you want to understand what's right in your case — whether a line can be run, whether Load management, and which EV charging station really suits your parking space — now is the time to turn tocontact us for charging advice or get an impression ofCharging stations and accessories store. DSG Charging Solutions here to help you plan a practical, safe solution that's right for your site.

You can estimate costs using our installation calculator: Installation calculator

Frequently asked questions

Is it possible to install an EV charging station in a parking space very far from the electrical panel?

In many cases, yes. What matters isn't only the distance, but the possible route, the condition of the infrastructure, access to the parking space and the ability to run a line properly and safely. That's why a professional inspection is needed before choosing the solution.

What usually affects the cost of installing a charging station in a distant parking space?

The cost depends on the length of the route, the complexity of the route, related work such as conduits or drilling, the station type, the power, and the condition of the electrical panel. So it isn't right to rely on a general price without understanding the site conditions.

If we'll have another electric vehicle in the future, is it worth planning for it now?

In most cases, yes. If you're already building infrastructure and running a line, it's worth checking whether it's right to prepare the installation for the future too. This is especially relevant in a home with two vehicles, in an apartment building or in a place where future expansion is expected.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 