Monthly charging report based on a TOU meter: billing and payment processing for charging in an apartment building

Switching to an electric car in an apartment building? Discover how a monthly billing system with automatic payment processing solves the challenge of dividing the electricity, prevents disputes and ensures fair payment for everyone.
An EV charging station in a modern underground parking facility, symbolizing order and financial management

In a building where several residents charge an electric car in the parking lot, the important question isn't how to install a station, but who pays how much at the end of the month. Monthly charging report based on a TOU meter answers this question in numbers: how many kWh each resident charged, how many of them during off-peak hours and how many during peak hours, and the exact cost for each one according to the actual electricity tariff. On this page you'll find how it works, what such a report looks like, how the money reaches the building committee and what to do about a resident who doesn't pay.

In short: When the building's charging stations are connected to the power supply through a TOU meter, every kWh is priced according to the hour it was charged. DSGCharge manages the charging, reads the TOU meter, bills each resident according to their exact usage, issues a tax invoice and transfers the cost of charging to the building committee. The committee receives a transparent report and doesn't deal with collection.

What is a TOU tariff, and why does it matter for charging in a building?

TOU is a time-of-use tariff: instead of a flat price for every kWh, the price of electricity changes by season and hour of the day. During peak hours, when national demand for electricity is high, a kWh is more expensive. During the remaining hours (off-peak) it is cheaper, and in many cases cheaper than the flat tariff. To bill according to the TOU tariff, you need a digital meter that records consumption by time period, not just a total.

This is especially suitable for electric cars: most cars in a residential building's parking lot stay there all night. If charging takes place during off-peak hours, the building pays less for the charging energy than it would on a flat tariff. That's why a TOU tariff for electric cars in an apartment building isn't just a matter of accounting, but also of savings.

Peak and off-peak hours on the TOU tariff (in effect since 1.1.2023)

Season Months Peak hours, Sunday–Thursday Weekends and holidays
Winter December, January, February 17:00-22:00 Off-peak all day
Transition March-May, October-November 17:00-22:00 Off-peak all day
Summer June-September 17:00-23:00 Off-peak all day

All hours that are not peak hours are off-peak hours, including the entire night.

Low-voltage TOU prices, as of July 2026

Season Off-peak (agorot per kWh, incl. VAT) Peak (agorot per kWh, incl. VAT)
Winter 46.63 114.70
Transition 45.78 49.58
Summer 50.42 172.23
Flat tariff (for comparison) 63.52 63.52

Prices according to the Electricity Authority tariff book (update of 1.7.2026), as published in TheMarker; VAT (18%) is included in the calculation. They include only the energy component, without fixed charges. Note the gap: in summer a peak kWh costs three times or more than an off-peak kWh, and in winter more than twice as much. In the transition seasons the gap is smaller, but even then the off-peak price is lower than the flat tariff. Tariffs are updated from time to time, so a good report is always calculated according to the tariff that was in effect in the month of charging.

How does DSGCharge produce a monthly charging report based on a TOU meter?

In DSGCharge's system for buildings, the stations in the parking lot are managed charging stations: they are connected to the internet, communicate over the open OCPP protocol with a cloud-based management system, and are controlled from it. Every charging session begins with identifying the resident (for example, with a smart card), so the system knows who charged, when and how much. Here's how it works, step by step:

  1. Connection through a TOU meter. The stations are connected to the power supply through a meter that records consumption by peak and off-peak hours.
  2. Identification and metering for every charging session. Each resident identifies at the station, and the system records their charging session.
  3. Meter reading. DSGCharge reads the TOU meter, so billing is based on the consumption actually measured.
  4. Calculation according to exact usage. Each resident is billed for the cost of their own usage, not according to an arbitrary split.
  5. Report and invoice. Each user has a detailed usage report and receives a tax invoice for the charging.
  6. Transfer to the building committee. DSGCharge manages the collection and transfers the cost of charging to the building committee, in a transparent and orderly way.

In addition, the system prioritizes charging during off-peak hours to lower the cost for the building. Want to understand in depth what Managed charging station makes possible, and why it's important that it works over an open protocol? We explain it on a separate page.

How do you calculate charging costs based on a TOU meter? An example of a monthly charging report

An example for illustration only: A building with four residents who charge in the parking lot, in a summer month (July 2026). The calculation is based on summer TOU prices incl. VAT: 50.42 agorot per kWh off-peak and 172.23 agorot per kWh at peak. The amounts include the energy component only.

Resident Off-peak kWh Peak kWh Total kWh Off-peak cost (₪) Peak cost (₪) Total to pay (₪)
Resident A 280 20 300 141.18 34.45 175.63
Resident in 410 0 410 206.72 0.00 206.72
Resident C 150 60 210 75.63 103.34 178.97
Resident D 95 5 100 47.90 8.61 56.51
Building total 935 85 1,020 471.43 146.40 617.83

What the example shows:

  • Resident in charged the most (410 kWh), but only off-peak. They pay about 50 agorot per kWh.
  • Resident C charged about half as much as Resident B, but 60 kWh of it at peak. Their bill is even higher than that of Resident A, who charged more. Their bill is ₪45.58 higher than what they would have paid on the flat tariff (₪133.39).
  • For the whole building: 1,020 kWh on the flat tariff would have cost ₪647.90. On the TOU tariff, with most of the charging at night, the cost is ₪617.83. The more charging shifts to off-peak, the greater the savings: if all the charging had been off-peak, the cost would have been about ₪514.

This is exactly the advantage of a TOU-based report: each resident pays for their own habits. Whoever charges at night doesn't subsidize whoever charges at peak hours, and the whole building benefits from the cheap tariff. To calculate the charging cost for your car, try the charging cost calculator.

Monthly billing for charging in a building: three methods compared

Building committees usually come to us after trying one of the first two methods. The table compares them with a managed system with a TOU report.

Criterion Equal split among residents Sub-meter and manual reading Managed system with a TOU report
Fairness Low: those who charge a little subsidize those who charge a lot Medium: metering by quantity, usually without distinguishing between peak and off-peak High: each resident according to their exact usage and the time of charging
Who does the work The building committee treasurer A volunteer who reads meters, calculates and sends payment requests DSGCharge: reading, calculation, invoice and collection
Transparency No data per resident Depends on the accuracy of manual records Detailed usage report for each user
A new resident with an electric car The split has to be recalculated Another sub-meter is needed Registers in the system and receives access
A resident's debt Remains the building committee's problem Remains the building committee's problem Charging access can be suspended remotely
Tax invoice for the resident No Usually not Yes
Disputes Frequent Over reading and calculation errors Minimal: the data is available to every user

In the example above, an equal split would have charged each resident ₪154.46. Resident D, who charged 100 kWh, would have paid almost three times their actual cost (₪56.51), and Resident B would have paid less than they consumed. That's how disputes in a building start.

Billing residents for charging: how does the money reach the building committee?

The money flow in a managed system is simple, and that's what frees the building committee from collection work:

  1. The electricity bill for the TOU meter that feeds the stations arrives at the building, like any bill for the common property.
  2. DSGCharge reads the meter, calculates the cost of each resident's usage and collects it from them. The resident receives a tax invoice.
  3. DSGCharge transfers the cost of charging to the building committee, together with a report showing where every shekel came from.
  4. The building committee pays the electricity bill, and the common fund doesn't finance anyone's charging.

This is essentially payment processing for the building committee , without the committee needing a credit card payment terminal, accounting software or a volunteer chasing residents. DSGCharge's service fees and the allocation of fixed charges on the electricity bill are set in the agreement with the building, so they were not included in the example.

As for infrastructure: in managed buildings, if the building invests in the infrastructure itself, there is no commitment period. If DSGCharge invests in the common infrastructure, a 10-year commitment is required.

What do you do about a resident who doesn't pay?

With manual methods, a resident's debt becomes the building committee's problem and sometimes a dispute between neighbors. In a managed system, charging access is tied to the resident. Since the stations are controlled from the cloud, the access of a resident with a debt can be suspended remotely until they settle it, without disconnecting cables and without a confrontation in the parking lot. The other residents continue to charge as usual.

How often do you get a report, and how accurate is it?

Billing is monthly, and the report details each user's usage. The accuracy relies on two things: identification of every charging session at the station, and reading of the TOU meter itself. Because billing is based on measured consumption and not on an estimate, the report holds up even when a resident asks to check their bill.

What does the law say about building committees and charging stations?

As of October 2026, there is still no dedicated law regulating charging stations in apartment buildings. Here's what is known from verified sources:

  • Connection to the apartment's power supply: The land registry superintendent in Tel Aviv ruled in 2023 (case 639-21) that a resident may install a station in the parking space assigned to their apartment, connected to the apartment's power supply, without the neighbors' consent. The conditions: written notice to the building committee and to all apartment owners at least 45 days before the start of installation, minimal impact on the common property and the building's appearance, compliance with electrical and planning laws, and all costs borne by the resident.
  • The bill: A bill on the subject passed its first reading in the Knesset in May 2024 and is not yet law. Under the bill, connecting to the common property's power supply would require the consent of a majority of apartment owners and a separate meter, and installation in a parking space that is common property would require the consent of two-thirds.

What this means for the building committee: once the stations are connected to the common power supply, separate metering and orderly billing with each resident are needed. A monthly report based on a TOU meter provides exactly that. The information here is general and is not legal advice; it's also worth checking the building's bylaws.

What do you need to get started?

You'll find the full picture of planning, load management and setup on the page charging stations in apartment buildings, and the stations themselves in the category EV charging stations.

Why DSGCharge?

DSGCharge, part of S.M.C. Dor HaAtid, has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own. About 20,000 DSGCharge-branded chargers and charging stations have been sold and installed. We have installation and service teams nationwide. In buildings we don't just sell stations: we set up the system, manage the charging, read the TOU meter, collect from the residents and transfer the cost of charging to the building committee. Because the same company imports the stations, installs them and operates the management system, the building committee has one address for every question.

Want an orderly monthly charging report in your building?

Leave your details on the page Contact or call 077-9920350. We'll check the building, explain how the TOU meter, billing and transfer to the building committee will work, and offer a plan that fits the number of residents charging today and in the future.

Frequently asked questions

What is a monthly charging report based on a TOU meter?

A report that details for each resident how many kWh they charged in the month, how many during off-peak hours and how many during peak hours, and the cost according to the TOU tariff that was in effect. Based on the report, each resident is billed for the cost of their exact usage.

Does a TOU meter for a charging station really lower the building's electricity costs?

Yes, when most of the charging takes place during off-peak hours. In July 2026, an off-peak kWh in summer cost 50.42 agorot incl. VAT, compared with 63.52 agorot on the flat tariff. Charging during peak hours is more expensive, so the system prioritizes off-peak charging.

How is a resident who charges during peak hours billed?

According to their actual usage. Whoever charges during peak hours pays the peak price for those kWh, and whoever charges at night pays the off-peak price. This way no resident subsidizes a neighbor's charging habits.

Does the building committee need to collect money from residents?

No. DSGCharge manages the collection, issues the resident a tax invoice and transfers the cost of charging to the building committee with a detailed report. The committee pays the electricity bill without financing charging from the common fund.

What happens if a resident doesn't pay for charging?

Since the stations are managed via OCPP and controlled from the cloud, the resident's charging access can be suspended remotely until they settle the debt. The other residents continue to charge as usual.

Does a resident need permission to connect a station to the apartment's power supply?

According to the 2023 ruling of the land registry superintendent in Tel Aviv, the neighbors' consent is not required when the station is in the assigned parking space and connected to the apartment's power supply. Written notice to the building committee and the apartment owners at least 45 days in advance is required. The bill on the subject has not yet been finally approved.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 