DC fast charging station: a buying guide for businesses and operators (40-240kW)

The comprehensive guide for business owners: find out when it pays to invest in a DC fast charging station, what the difference is between fast and ultra-fast, and how to turn the investment into a growth engine. Professional advice from DSGCharge.
A DC fast charging station installed in an office building's parking facility, showing an advanced commercial charging solution.

A DC fast charging station is the biggest decision a business makes in the charging field: it requires a large electrical connection, coordination with the Israel Electric Corporation (IEC), a management and payment system, and ongoing maintenance. This guide is intended for fuel stations, charging operators, shopping malls, vehicle fleets, local authorities and developers weighing 40kW against 240kW, and it explains what really determines charging speed, what is needed on the electrical side and how much the whole project costs, not just the unit.

In short: The actual power is set by the lowest of three factors: the station's power (and how it is split between the connectors), the maximum power the vehicle can accept, and the battery's charging curve. 60kW suits a parking stay of about an hour; 120kW and up suits a short stop on a highway. Before buying, check the electrical connection, OCPP, payment, service and warranty.

What is a DC fast charging station and how is it different from an AC station?

At an AC station the vehicle receives alternating current, and the vehicle's built-in charger (On-Board Charger) converts it to direct current for the battery. That's why the power is limited by the on-board charger: 7.4kW to 11kW in most vehicles and 22kW in some. At a DC station the conversion takes place inside the station, and direct current flows straight into the battery. This makes it possible to reach tens and hundreds of kilowatts.

In Israel, the most common fast charging connector is CCS2 (the European version of the Combined Charging System). Some older vehicles use CHAdeMO, and vehicles built to the American standard (such as imported pickups) come with CCS1. The Electricity Administration guidelines for installing a charging system require a DC station (charging mode 4) to comply with IEC 61851-23 and the vehicle connector to comply with IEC 62196.

What determines the power the vehicle actually receives?

The most common mistake when buying an ultra-fast charging station is assuming that a 240kW station will charge every vehicle at 240kW. In practice, three factors determine the power, and the lowest of them wins.

1. The vehicle's maximum charging acceptance

Every vehicle has a maximum DC power it can accept, determined by its voltage architecture (400V or 800V), the current limits of the battery and cables, and the cooling system. A vehicle that accepts up to 100kW will charge at the same speed at a 120kW station and at a 240kW station. Power is voltage multiplied by current: in a 400V vehicle, even a current of 250 amps yields only about 100kW, which is why 800V vehicles are the ones that truly make use of 180kW and 240kW stations.

2. The charging curve

The vehicle does not receive constant power throughout the charge. The battery management system (BMS) requests high power from the station when the battery is relatively empty and gradually lowers it as the charge approaches 80%, to protect the cells. Above 80% the power drops sharply, which is why fast charging times are always quoted for the 10-80% range. Battery temperature also matters: a very cold or very hot battery will accept less power. Many vehicles preheat the battery when you navigate to a fast charging station.

3. Power sharing between two connectors

Most fast public charging stations are built with two connectors and a shared power module. When one vehicle is connected, it can receive the full power. When a second vehicle connects, the power is split. For example, according to our product pages: on the DSG-7540 one connector delivers up to 240kW and two connectors at once deliver 120kW each; on the DSG-7420 the power drops to 60kW per connector; and on the DSG-7360 to 30kW per connector. When planning a busy site, it's important to calculate the power per vehicle in a two-vehicle scenario, not just the headline figure.

Which DC fast charging station suits which location?

The table shows the estimated charging time from 10% to 80% for a 60-80kWh battery (that is, about 42-56kWh going into the battery). This is a conservative estimate: it assumes one connected vehicle, an average power lower than the rated power because of the charging curve, and a vehicle able to accept that power. A vehicle limited to lower power will charge more slowly. To calculate for your own vehicle, use thecharging time calculator by power.

Station power Estimated time 10-80% Suitable location DSGCharge models
20kW About 2.5-3.5 hours Fleet overnight, garage, office; also portable DSG-5120, DSG-5020 portable
30kW About 1.5-2.5 hours Employee parking, fleet, site without a large connection DSG-5130, DSG-5030 portable, DSG-5230 with storage
40kW About 70-100 minutes Hotel, restaurant, neighborhood shopping center, business DSG-5140, DSG-5240 public
60kW About 50-75 minutes Shopping mall, supermarket, municipal parking facility, local authority DSG-5260, DSG-6960, DSG-7360, DSG-7060 with advertising screen
80kW About 40-60 minutes Shopping center with advertising exposure DSG-7080 with advertising screen
120kW About 30-50 minutes Fuel station, junction, fleet hub DSG-7420
180kW About 25-40 minutes (in a vehicle that accepts 150kW or more) Intercity fuel station, public fast charging hub DSG-7480
240kW About 20-35 minutes (limited mainly by the vehicle) Ultra-fast hub on a highway, heavy fleet depots DSG-7540

Rule of thumb: a 60kW charging station suits a place where the customer stays for about an hour anyway (shopping, a meal). A 120kW-and-up charging station suits a place where the driver stops only to charge and wants to leave within half an hour. You can see all models in the categories DC fast chargers andPublic stations.

What electrical connection does a DC charging station need at each power level?

A DC station is fed by a three-phase supply, and its input current is much higher than that of a home connection. For comparison, a 3X40 amp connection is about 27.7 kVA according to the Electricity Authority's tariff book, which is less than a single 40kW station. The table shows the input current as listed on our product pages, and the estimated apparent power based on a 400V line voltage (our own calculation, for estimation only):

Power Input current (per the product page) Estimated apparent power
40kW (DSG-5140, DSG-5240) 63 amps three-phase About 44 kVA
60kW (DSG-5260, DSG-7360) 91 amps three-phase About 63 kVA
120kW (DSG-7420) 182 amps three-phase About 126 kVA
180kW (DSG-7480) 285 amps three-phase About 197 kVA
240kW (DSG-7540) 364 amps three-phase About 252 kVA

What this means in practice:

  • A single 40-60kW station at most businesses requires at least a check of the spare capacity in the existing connection, and often a connection upgrade.
  • 120kW and up, or several stations at one site, reach hundreds of kVA. At this scale the IEC may require a new dedicated connection, and in some cases a high-voltage supply with a customer-owned transformer, which is subject to separate IEC technical and safety requirements.
  • Load management between the stations and the other consumers on the site can reduce the required connection size, at the cost of lower power during peak load hours.

The process with the IEC starts with a request for a connection upgrade or a new connection. According to the IEC guidelines for charging station supply configurations, stations in public spaces are fed from a dedicated connection ordered by the responsible body (for example, a local authority), and not from street lighting or traffic lights. The payment for a connection upgrade is set in the tariff book according to the kVA added, and the timeline depends on whether grid works are required. That's why the first step in any project is a site survey and an electrical feasibility check, before ordering equipment. You'll find more on the full process on the page Setting up public charging stations.

OCPP, payment and app: how do you manage a public DC fast charging station?

All DSGCharge public charging stations, AC and DC, are managed with the OCPP protocol from a cloud computing system. A public station isn't just an electrical device – it's a point of sale. Three components determine whether it will work as a business:

  • OCPP (Open Charge Point Protocol) is an open protocol that connects the station to a central management system: remote start and stop, pricing, reports, fault alerts and software updates. The protocol is developed by the Open Charge Alliance, and OCPP 2.1 was published in December 2025 as international standard IEC 63584-210. A station with OCPP doesn't lock you into a single software provider. A detailed explanation is in thecharging station glossary.
  • Payment processing: activation via app, RFID card or credit card. On our public models the credit card terminal is a paid add-on, so it's worth deciding in advance whether the site is meant for casual customers (who need credit card payment) or for a fleet and regular customers (for whom an app and card are enough).
  • Communication: 4G or a LAN connection. At underground sites, check reception in advance.

Maintenance and SLA

A fast charging station that doesn't work means lost revenue and damage to the location's reputation. Before signing, ask for a written service level agreement (SLA) that defines: fault response time, repair time, remote monitoring, preventive maintenance (cleaning filters and fans, checking cables and connectors), and who holds spare parts. The Electricity Administration guidelines require an inspection by an inspecting electrician before first operation and a repeat inspection at least once every six years.

How much does a DC charging station cost? Hardware price vs. total cost

Hardware prices in our store (as of 11/2026, for the station only, without installation): DSG-5120 20kW ₪9,428; DSG-5130 30kW ₪15,328; DSG-5140 40kW ₪22,408; DSG-5240 40kW public ₪24,900; DSG-5260 60kW public ₪34,990; portable models DSG-5020 ₪10,990 andDSG-5030 ₪14,990. Additional 60kW public stations, 120kW, 180kW and 240kW stations, stations with an advertising screen and the portable station with storage are sold by quote, according to configuration.

But the station price is only part of the cost. A full budget includes:

  1. Site survey and electrical design by an engineer or certified electrician.
  2. Payment to the IEC for a connection upgrade or a new connection, and sometimes a transformer and high-voltage infrastructure.
  3. Electrical panel, circuit breakers, protections and feeder cables (at high power levels, thick and expensive cables, depending on the distance from the panel).
  4. Civil works: concrete foundation, excavation, trenches, asphalt restoration.
  5. Parking accessories: protective bollards, stoppers, marking, lighting and signage.
  6. Credit card terminal and management system (license or monthly subscription), and cellular communication.
  7. Inspection by an inspecting electrician and approvals before operation.
  8. Service and maintenance agreement, warranty extension and spare parts inventory.
  9. Ongoing electricity cost according to your tariff, including the demand charge during peak hours.

The ratio between the components varies greatly from site to site. A site that already has a large connection and a panel close to the parking area can cost a fraction of a site that needs a new connection. That's why there is no single “installation price”, and a reliable figure is available only after a site survey.

What should you check with a supplier before buying a DC fast charging station?

  • Warranty: how long, what it covers (parts, labor, site visits) and whether it can be extended. On DSGCharge models the warranty is 24 months according to the product pages, with a paid extension option.
  • Spare parts in Israel: power modules, cables and connectors wear out. Check that they are in stock in Israel and not ordered from abroad.
  • Service in Israel: nationwide service teams, a fault call center and remote monitoring.
  • Connector compatibility: CCS2 is the baseline. DSGCharge DC stations are ordered with a CCS1 or CCS2 connector, your choice. The Electricity Administration guidelines (11/2025) prohibit using an adapter for an EV connector, so if you expect vehicles with the CCS1 standard, order a station with the matching connector instead of an adapter solution.
  • Compliance with standards: IEC 61851-23 for the station, IEC 62196 for the connector, DC leakage protection and a manufacturer or importer declaration.
  • OCPP and software: supported OCPP version, ability to work with an external management system, remote software updates.
  • Power allocation: what the power per connector is when two vehicles are connected.
  • Durability: ingress protection rating (IP55 on our public models), heat resistance and cable length.

Why buy a DC fast charging station from the importer?

When you buy from the importer, the party that sold you the station is also the one holding the technical know-how, the relationship with the manufacturer and the spare parts. There is no chain of distributors in which every fault passes through several hands, and the price doesn't include layers of middlemen. With DC stations, where every day of downtime costs money, this is the key difference.

DSGCharge, part of S.M.C. Dor HaAtid, has been active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own – from home stations to an ultra-fast charging station of up to 480 kilowatts (to order; up to 240kW in the store). About 20,000 chargers and charging stations sold and installed; we provide nationwide installation and service with dozens of teams. Beyond sales, we build, manage and maintain public charging networks: the location owner provides the space, and we take care of the rest. You'll find the full range on the page EV charging stations.

And what if there's no large electrical connection?

Some sites can't get a connection upgrade within a reasonable time. Two alternatives: portable DC stations (DSG-5020, DSG-5030) for a fleet, a garage or roadside rescue, andPortable 30kW station with energy storage DSG-5230, which charges from the grid at low power and stores energy for charging. And in locations with foot traffic, stations with an advertising screen (DSG-7060, DSG-7080) add a revenue source beyond selling electricity.

Want a proposal for your site?

Tell us where the site is, how many vehicles you expect to charge per day and the size of the existing connection. We'll carry out a site survey, check electrical feasibility and recommend the power, model and operating model. If most of your vehicles park for hours, first read the guide Charging stations for businesses, because AC may be enough. Leave your details to schedule a survey, or check charging times with thecharging time calculator.

Frequently asked questions

How long will each vehicle stay at a DC fast charging station on our site?

This is a key figure for planning parking turnover. For a vehicle with a 60-80kWh battery, charging from 10% to 80% takes, by a conservative estimate, about 50-75 minutes at a 60kW station and about 30-50 minutes at a 120kW station. The actual time depends on the power the vehicle can accept, the charging curve and the battery temperature.

Will a 240kW station charge every vehicle at 240kW?

No. The vehicle receives the lower of the station's power and its own maximum power. A vehicle limited to 100kW will charge at the same speed at 120kW and at 240kW. In addition, when two vehicles are connected, the power is split between the connectors.

How much does a DC charging station cost?

As of 11/2026, hardware prices in the store start at ₪9,428 for a 20kW station and ₪34,990 for a 60kW public station (DSG-5260), without installation. 120-240kW stations are sold by quote. The total cost also includes the electrical connection, infrastructure, payment and maintenance, which are determined in a site survey.

What electrical connection does a 60kW station need?

According to the product page, the DSG-5260 requires a 91 amp three-phase connection, which is an estimated 63 kVA. That's more than double a home 3X40 connection, so in most cases a spare capacity check or a connection upgrade with the IEC is required.

What is CCS2 and is it suitable for all vehicles in Israel?

CCS2 is the European fast charging connector and is found on most new electric vehicles in Israel. Some older vehicles use CHAdeMO and vehicles built to the American standard use CCS1. DSGCharge DC stations are ordered with CCS1 or CCS2, your choice; a matching original connector on the station is preferable, because the Electricity Administration guidelines (11/2025) prohibit using an adapter for an EV connector.

Why is it important for the station to support OCPP?

OCPP is an open protocol for managing stations remotely: pricing, activation, fault monitoring and updates. A station that supports it can be connected to different management systems, so you aren't dependent on a single software provider throughout the station's life.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar