Home EV charging station: which station is recommended and how to choose (2026)

Which home charging station should you choose in 2026? 5 deciding questions, a comparison of models and prices, 7/11/22kW, smart charging stations, safety requirements and placement in the parking space.
A guide to choosing a home charging station. An EV connected to a charger in a modern parking spot.

In short: For most homes in Israel with a three-phase connection, a smart home charging station of 11kW is the right choice: it charges most electric cars at the maximum speed they accept on AC, suits a 3X25 amp connection, and costs less. A station of 22kW is worth the extra cost only if the car supports it, if there's a 3X40 amp connection, or if you plan to share it between two cars. In an apartment building, it's worth choosing a Managed station with RFID, communication and billing per user. In any case – a station approved by the Standards Institution of Israel (SII), with built-in DC leakage current protection, installed by a certified electrician and inspected before commissioning.

📊 The recommended station for your situation

  • Private house, three-phase connection, one car: Smart charging station 11kW.
  • A car that supports 22kW AC, or two cars: 22kW station or Dual station.
  • Home with a single-phase connection: a station of up to 7.4kW (or a connection upgrade).
  • Apartment building or parking facility: Managed station with RFID and Wi-Fi/LAN/4G communication.
  • Backup only, without installation: Portable charger for occasional charging.

5 questions that determine which station is right for you

1. What electrical connection do you have at home?

This is the starting point. With a Single-phase connection (common in apartments and older houses), the maximum power is about 7.4kW. With a Three-phase connection, you can install an 11kW or 22kW station. The connection size also matters: an 11kW station draws about 16 amps per phase, and with a 3X25 amp connection you need to make sure it won't trip the main breaker together with air conditioners and the water heater – or choose a station with load management. More details: Single-phase vs. three-phase station.

2. How fast can your car charge on AC?

Every electric car has an internal charger (On-Board Charger) that limits the AC charging speed. For most cars in Israel the limit is 11kW, for some 7.4kW, and for a few 22kW. A station more powerful than the on-board charger won't charge any faster – so it's worth checking this figure in the car's manual or the importer's specifications before buying.

3. How far do you drive each day?

An average driver covers 40-60 km a day, meaning 7-10 kWh needs to be put back into the battery overnight. An 11kW station does this in less than an hour. Even a 7.4kW station is enough for most drivers – the difference is noticeable mainly after a long drive or when there are two cars.

4. How many electric cars are there – or will there be?

If there is, or will be, a second electric car, it's worth planning ahead: a dual charging station, or a 22kW station that splits the power, and infrastructure that lets you add a station without breaking walls twice. More details: Two electric vehicles at home.

5. Private house or apartment building?

In a private house, a regular smart charging station is enough. In an apartment building, you need a solution that allows identifying each resident, metering and billing by consumption, and later also load management across several stations – in other words, a managed charging station that connects to a management system. Information for buildings: Charging station installation in apartment buildings.

Comparison of DSGCharge charging stations

All the stations below are AC with a Type 2 socket, a 5-meter built-in cable (8-meter option), a 4.3″ screen, built-in AC (30mA) and DC (6mA) leakage current protection, protection against overvoltage, overcurrent, overheating and lightning, and a 24-month on-site warranty at the customer's home. All are approved for use by the Standards Institution of Israel (SII).

Model Power Required connection Communication and activation Ingress protection Price
DSG-1061 11kW Three-phase 16A Bluetooth · RFID, app, Plug&Play IP65 ₪1,590
DSG-1062 22kW Three-phase 32A Bluetooth · RFID, app, Plug&Play IP65 ₪1,790
DSG-1072 22kW Three-phase 32A Bluetooth + Wi-Fi · RFID, app, Plug&Play IP54 ₪2,390
DSG-6012 managed 22kW Three-phase 32A Wi-Fi, LAN, 4G · RFID, app IP54 ₪3,290
DSG-3011 dual 2 × 11kW Three-phase 32A Bluetooth · RFID, app, Plug&Play IP55 ₪5,990
DSG-3012 dual 2 × 22kW Three-phase 64A Bluetooth · RFID, app, Plug&Play IP55 ₪6,490

Prices are for the station only, without installation. How much installation costs and what the total cost is: Charging station and installation price list 2026.

7kW, 11kW or 22kW – which should you choose?

Power Connection Range added per hour of charging* Suitable for
Up to 7.4kW Single-phase 32A About 45 km Home with a single-phase connection, normal daily mileage
11kW Three-phase 16A About 70 km Most homes and cars – the best balance
22kW Three-phase 32A About 135 km (only in a car that supports it) Cars with a 22kW charger, two cars, businesses

* Based on consumption of about 16 kWh per 100 km. In practice, also limited by the car's on-board charger.

More details: 11kW vs. 22kW station.

A “regular” station or a smart charging station?

A basic station only delivers electricity to the car. A smart charging station adds what really saves money and prevents problems:

  • Charging scheduling – charging starts automatically during the cheapest hours (night plan or TOU tariff), even if you plug the car in during the evening.
  • Consumption tracking – how many kWh were charged and when, so you know exactly what charging costs.
  • Locking with RFID or the app – in an open or common parking area, only authorized users can charge. This is the solution for anyone asking how to stop neighbors from using the station.
  • Current adjustment – reducing the charging rate when the home is consuming a lot, so the main breaker doesn't trip.
  • Future readiness – a station with communication (Wi-Fi, LAN, 4G) and support for an open protocol (OCPP) can later connect to the building's management system or to an energy provider.

All DSGCharge AC stations include operation via the app and RFID. More details: Smart charging station · Load management.

Safety and standards: what to check before buying

During 2026, the Electricity Administration guidelines for installing EV charging systems came into effect. Here's what's important to know as a consumer:

  • Standard approval – an AC station must be approved according to the IEC 61851-1 standard in an accredited laboratory. Make sure the station is approved for use in Israel.
  • Leakage current protection (RCD) – every charging point needs a dedicated 30mA type B RCD – or a type A RCD together with a DC leakage current detector. The detector can be built into the station. DSGCharge stations have built-in DC protection (6mA), so there is usually no need for an expensive type B RCD in the panel – the electrician will confirm this according to the design.
  • Dedicated circuit – the station is fed from a separate circuit in the panel, with its own circuit breaker and an isolating switch near the station.
  • Ingress protection and placement – outdoors, at least IP44 ingress protection is required (DSGCharge stations are IP54-IP65), and the operating parts must be 0.5-1.5 meters above the ground.
  • Charging cable – up to 8 meters. No adapters and no extension cables.
  • Pre-commissioning test – an inspecting electrician must check the system before it is first put into operation, and the station owner should test the RCD test button at least once a year.

More information on ingress protection: IP ratings for charging stations.

Where to place the station in the parking space

  • Close to the car's charging port – check which side and which part of the car the port is on, and place the station so the cable won't be stretched or cross a walkway.
  • As close to the electrical panel as possible – every meter of cable adds to the installation cost.
  • Protected from impacts – not in a spot where a car might hit the station while parking. If there's no choice, use a parking stopper or a protective post.
  • A sturdy wall or pole – if there's no adjacent wall, it is installed on a Page or atdedicated enclosure that also protects against vandalism.
  • A place to store the cable – a holder for the connector and cable protects them from damage and water.

A station from the car importer or from a specialist company?

Many car importers offer a station together with the car. Sometimes this is convenient, but it's worth checking: whether the station will also suit your next car (not just the current model), whether it's smart and supports scheduling and RFID, who installs it, what the warranty is and who provides service after installation. A station with a standard Type 2 socket and open communication will serve you even after you change cars.

What should you check before installing a home charging station?

Before ordering an installation, it's worth gathering a few details that determine the complexity of the work and the cost:

  • The parking space: A private parking space, or a fixed space in an apartment building.
  • The distance between the electrical panel and the parking space and the route for running the cable (on the wall, in a conduit or underground).
  • Connection type and size: Single-phase or three-phase, and how many amps. This information appears on the electrical panel or the electricity bill.
  • Household consumption: If air conditioners, the water heater and the oven run together in the evening, it's worth considering a station with load management.
  • The vehicle: What AC charging power it accepts, and how many cars will charge at the station.

Before talking to the installer Take photos of the parking space, the electrical panel and the route between them. In an apartment building, check in advance what coordination is required with the building committee.

How much does installation cost? A standard installation by DSGCharge costs ₪2,490 for a distance of up to 20 meters from the panel (DSG-9903), and ₪2,990 for up to 30 meters (DSG-9904), as of November 2026. What the work includes and when it costs more: EV charging station installation.

Common mistakes when choosing a station

  1. Buying 22kW for a car that charges at 11kW – you pay for heavy infrastructure with no benefit.
  2. Buying a station before checking the connection – and discovering that you need to upgrade the connection or choose a different station.
  3. Choosing a station without RFID in common parking – and anyone can charge at your expense.
  4. Ignoring the length of the built-in cable – 5 meters doesn't always reach the car's port. In that case, order an 8-meter cable.
  5. Installing without an inspection – the guidelines require an inspection by an inspecting electrician before commissioning, and The insurance company may ask for it as well.

Frequently asked questions

What is the recommended home charging station?

For most homes with a three-phase connection – an 11kW smart charging station with an app and RFID, such as the DSG-1061. If the car supports 22kW or there are two cars – a 22kW station or a dual charging station. In an apartment building – a managed charging station with communication.

A 7kW or an 11kW station – which is better?

If you have a three-phase connection – 11kW, because it charges about 50% faster in a car that supports it, and the price difference is small. If the connection is single-phase – a station of up to 7.4kW is the maximum, and it's enough for most drivers.

Is a type B RCD mandatory?

According to the Electricity Administration guidelines, you can use a type B RCD, or a type A RCD together with a DC leakage current detector – and the detector can be built into the station. DSGCharge stations have built-in 6mA DC protection. The final decision is up to the designing electrician.

Can you install a station in a home with single-phase power?

Yes. With a single-phase connection, you install a station of up to 7.4kW (32 amps), provided the connection size allows it. If you want to charge faster, you need to switch to a three-phase connection with the Israel Electric Corporation (IEC).

How do you stop neighbors from using the station?

Choose a station with RFID or app activation, and configure it to charge only after identification. All DSGCharge AC stations support this.

How long does it take to receive and install a station?

Delivery of the station from DSGCharge – up to 5 business days. The installation itself in a private house usually takes a few hours. In an apartment building, or when splitting from the meter or a connection upgrade is needed, the timeline also depends on approvals and on the IEC.

What is the warranty on the station?

24 months on-site at the customer's home, with an option for a warranty extension Up to 5 years.

Will the station suit my next car?

Yes, if it has a Type 2 socket – the standard for all new electric cars in Israel. An 11kW or 22kW station with open communication will also suit cars arriving in the coming years.

Station data according to the product pages on the DSGCharge website, October 2026. Safety requirements – according to the Electricity Administration's “Guidelines for installing an EV charging system” (25.11.2025). The information is general and does not replace design and inspection by a certified electrician.

How much does it cost to install a home charging station?

A standard installation by DSGCharge costs ₪2,490 for a distance of up to 20 meters from the panel (DSG-9903), and ₪2,990 for up to 30 meters (DSG-9904), as of November 2026. The final price depends on the infrastructure and the cable route.

What do you need to prepare before ordering an installation?

Photos of the parking space, the electrical panel and the route between them, the connection type and size (single-phase or three-phase, and how many amps) and the car model. In an apartment building – also coordination with the building committee.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 