Managed charging stations in apartment buildings: setup and management

Charging systems: setup and management

More and more residents arrive at the parking facility with an EV, and the question raised at every residents' meeting is the same: how do you set up charging stations in apartment buildings without overloading the building's electricity, without arguments over the bill and without the committee becoming a collections department. DSGCharge designs, sets up and manages managed charging stations in apartment buildings, from the first survey to monthly collection.

In short: A resident can connect a station to their apartment's electricity with advance notice, but in a building where several residents want to charge, the stable solution is a managed charging system: a shared or dedicated connection, dynamic load management that allocates only the available power, and metering and billing each resident by their consumption. DSGCharge manages collection and transfers the electricity cost to the committee.

Managing a residential tower with dozens or hundreds of parking spaces? See the section further down this page Charging stations in residential towers and managed buildings. All stations are managed fromthe operating system developed by DSGCharge.

What does the law allow a resident who wants a charging station in an apartment building?

As of October 2026, there is still no dedicated law regulating charging stations in apartment buildings. The Ministry of Justice bill passed its first reading in the Knesset in May 2024 and has not yet been completed. In practice, land registry superintendents already apply its principles in rulings. Here is the picture:

  • Dedicated parking connected to the apartment's electricity: According to a ruling by the Tel Aviv land registry superintendent (2023), neighbors' consent is not required. The conditions are written notice to the building committee and all apartment owners at least 45 days before installation, details of the location and infrastructure, minimal impact on the common property and the building's appearance, compliance with electricity and planning laws, and the resident bearing all costs.
  • Connection to the common property's electricity: Under the bill, the consent of a majority of apartment owners and a separate meter are required, and the resident pays the committee for the electricity used.
  • Parking that is common property: Under the bill, the consent of two-thirds of apartment owners is required, and they also set the rules for using the station.

What the bill does not solve: upgrading the parking facility's connection and a system that splits power among several cars. That is exactly the role of a charging management system. It is also important to check the building's bylaws, and in a dispute to seek legal advice. The information here is general and is not legal advice.

What models exist for connecting charging stations in an apartment building?

The IEC's guidelines for power supply configurations for charging stations in apartment buildings recognize three main ways: from the apartment's connection, from the common services panel, or from a separate connection dedicated to charging and ordered by the building committee or a charging provider. The differences between the models are significant:

ModelWhere the electricity comes fromWho pays for the electricityRequired consentSuitable for
The apartment's private meterFrom the apartment's connection, through the shaft or a panel near the meter clusterThe resident, directly on their electricity billAdvance notice to the building committee (45 days)A single resident, when there is spare capacity in the apartment's connection and a reasonable distance to the parking space
Common panel + separate meterA separate section in the building's services panel or a dedicated sub-panelThe committee pays the IEC, and the resident pays the committee by meteringA majority of apartment owners (per the bill)A building with several EVs and spare capacity in the common connection
Dedicated public connection for chargingA new IEC connection dedicated to the charging stations onlyThe system operator or the committee, and each resident by consumptionA committee/general meeting decision, and two-thirds when the parking is common propertyBuildings and parking facilities with many residents, and new buildings planning for the long term

A private meter sounds simple, but every building has limited space in the shaft, the panels and the connection. When each resident runs their own cable, the fifth or sixth resident may find there's no way to connect. In a shared or dedicated model with load management, the infrastructure is built once and serves everyone. For those who still choose the apartment meter, DSGCharge also offers Separate connection from the IEC meter DSG-9907. For a detailed comparison of installation options for a single apartment, see the guide Charging station installation in apartment buildings.

What is a charging management system and why does a building need one?

A charging management system (CMS) is cloud software connected to all the building's stations that manages them as one system. The stations communicate with it over OCPP, the industry's open standard, via Wi-Fi, 4G or LAN, depending on what's available in the parking facility. What the system actually does:

  • Identifies each user (card or app) and meters how many kWh they charged in each session.
  • Splits the available power among the cars connected at that moment.
  • Prioritizes charging during off-peak hours, when electricity is cheaper.
  • Produces usage reports for each user and a tax invoice.
  • Allows remote management, updates and troubleshooting, without the committee having to go down to the parking facility.

That is also the difference between a regular smart station andManaged charging station: a smart station is controlled in the app by its owner, and a managed station is part of a centrally managed network, with load management, permissions and billing.

How does load management work, and why does it save a connection upgrade?

A three-phase AC station can draw up to 22kW. Ten such stations at full load require 220kW, far more than most residential building connections have. For comparison, a 3X25 A three-phase connection provides about 17.3kVA, and a 3X40 connection about 27.7kVA. Without management, the only solution is an expensive connection upgrade, or limiting the number of stations.

dynamic load management solves this: the system measures in real time how much power is available in the connection and allocates only the available energy to the cars. When one car is connected, it receives high power. When more cars connect, the power is split between them. When a car is full, its power moves to the others. This way the system ensures the connection isn't exceeded and the main breaker doesn't trip.

How DSGCharge does it: Before installation, a roughly two-week test of the building's entire electrical system determines how much power can be allocated to charging. After installation, a cloud management system controls the stations via Wi-Fi, 4G or LAN. When there isn't enough power for everyone, an algorithm decides whether to reduce the charging rate and let more cars charge actively, or queue a car until another station frees up power. The enclosure in the parking facility is a sub-distribution cabinet for connecting the residents, and the load management itself happens in the cloud.

Example calculation: a dedicated connection of about 27kW, eight cars that connect in the evening and stay until morning. Over seven night hours about 190 kWh are available, an average of about 24 kWh per car each night. That's enough for most daily driving, without upgrading the connection. How many stations can actually be connected depends on the connection size, residents' charging patterns and the electrical design, so this is checked in the survey. For a deeper explanation, read the guide to load management in charging stations.

Load management also works with the time-of-use (TOU) tariff. According to the Electricity Authority tariff book, peak hours are 17:00-22:00 in winter and the transition seasons and 17:00-23:00 in summer, and the price then is much higher than off-peak. The system prioritizes off-peak charging, so the electricity cost for all residents is lower.

How are residents billed for charging and how is the committee paid?

The point that worries every building committee is the money: who pays for the electricity, how do you know how much each person used, and who chases debts. In a DSGCharge managed system, the committee doesn't deal with this at all:

  1. Measurement: The stations are connected to the building's common electricity through a TOU meter, and DSGCharge reads the meter.
  2. Identification: Each charging session is assigned to the resident who made it, by card or app.
  3. Billing: Each resident is billed for their exact usage, with a usage report and a tax invoice.
  4. Collection: DSGCharge manages collection from the residents.
  5. Transfer to the building committee: The cost of electricity used for charging is transferred to the committee transparently, so the building's account balances.

The result: a fair split, residents without an EV don't fund their neighbors' charging, and the committee receives the money without dealing with invoices and collection. For details of what the report looks like and how the cost is calculated by peak and off-peak hours, see Monthly charging report by TOU meter.

Managed charging stations in apartment buildings: which station suits the parking space?

DSGCharge is the importer of its stations, so the model can be matched to every parking space and every management model. The common stations in buildings:

StationPowerBest forPrice (as of 10/2026)
Managed charging station DSG-6012Up to 22kWManaged system in a building: load management, user identification and billing₪6,990
Smart charging station DSG-1072Up to 22kWPrivate parking connected to the apartment's meter₪2,390
Dual charging station DSG-3012Up to 22kWTwo adjacent parking spaces or a family with two cars₪6,490

On a single-phase or small connection, the station will charge at lower power than 22kW, and that's fine. The actual power is set by the connection, the car and load management.

What does installing a charging station in an apartment building cost, and who pays for what?

There's no single price per building, because the cost depends on the distance between the panel and the parking spaces, the state of the existing connection, the type of infrastructure and the number of stations. What is fixed is the investment model:

  • In managed buildings there are two options for the common infrastructure: If DSGCharge invests in the infrastructure, a 10-year commitment is required, and the committee doesn't need to pre-fund the panel, main cabling and system. If the building invests in the infrastructure itself, there is no commitment period.
  • The residents pay for the connection and installation of the station in their own parking space, and only those who want a station.
  • A resident who joins later connects to the existing infrastructure, without reopening a project in the building.

For an initial estimate of the installation cost in your parking space, use theCharging station installation cost calculator. For an accurate quote for your building, the first step is a Site survey for a charging station in an apartment building DSG-9900 (₪690, as of 10/2026).

What are the steps for installing charging stations in an apartment building?

  1. Survey: A technician checks the existing connection, the panels, the shafts, the cable route to the parking facility, cellular reception and the number of residents interested now and later.
  2. Planning: Choosing the connection model (shared or dedicated), electrical design of the panel and route, setting up load management and choosing stations for each parking space.
  3. Approvals: A committee or general meeting decision according to the connection and parking type, ordering a connection or upgrade from the IEC as needed, and coordination with the management company.
  4. Installation: Building the panel and main infrastructure, then installing a station in the parking space of each resident who joins, by certified electricians, with testing before activation.
  5. Activation: Connecting the stations to the management system, registering residents, setting the tariff and billing, and starting payment transfers to the committee. From then on the system is monitored and managed remotely.

Building committees and charging stations: what does the committee need to decide?

The committee doesn't need to be an electrical expert, but some decisions belong only to it and the residents' general meeting:

  • Connection model: Allow each resident to connect separately to their apartment, or set up one managed infrastructure for the whole building.
  • Infrastructure location: Where the charging panel will stand and how the route will run through the parking facility, with minimal impact on common property.
  • Shared parking spaces: If there are no assigned parking spaces, how the stations are allocated and what the usage rules are.
  • Commitment and operator: Who manages the system, what the commitment period is, and how payment is transferred to the committee.
  • Joining policy: How a new resident joins and who pays for their connection.
  • Safety requirements: An electrician's inspection before activation and insurance, as is customary in buildings.

For information tailored to building committees, including sample decisions and questions to ask before choosing a provider, see the page Home charging station installation for building committees.

How do you plan infrastructure that grows with the building?

A common mistake is planning only by the number of EVs there are today. If two residents charge today and within a year or two four more join, infrastructure not planned for expansion will require reopening trenches and changing the parking facility's electrical design.

That's why the preliminary electrical check examines the main panel's capacity, the location of the electrical enclosure in the parking facility, the distances to the parking spaces and the route for future trenches. This makes it possible to start with two or three stations and install a “backbone” that allows adding stations later without dismantling what's already been done – and the committee doesn't have to repeat the process every time a resident buys an EV.

Charging stations in residential towers and managed buildings

In a residential tower with dozens or hundreds of apartments, a charging station can't be each resident's private project. When the parking facility has several levels, the electricity is shared and management is in the hands of a management company, you need one system that splits the power, meters every charge and bills each resident exactly for what they used.

  • Multi-level parking facility: Central planning of the cabling infrastructure allows adding stations gradually, without reopening walls each time.
  • Zero work for the management company: Collection, invoices and resident support are handled by DSGCharge.
  • Cloud management system: Permissions for each resident, charging history, fault monitoring and reports for the committee.
  • Easy activation: App, RFID card, or license plate recognition by camera.

The process in a tower: Infrastructure survey (electrical connection, panels, parking facility and cable routes), a proposal to the committee and the management company, setting up central infrastructure (charging panel, cabling in the parking facility and a load management system), connecting each resident who joins, and ongoing management: monthly collection, monitoring, maintenance and resident support.

Why choose DSGCharge to set up charging stations in your building?

DSGCharge, part of S.M.C. Dor HaAtid, is an established company, active since 2021. DSGCharge is the importer of its charging stations – the brand is DSGCharge's own – alongside EV accessories. We provide the entire chain ourselves: the stations, installation, management system, collection and service. Dozens of installation and service teams operate nationwide, about 20,000 chargers and charging stations have been sold and installed, and more than 20,000 customers already work with us. The benefits for the building:

  • Preventing overload on the building's connection.
  • The committee does not deal with collection.
  • Fair split based on accurate consumption.
  • Reports for each user and a tax invoice.
  • Remote management and support.
  • One infrastructure that expands with the building.

All our solutions are on the page Charging solutions and service, and installation services for private homes and apartments on the page Installations.

Want charging stations in your building?

Leave your details in thethe contact page and we will get back to the committee or management company with a proposal for a survey and planning. A resident who wants to start alone can order a apartment building installation survey or check the cost in thecalculator.

What is a managed station and OCPP?

A managed station is a charging station connected to the internet (Wi-Fi, 4G or a network cable) and controlled from a cloud management system, not just from one driver's app. The station and the system communicate over an open protocol called OCPP (Open Charge Point Protocol), a kind of “common language” that lets the system identify each user by card or app, grant and revoke permissions, meter each charge, bill by consumption, split the electrical power between cars and fix faults remotely. Because the protocol is open, the management system can be replaced in the future without replacing the stations. This is the right solution for apartment buildings, parking facilities, businesses and fleets. A full explanation, a comparison with a smart station and the protocol versions are on the page Managed charging station.

Frequently asked questions

Can a charging station be installed in an apartment building without the neighbors' approval?

If the station is in the parking space assigned to the apartment and connected to the apartment's electricity, according to a land registry superintendent's ruling no consent is required. Written notice to the committee and apartment owners at least 45 days in advance is required, along with meeting safety and appearance conditions. Connecting to the common property requires a residents' decision.

What is the difference between a smart station and a managed station?

A smart station is controlled in the app by its owner and suits private parking on the apartment's meter. A managed station is connected to a central OCPP-standard management system, which manages load across several stations, identifies users and bills each one by consumption.

How are residents billed for charging in a building?

In a DSGCharge managed system, the stations are connected to the common electricity through a TOU meter. DSGCharge reads the meter, bills each resident for their exact usage, manages collection and transfers the electricity cost to the committee.

Does the building's electrical connection need to be upgraded?

Not always. Dynamic load management allocates only the available power to the cars, so several stations can be connected to an existing connection or a reasonably sized dedicated connection. The survey determines whether the connection is enough or needs an upgrade.

How much does charging station installation in an apartment building cost?

The cost depends on the distance from the panel, the state of the connection and the chosen model. In managed buildings, if DSGCharge invests in the common infrastructure a 10-year commitment is required, and if the building invests itself there is no commitment. The resident pays for the connection and the station in their own parking space. For an estimate, use the calculator on the site or order a survey.

What happens when another resident buys an EV?

With managed infrastructure in place, the new resident connects to it: a station is installed in their parking space, they are registered in the system, and load management also allocates power to their car. No decision or new project is needed for each resident.

Is the system also suitable for a new building still under construction?

Yes. Planning the infrastructure early, during construction, is cheaper and simpler, and allows adding stations later according to demand.

Who handles faults?

The system alerts on a fault, and DSGCharge's service team handles it nationwide.

Additional services

Blog

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?

Quality charging stations

Advanced charging solutions for home and public use

Fast installation

Professional installation teams nationwide

Warranty

Our products come with a long warranty for confidence and peace of mind

Product store

A wide range of quality EV charging products

Accessibility Toolbar