The costliest mistake contractors make when planning charging infrastructure (and how to avoid it)

In new projects, the costly mistake is not a shortage of stations — it is short-term planning. This article explains why EV readiness in a new building must be systemic: infrastructure, communication, load management and future usage allocation, so you don't get stuck in a few years with a parking garage that can't grow.
The costliest mistake contractors make when planning charging infrastructure (and how to avoid it)
The costliest mistake contractors make when planning charging infrastructure (and how to avoid it)

The costliest mistake contractors make when planning charging infrastructure (and how to avoid it)

There is a moment, usually when the parking garage is still on paper, when someone in a meeting says: “Let's prepare a few charging points and be done with it”. On the face of it, that sounds responsible and even progressive. But that is often exactly where the costliest mistake in the project begins: thinking about EV charging station as just another parking accessory, instead of understanding that it is systemic infrastructure that has to live with the building for years to come.

In practice, EV readiness in a new building is not a decision about “how many stations we'll put in now”, but planning how the building will cope with dozens of residents, with a growing number of vehicles, with changing electricity consumption, and with the most Israeli question of all: who uses it, who pays, and what happens when ten more residents join. When you plan for the short term, you may save on a certain budget line today — and pay dearly later, in repeat work, disruption to residents, arguments with the building committee, and limitations that could have been avoided.

That is exactly the difference between ticking the “readiness” box and building infrastructure that really works. For contractors, developers and management companies, this is no longer a technical question. It is a question of planning quality, future usability and real value for the project.

The illusion of “a socket in every parking space”: why a spot solution creates systemic chaos

The most common mistake starts with good intentions: providing a quick, simple answer. Except that the seemingly simple solution — thinking about each parking space separately — later creates a fragmented system. Every resident runs a power line from their apartment, everyone installs a different station, each parking space gets a solution based on its own circumstances, and in the end the parking garage looks and functions like a collection of improvisations.

In a new building this is a wasted opportunity, because at the planning stage you can still create order. You can plan uniform infrastructure routes, a dedicated space for equipment, suitable preparations for communication, and most importantly — thinking about future expansion. Once you don't do this, every later addition becomes an operation: opening trenches again, running cables again, electrical inspections again, coordination again. What could have been orderly planning at the construction stage later turns into an operational and maintenance headache.

The problem is not only aesthetic. It is also electrical. Charging stations should not be added to a building like a kettle in the kitchen. As the number of vehicles grows, the cumulative load on the system becomes a real issue. Without advance planning, the building may quickly reach a situation where there is demand and residents who have bought Electric car — but no reasonable way to let everyone charge without reopening the entire system.

So the right question is not “how many residents need charging today?”, but “how do we build infrastructure today that can serve many more residents tomorrow?”. The answer to that is no longer found at the level of the individual parking space.

Systemic thinking: plan charging infrastructure, not just stations

Proper planning starts with a basic understanding: the parking garage must work as a system. That means not just end points, but electrical infrastructure, routing paths, communication preparations, equipment location, the possibility of expansion, and the connection of all of these to central management. Without this, any future growth will be more expensive, slower and less elegant.

Put simply, if you know that more and more electric vehicles will arrive over time in a new project, you need to plan today for what you don't see in the marketing: not just the first Charging station installation , but the conditions that will also allow the tenth, the twentieth and the thirtieth. This includes thinking about an infrastructure route that won't require taking apart half the parking garage every time another user joins, examining the electrical panels, load distribution, and the ability to control consumption at the system level.

This is where the value of professional thinking comes in. At DSGCharge, we don't just sell a product – we build a complete charging solution: for homes, buildings, businesses and complex projects. In new projects, this approach is especially critical, because the biggest mistake is to look only at the station itself instead of the environment that has to support it for years.

This is also the place to emphasize: general information does not replace an on-site inspection. All infrastructure planning and installation in the electrical field must be carried out by a qualified professional and in accordance with the law. In a new project, precisely because there is an opportunity to plan correctly from the ground up, it is not worth gambling.

The real bottleneck: not the number of stations, but load management

Many developers imagine the future problem like this: “If we want, we'll add another station”. But in most cases, the harder question is not whether another station can be installed, but whether the system can handle more usage without collapsing operationally and without creating an uncontrolled load.

And this is where one of the most important concepts to understand already at the planning stage comes in: Load management. Not as a nice extra, but as a core component. If the building will have dozens of residents charging simultaneously in the future, you cannot assume that each one will always have all the power they want at that moment. You need a system that knows how to allocate, prioritize, balance and control.

It sounds technical, but the implications are very much everyday. Without load management, the system is built as if each user operates alone. In reality, in an apartment building this is almost never the case. There are evening hours, several vehicles returning together, high consumption in the building, and a need to prevent the charging infrastructure from cutting the power to the whole building.

When you plan in advance a system that includes Load management, you get flexibility. You can start at a certain scale and expand in phases. You can allow more residents to use the system without rebuilding everything each time. And you can also create a clear framework with the residents and the building committee: not “everyone for themselves”, but one framework that works for everyone.

The same logic applies to billing. One of the constant sources of tension in buildings is not only whether there is charging, but how consumption is calculated. Who pays for what? How are users separated? If the system was not built from the start with management, permissions, billing and monitoring capabilities, the building committee or management company will find themselves handling issues that should never have reached them at all.

The real price is revealed only a few years after occupancy

One of the reasons such planning mistakes keep recurring is that their price is not felt on handover day. On the contrary, sometimes everything in the project looks organized because there is “readiness” and a sense that the issue has been taken care of. The problem blows up two or three years later, when real usage begins.

Suddenly more residents want to join. Suddenly you realize the route is not convenient for expansion. Suddenly it turns out there is no proper space for equipment or no preparation for communication. Suddenly the cost of expansion skyrockets, not because of the EV charging stations themselves, but because of everything that was not planned around them. And by then the contractor is no longer there, the developer has moved on to the next project, and the building is left to deal with the consequences of a short-term decision.

This is also where the marketing importance of proper planning comes from. Today buyers and residents ask more questions. Not just “Is there readiness?” but “What exactly was prepared?”, “Can it grow?”, “How does it work when more residents join?”. In new projects, good answers to these questions create a real advantage. The right charging infrastructure becomes a significant selling point, especially in projects aimed at forward-looking buyers. It signals serious planning.

So how do you plan correctly? 5 principles for smart charging infrastructure

You don't need to turn every project into a public charging station, but you do need to demand thinking that understands how a new residential project in Israel is supposed to function in a few years, not just on occupancy day. In practice, proper planning examines, among other things:

  1. Planning for expansion: What the future expansion of the system will look like, not just the initial activation.
  2. Central infrastructure: Whether there is preparation for shared infrastructure routes (trenches, conduits) in the parking garage that allow stations to be added easily.
  3. Load management: How the system will cope with load as the number of users grows, to prevent the building's electrical network from collapsing.
  4. Management and control: How user management, monitoring, permissions and allocation of usage costs will be handled as needed.
  5. A systemic solution: Whether the planning suits a building that has to serve many residents over time, and not just a small number of early users.

The point is not “put in as much as possible”, but “plan as correctly as possible”. A project does not have to install everything on day one, but it must avoid a situation where every future phase feels like starting over.

If you are at the planning, supervision or decision-making stage of a new project, now is the right time to build infrastructure that will serve you and the residents for years to come. Instead of relying on general estimates, we atDSG Charging Solutions specialize in building a complete solution tailored to your project – from preliminary planning through installation and operation. Contact us to plan charging infrastructure that becomes an asset, not a problem.

Frequently asked questions

Do you have to install a charging station in every parking space during construction?

Not necessarily. In most cases, the right approach is to build central infrastructure that allows orderly and easy expansion in the future, and to install stations only according to initial demand. The key is smart preparation that supports growth, not full installation in advance.

What is the difference between basic “readiness” and charging infrastructure that is truly ready for the future?

Basic readiness is usually just a power point. Future-ready infrastructure looks at the whole system: cabling and communication routes, expandability, a dynamic load management system, and a platform for managing users and billing. That is the difference between a band-aid and a systemic solution.

How do you handle power management and billing among residents?

The solution is a managed charging system. Such a system includes a load management component that regulates power consumption among the active stations, and a management platform that lets each resident pay exactly for their own consumption, which prevents arguments and ensures fair allocation.

For details on managed charging systems for buildings, including load management and billing each resident by consumption, see the page Charging stations in apartment buildings and residential towers.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar