A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building

A guide for building committees or management companies dealing with a second resident who buys an electric vehicle, after charging infrastructure has already been installed for a previous resident. What to check, how to manage loads and power allocation, and when to go back to the installation company.
A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building
A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building

A second resident bought an electric car: what happens to the charging infrastructure you've already installed in the building

About six months ago, the building committee installed a charging station for a resident on the third floor. Everything worked fine, the electrician closed the file, and nobody thought about it again. Until a week ago, when a resident from the first floor announced that she's buying an electric vehicle and is also asking for a charging station in her parking space. In most cases, the building committee simply didn't know how to respond – is this like adding another air conditioner, or is there a much more fundamental question here that concerns the building's entire electrical infrastructure?

This is exactly the point where many building committees and property management offices go wrong. A single charging station, installed as a one-off project for one resident, isn't necessarily ready to take on a second or third resident. The difference between “connecting another station” and “building a system that can handle several users” is the difference between a solution that works today and collapses in a year, and infrastructure that grows quietly with the building.

What actually gets checked when another electric vehicle joins the building

When the first station was installed, someone surely checked how much additional load the building's main electrical panel could take. That check was based on the consumption of one vehicle charging, at certain hours, at a defined power. As soon as a second resident enters the picture, those assumptions are no longer enough. The key question isn't “is there room for another station in the parking area” but “is there additional room in the electrical panel, and under what conditions”. This includes checking the size of the building's main meter, the connection type (single-phase or three-phase), and what actually happens if two vehicles charge at the same time in the evening, when other apartments are also running air conditioners, electric water heaters and ovens. Infrastructure designed “in advance” during the first installation, with growth in mind, handles this scenario relatively easily. Infrastructure designed solely for the needs of one resident, without an eye to the future, may require significant infrastructure work at this stage – not just connecting another station.

Shared load vs. electrical infrastructure in the entrance room

One of the first questions a building committee needs to ask is where the existing station is actually connected – to the building's main electrical panel, or to that resident's private electricity inside their apartment. This changes everything. If the first station was connected to the private electricity of the third-floor resident, there is still no “building system” here – there are simply two separate private installations, each dependent only on that apartment's private infrastructure. In that case, the resident who wants a new station will need a separate check of her own electrical infrastructure only, regardless of the previous installation. But if the first installation was done from the building's common electrical panel – for example, through a sub-panel allocated to the parking area – then every additional station “shares” the same power source with the existing station. This is where the question of load management comes in: a system that properly manages the distribution between several stations can prevent a situation in which two vehicles charging at the same time blow a fuse, cause a voltage drop, or affect the regular electricity consumption of other apartments in the building.

What happens when more residents join in the future

A second resident is exactly the test – of what will happen when there are three, four or ten. In many apartment buildings, one electric vehicle is just the beginning. If the infrastructure is planned per resident each time from scratch, without an overall view, the building committee may find itself going back to the same infrastructure check again and again, and ordering partial dismantling and installation work that makes the overall process more expensive in the long run. In contrast, a managed charging system for apartment buildings is built from the ground up to address this scenario: it allows dynamic power distribution between all connected stations, so that when one vehicle charges alone it has access to higher power, and when several vehicles charge at once the system distributes the available capacity among all of them without exceeding the building's electrical limit. This changes the question from “is there room for another station” to “how do you add another station to a system that already knows how to expand”.

What changes in permission and billing management when there's more than one user

As long as there was only one resident with a charging station, there was no need to think too much about questions of access permissions or billing separation – it was one station and one user. As soon as a second resident comes in, things get complicated: who uses whose station, how do you prevent an unknown person from connecting, and how does each resident get billed accurately for their own consumption rather than for shared consumption settled informally among all the residents. This is where tools come into the picture such as permission management via an app, user identification (for example, with an RFID card), and payment processing and billing that let each resident see exactly how much they consumed and pay for it separately. OCPP-based communication also lets the management company see the status of all stations remotely, identify faults and make sure the system is working as planned – without needing a physical on-site check every time something looks wrong.

When exactly should the building committee go back to the installation company

There's no need to “fear” every new request from a resident, but there is a clear moment when it's worth stopping and getting a professional check before moving on. That moment is exactly when a second resident appears. It's the first sign that the single station is about to become an ongoing need of the building, not a one-off project. A professional infrastructure check at this stage examines how much spare capacity there is in the building's electrical panel, whether it's worth upgrading the sub-panel or installing a load management system that will optimize the existing distribution, and which solution suits the number of residents who are already showing interest – not just the two who have asked so far. A building committee that orders this check early, before approving the second resident, saves itself the need to dismantle and reinstall a few months later when a third resident joins.

A checklist for the building committee before approving an additional station

  • Check whether the existing station is connected to the building's common electrical panel or to the resident's private electricity
  • Find out the size of the building's main connection (single-phase or three-phase) and the actual spare capacity
  • Ask whether other residents are already planning to buy an electric vehicle in the near future
  • Consider whether it's right to install another single station, or to switch to a managed charging system with load management between all the stations
  • Check how billing and separation between residents will be handled – and don't leave it as a verbal agreement
  • Make sure the installation is carried out by a certified professional in accordance with the requirements of the law and the standard, including coordination with the building's electrician

A building committee facing this question doesn't have to solve it alone. DSGCharge supports apartment buildings with infrastructure checks before adding stations, and in choosing a solution that suits the expected number of residents – including charging systems with load management for buildings that expand gradually without requiring a full upgrade every time another resident joins. Anyone who wants to understand the available range can also browse theCharging station and accessories store to get a general sense before a consultation.

If your building already has one charging station and a second request comes in, this is the right time to check the infrastructure before giving approval – not after a problem is discovered. Seeking professional consultation at this stage lets the building committee understand exactly what the current situation is, and which charging solution will properly serve both the second resident and the residents who follow.

What happens if the existing infrastructure wasn't designed to take on an additional resident?

In that case there are usually two options: adding a separate station with an independent connection, if there's enough spare capacity in the electrical panel, or switching to a managed charging system that distributes the existing power between all the stations in the building. The choice depends on an infrastructure check that maps the actual situation.

Do you need three-phase electricity to support several residents with electric vehicles?

It depends on the total power required and the number of planned stations. Not every building with several residents needs a three-phase connection, but this is one of the questions checked in the infrastructure check before deciding on the right charging solution.

Who is supposed to pay for upgrading the infrastructure when another resident joins?

This is a question of residents' agreement and the management of the apartment building, not a technical issue. Professionally, it's worth first getting an infrastructure check and a clear proposed solution, and only then discussing in the building committee how the costs will be divided among the residents who use it.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 