Not just a few minutes: how home charging and a fast charging station change your daily routine in completely different ways

A new EV driver discovers that the difference between home charging and a fast charging station isn't just technical – it shapes their entire daily routine. A practical guide that focuses on habits, day planning and independence, not just technical specifications.
Not just a few minutes: how home charging and a fast charging station change your daily routine in completely different ways

Imagine an ordinary weekday evening. You've come home after a day at work, the electric vehicle pulls into the parking space, and you face a question most new drivers don't think about before buying: what actually happens now? Do you plug the vehicle in for the whole night and forget about it, or do you need to think about it like a refueling stop – something that happens quickly, in a specific place, and then it's over?

This is exactly where most guides miss the point. They explain power in kilowatts, estimated charging times and technical terms, but they don't answer the real question: how will this affect your day-to-day life. The difference between home charging and a fast charging station isn't just a difference in speed – it's a difference in an entire daily routine.

You can compare DSGCharge's 11kW and 22kW home charging stations on the Home charging stations.

When charging becomes something that happens in the background

A home charging station is built on a completely different principle from a fast charging station. It isn't designed to give you enough range in a short time – it's designed to disappear from your mind. You come home, plug in the vehicle, and it charges slowly overnight while you sleep, eat dinner or simply carry on with your routine. In the morning the vehicle is ready, just like your phone is ready after you've charged it overnight.

That's the essential difference: a home charging station doesn't require you to plan anything around it. There's no waiting, no special trip, no need to stop what you're doing to “take care of” the vehicle. Charging simply happens, just like the electricity in your home simply flows when you flip a switch.

A fast (DC) charging station, by contrast, is built the exact opposite way – it's designed for moments when your time is precious and you need a significant amount of range in a relatively short time. It isn't supposed to be something you repeat every day, but a solution for specific moments in life: a long trip, a busy day when you weren't home, or a situation where you simply didn't plan ahead.

Why a daily habit shouldn't rely on fast charging stations

One of the common mistakes new drivers make is thinking of the fast charging station as the permanent solution, because it's “more powerful” and sounds more efficient on paper. In practice, the logic is the reverse. A fast charging station becomes useful precisely when you have a specific, focused need – not as a way to manage a fixed routine. A driver who relies on a fast station as their daily base finds themselves planning their day around the station's location, its availability, and whether it's free when they arrive. That's the exact opposite of the original purpose of an electric vehicle – freedom of movement without depending on a fuel station.

Home charging, on the other hand, makes the electric vehicle a natural part of the home, just like the refrigerator or the air conditioner. It doesn't require you to step out of your routine to “look after” the vehicle – it simply blends into it.

How this affects planning long trips

This is where the practical difference that most confuses new drivers comes in. When you have a home charging station, you head out every morning with a “full” vehicle – just as if you'd filled up the evening before and didn't need to think about it again. It completely changes the way you plan your day: no need to check how much is left, no need to calculate whether it will “last” until evening. But when it comes to a long trip – say, an intercity drive or an outing that requires more range than the vehicle holds – that's where the fast charging station comes into the picture. It lets you stop, charge a significant amount of range in a relatively short time, and continue on your way. That's exactly its role: to bridge the gap between everyday driving and trips that go beyond the routine. A driver who understands this difference in advance won't be surprised by a situation where they depend on a fast station for things that should be simple, like driving to work.

What actually determines the right choice

The choice between focusing on home charging and relying on public charging stations depends on a few simple questions worth asking yourself before you settle into a habit:

  • How many kilometers do you drive on average per day, and how much of that repeats every week?
  • Do you have convenient access to a fixed parking space at home or in a building where a station can be installed?
  • How many times a month do you make long trips that go beyond your usual range?
  • Does your routine include days when the vehicle doesn't “come home” in the evening?

In most cases, the answer for a private driver is a combination: a home charging station for the regular routine, and fast or public charging stations for the exceptions. It isn't “either-or” – it's a matter of understanding what is meant to serve what.

This is exactly where proper advance planning comes in. At DSGCharge we see many new drivers who come to us after a few months of using their vehicle and realize they should have checked their home infrastructure right at the start – before they developed habits based on depending on public charging stations. The difference between a driver who feels the electric vehicle “serves” them and a driver who feels they're chasing charging stations usually starts with this decision.

What actually happens when you check your home before installation

A driver who decides to focus on home charging needs to go through a stage that isn't always clear in advance: an infrastructure check. This isn't an unnecessary formality – it's exactly what determines whether the installation will be safe and suited to your actual needs. The check examines several factors: the type of existing electrical panel in the home, whether the connection is single-phase or three-phase, the distance between the panel and the parking space, and whether additional work such as conduits or digging is needed to reach the installation point. This process is especially important because it also determines the final cost of the installation. The price varies depending on the type of station chosen, the required power, the distance from the electrical panel, the type of connection, and the complexity of the physical work involved – including cases that require digging, drilling or adjustments to the electrical panel. No two homes are the same, so there's no uniform price that suits everyone. This is exactly the stage where professional guidance makes the difference. At DSGCharge, a professional infrastructure check is carried out before every installation, reviewing the relevant parameters together with the customer – so that the station installed truly suits their driving and charging pattern, and not just what looks most “powerful” on paper. It's important to emphasize: all electrical work of this kind must be carried out by a qualified professional and in accordance with the requirements of the law and the standard.

Building a routine that doesn't depend on chance

The simplest way to know whether you're set up correctly is to ask: do I rely on my regular charging, or am I always checking “how much is left”? A driver with a suitable home charging station hardly thinks about it – just as people don't think about charging their phone every day, they simply do it. By contrast, a driver who tries to “manage” life around public charging stations, even fast ones, is in a constant state of planning and calculating. That doesn't mean fast charging stations are a worse solution – they're a solution for something else entirely. The mistake is trying to use an emergency solution as the basis for an everyday routine.

What's your next step

If you're at the stage where the electric vehicle is already part of your life but the routine still doesn't feel natural – now is the time to check your home infrastructure and see what really suits your driving pattern. There's no need to keep guessing or relying on public charging stations as a permanent solution. At DSGCharge you can start with a compatibility check for installing a home charging station, in which we review together the existing infrastructure, your charging needs, and the solution that will actually suit you – whether it's a single-phase connection, three-phase, or a specific power rating that suits your vehicle and your routine. You can start by browsing theEV charging stations suitable for the home, or contact us directly for advice and a compatibility check of your charging solution.

Frequently asked questions

Is a 7kW home charging station enough for everyday use, or do you need something more powerful?
In most cases of ordinary everyday driving, a home charging station that suits the home's existing infrastructure is enough to fully charge the vehicle overnight. The right power rating for you depends on the type of connection in the home (single-phase or three-phase) and your personal needs, so it's recommended to check this with a professional before choosing.

Do I need both a home charging station and fast charging stations?
Most private drivers combine the two: a home charging station for regular everyday use, and fast stations for long trips or exceptional situations when the vehicle wasn't charged at home. One isn't a substitute for the other – they are two solutions that serve different purposes.

How long does it take to install a Home charging in a private house?
The installation time varies depending on the complexity of the work – the distance from the electrical panel, the need for conduits or additional work, and the type of station chosen. Each case is assessed individually as part of the infrastructure check before installation.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar