EV readiness in a new building: the developer's guide to avoiding costly mistakes down the road

In a new project, "leaving an empty conduit" for electric cars is no longer a strategy. It's a recipe for expensive problems down the road. This guide explains how to plan charging infrastructure properly from the ground up: load calculation, choosing between a central and an individual system, and preparation that will increase the property's value and serve residents for years to come.

EV readiness in a new building: the developer's guide to avoiding costly mistakes down the road

At the frame stage of a new construction project, when everything is still open and accessible, it's easy to postpone decisions. Another conduit, another cabinet, another small “provision” in the parking garage — it seems we'll sort it out later. But in EV charging especially, the decisions that get postponed are the ones that come back as the most expensive mistake. As soon as the first resident asks to install EV charging station, the conversation is no longer about a single power point, but about infrastructure, load distribution, management, and the building's ability to expand without tearing up half the parking garage.

The need is already here. The question isn't *if* residents will need to charge, but *when* and how many of them will want to do so at the same time. Projects that treat charging as an “extra” rather than an integral part of infrastructure planning build themselves a limitation that will surface exactly when demand starts to rise. Proper planning in advance, on the other hand, saves not only money on future infrastructure work, but also disputes between residents, dangerous improvisations, and an electrical bottleneck that will limit the property's value.

Beyond an empty conduit: what is real “provision” for electric cars?

One of the most common mistakes in planning new parking garages is thinking that leaving empty conduits or a basic pass-through point solves the issue. On paper it sounds reasonable, but in the field it's a recipe for chaos. Charging stations are not standalone devices; they are the endpoint of a system that needs to receive electricity, distribute it correctly, prevent overloads, and allow more users to connect in the future.

When you leave only a general “option”, without planning the full route from the main electrical panel, through sub-panels and to each parking space, the building gets only a partial foundation. The result? When residents start requesting installations, each one becomes a separate project. One installer drills here, another runs a cable tray there, and soon the new parking garage fills up with a “spaghetti” of cables, with no central logic and no ability to manage it. In a modern parking garage, it simply isn't supposed to work like that.

The important question isn't whether there will be Home charging station one or ten, but whether the building's infrastructure was planned so it can support orderly growth. In a building intended for residents who are expected to own Electric (and in the future perhaps two per family), “leaving room” isn't enough. You need to decide in advance *how* the building will manage its charging setup, not just how it will run a single cable.

This is exactly where systemic solution thinking comes in. A company like DSGCharge doesn't just sell equipment, but specializes in planning end-to-end charging solutions – from infrastructure planning, through Charging station installation to advanced management systems. This approach is especially essential in new projects, where the foundations can be built correctly from the start.

Load planning: the key to a parking garage that won't “crash” electrically

Every discussion about charging in a new building eventually comes down to the key question: how much electricity really needs to be allocated? The tendency is to look for a magic number, but that approach leads to planning that is expensive or insufficient. The answer depends on the nature of the project, the number of parking spaces, and the expected rate of expansion.

The common mistake is to calculate as if every parking space needs to receive a fixed maximum power all the time. In reality, not all cars charge together, not all need the same rate, and not every resident comes home with an empty battery. So the right conversation isn't just “how many kilowatts to allocate”, but how to implement a Load management system that will use the existing infrastructure in the most efficient way.

System Load management that is dynamic works like air traffic control for electricity. Instead of allocating a separate, fixed “lane” to each car, it manages the available power and distributes it in real time between the active charging stations. This way, even if the building's electrical connection is limited, the system can efficiently serve a large number of cars without causing the system to crash or exceeding the allocated power.

For contractors and developers, the advantage is twofold:

  1. Savings on infrastructure costs: Instead of upgrading the main electrical connection at high cost, you can maximize what already exists.
  2. Future flexibility: The system makes it possible to keep adding more Charging stations in the future on the basis of the same central infrastructure, without complex work.

Poor load planning doesn't just harm the future – it also complicates the present. An electrical cabinet that wasn't prepared properly or feeder lines that weren't designed for growth turn every additional station into an expensive project. This is where a small saving today becomes a large, cumulative expense tomorrow.

A central system vs. individual provisions: a decision that determines the building's future

At first glance, an individual provision for each resident sounds simple: everyone will install whatever they want in the future, whenever they want, and connect to their private meter. The problem is that in a residential building, this simplicity falls apart very quickly. Once there are ten residents with ten stations, ten different installers and ten improvised cable routes, the parking garage becomes impossible to manage, maintain or expand.

By contrast, planning a central system in advance changes the whole picture. Instead of each resident “inventing a solution”, there is a single infrastructure logic:

  • Orderly feeder routes from a dedicated electrical panel.
  • Planned connection points that make it easy to add stations.
  • Management and control of total electricity consumption.
  • The option of orderly billing of residents by consumption, which prevents disputes over the common electricity bill.

This doesn't mean every building has to set up a full system for 100% of the parking spaces on day one. But it does mean that the central framework must be planned already at the construction stage. The real value of a new project lies in its ability to grow. A well-planned system gives the building management peace of mind, increases the property's value, and solves not only the charging question but also the question of control and order.

Choosing the right equipment: how do you make sure the infrastructure is still relevant in 10 years?

Once we understand the infrastructure, the equipment selection stage comes. Here too, it's easy to fall into the thinking of “we'll choose a powerful station and that's it”. But EV charging station needs to suit not only the car, but also the building's infrastructure, the type of use and the management system.

In a new project, it's important to choose equipment that will be “future-proof”. For example, choosing charging stations that support an open communication protocol (such as OCPP) ensures that the building won't be “locked” into a single service provider. This allows the flexibility to replace the management system or add equipment from different manufacturers in the future.

The right equipment is the one that fits the building's growth plan. Not necessarily the most powerful or the most expensive, but the one that can be integrated into a central management system, that provides reliable data, and that offers residents a convenient user experience. The same principle applies to complementary accessories. Smart planning also takes into account details such as how to store The charging cables to keep the parking garage tidy and safe.

And above all, the critical stage is the installation itself. Charging station installation or the infrastructure preparation must be carried out by a qualified professional, in a compliant, orderly and documented manner. In a new building, this is the difference between a system that can be easily managed and maintained, and layers of improvisations that accumulate over the years and endanger the building.

What to do now, before the concrete is poured

If you are developers, contractors, project managers or a management company overseeing a new project, this is exactly the time to ask not “how do we check the provision box”, but “which charging solution will best serve the building and its residents in five and ten years?”.

Instead of postponing the decision until the first resident asks for a station, it's worth examining now what's right for your specific project: what scope of provision is required, how to plan the infrastructure routes, whether a central system is the right choice, and how to create a foundation that allows stations to be added in the future without turning every request into expensive infrastructure work all over again.

Proper planning isn't an expense – it's a direct investment in the property's value and residents' satisfaction. If you want to build an orderly plan for your project – not a general estimate, but a solution tailored to the building, the parking garage and the expected expansion – we at DSGCharge will be happy to help. Contact us today and let's plan the charging infrastructure for your next project together.

Questions that come up in almost every new project

Is it enough to prepare an empty conduit for each parking space?

In most cases, no. Conduits are only a small part of the picture. Real provision includes planning feeder routes from a dedicated electrical panel, allocating space for communication and electrical cabinets, and planning a load management system in advance. Without these, the conduits are only a partial solution that will complicate expansion in the future.

Does every new building need a central charging system from day one?

You don't necessarily need to install stations in every parking space from day one, but it's highly recommended to plan the central *infrastructure* in advance. You can start with a limited number of stations and expand in stages, as long as the foundation (feeder lines, cabinets, provision for load management) was planned to support future growth.

How do you plan for future electricity consumption if you don't know how many electric cars there will be?

That's exactly why a dynamic load management system is critical. Instead of allocating huge, expensive electrical power based on an extreme scenario, the system smartly manages the existing power and distributes it between the active users. This way, a growing number of electric cars can be supported on relatively limited electrical infrastructure.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 