Replacing your electric vehicle in two years? How to make sure your charging station isn't left orphaned

A guide for homeowners, or owners of an existing charging station, who plan to change their electric car in the future. How to plan an installation today that won't become obsolete tomorrow, what stays the same and what changes between models, and what's important to check before buying.
Replacing your electric vehicle in two years? How to make sure your charging station isn't left orphaned

A situation that comes up much more often than you'd think: a family installs a EV charging station for its first car, and after a year or two replaces it with a different car – a different manufacturer, a different model, and sometimes a different charging provider too. Then comes the question that bothers quite a few people: does the installation I did suit only the car I had, or will it also serve me with the next car?

It's a legitimate question, and especially relevant for anyone at the decision stage – about to install a home charging station, and wanting to know they aren't “locking” themselves into one car. The short answer: in most cases, a properly installed charging station doesn't depend on a specific car, but on the home's infrastructure and the accepted charging standard. But there are a few points worth understanding before deciding.

What's fixed in a charging station, and what changes from car to car

A home charging station (AC) is based on a plug and a connection to the home's electrical grid – not on a protocol unique to a particular car manufacturer. In other words, a station that is properly connected to the electrical infrastructure and designed with the right power can, in principle, serve different electric cars, as long as it's standard AC charging. What really determines compatibility between the station and the car isn't the manufacturer's name, but a few technical parameters:

  • The type of connector/charging cable required (and here there are differences between models and model years)
  • The power the car can actually accept (different cars support different charging power levels)
  • Whether it's a single-phase or three-phase connection, which affects the actual charging rate
A charging station that was chosen and designed correctly from the start – with a suitable cable, reasonable power for the home's infrastructure, and the option of a three-phase connection if the infrastructure allows it – will usually keep serving you even if your next car is a different model or manufacturer. The problem starts when the installation was done “exactly” for a specific car, without any planning margin, and then a change of car may reveal limitations that weren't known in advance.

Why worrying about an investment becoming obsolete is a good sign, not an exaggerated concern

People who plan to change cars in two or three years, and still stop to ask this question before installing a charging station, are actually taking the right step. The common mistake is the opposite: installing quickly, “just to have it”, without checking what does and doesn't depend on the current car. In such cases, when a new car arrives, it turns out that the power chosen was lower than what the new car can use, or that the cable chosen doesn't suit the required connection, or that the station's physical location isn't convenient for a car with a different charging layout.

The right logic is the opposite: plan the installation around the home and the infrastructure, not just around the current car. A charging station is an investment in fixed infrastructure in the home – a power line, a location, spare capacity from the panel – while the car is the variable that can change again and again. Once the installation is built around what the home allows and not around a specific technical detail of one car, the chance that it will also serve the next car increases significantly.

What you actually need to check before installation when you know you'll change cars in the future

If you know that your current car won't necessarily be the only car you'll own, there are a few questions worth raising at the planning stage, not just “afterwards”:

  • How much spare electrical capacity is in the home's panel – this determines whether there's room for higher power in the future, even if you don't use all of it right now
  • Whether the installation is single-phase or three-phase – a three-phase connection, when the infrastructure allows it, gives greater flexibility for future power levels
  • The cable length and the station's actual location – the right placement relative to the parking space, the driveway and the connection angle depends less on a specific model and more on the geometry of the site
  • Whether the station itself supports the common connector type – and not a proprietary connector relevant to only one manufacturer

Combining these checks gives a clear picture: if the infrastructure was planned with a little “breathing room” – power that can also support a car that needs more, and a connection that allows flexibility – the installation will remain relevant even when the car in the parking space changes.

Where DSGCharge comes into the picture

This is exactly the point where proper planning from the start makes the difference between an investment that stays relevant and an investment that needs to be “fixed” after a year or two. AtDSGCharge , an essential part of the work is checking the infrastructure before installation – not just to see what suits the car you have today, but to understand what the home's panel, meter and connection allow, and to design the station accordingly. This includes addressing the question of single-phase vs. three-phase, choosing a suitable power level, and choosing a cable and equipment that aren't “locked” to a single car model.

Working with private customers who install a home charging station starts exactly at this stage – understanding the infrastructure and needs, not just a one-off match to the car they currently own. That's the difference between an installation that looks at the current car and planning that looks at the home as a long-term asset.

What actually happens when you change cars after the station is already installed

Suppose the installation was done correctly – reasonable power, three-phase if the infrastructure supported it, a standard cable and connection. In that case, switching to another car generally doesn't require any change to the station itself. What may change is mainly an accessory – for example, a charging cable or adapter, if the new car requires a different connection from the one that suited the previous car. This is a small adjustment, not a reinstallation project.

On the other hand, if the installation was done on a minimal basis – for example, power that was too low, chosen “to save money”, or a single-phase connection where three-phase would have been possible and suitable – a change of car may reveal that the initial investment wasn't flexible enough. That's why an early check, before installation, is worth more than any fix after the fact.

A short checklist before installing, when you know there will be a next car

  • Check the spare capacity in the electrical panel, not just the immediate need
  • Ask whether a three-phase connection is possible, if the infrastructure allows it
  • Choose a station with a common standard connector, not one dedicated to a single manufacturer
  • Document the location, cable length and distance from the panel – for future planning
  • Ask which part of the installation will stay the same and which (for example, the cable) may need adjustment

If you go through this list before scheduling an installation, you're effectively ensuring that your investment in the charging station stays “open” to the future, rather than closing around one car.

About price and installation planning

The price of installing a home charging station varies according to several factors: the type of station and the power chosen, the station's distance from the electrical panel, whether it's a single-phase or three-phase connection, the need for conduits, excavation or chiseling, the required cable length, and the actual complexity of the installation in the specific home. There's no way to give an exact price without checking the actual infrastructure – which is why a preliminary check is an integral part of a proper process, not an unnecessary step.

It's also important to remember that an electrical installation of this kind must be carried out by a qualified professional, in accordance with the requirements of the law and the standard – this isn't work suitable for DIY.

How to move from the question stage to the decision stage

If you're at exactly this point – you have an electric car, you intend to install a home charging station, and you know the car itself may still change – the next step isn't to choose a station “according to what's written on the current car”, but to check the home's infrastructure and plan accordingly. At DSGCharge you can get advice that starts precisely from this point: what's in the home, what's possible in terms of power and connection, and which station will serve you even when the next car arrives in the parking space. You can browse theEV charging stations available in the store, and if needed also thecharging cables and accessories, and contact us for a compatibility check before deciding.

Frequently asked questions

If I change cars, will I need to install a new charging station?
Not necessarily. If the existing station was designed with power and a connection suited to the home's infrastructure, it will usually continue to serve a new car as well. In some cases, a different cable or adapter may be needed, depending on the new car's connector type.

What's the difference between single-phase and three-phase, and why does it matter for a future car?
A three-phase connection usually allows greater flexibility in charging power levels, so if the home's infrastructure allows it, it provides a better planning margin even if the next car requires higher power than the current one.

How do I know if my installation is “open” enough for the next car?
A check that addresses the spare capacity in the electrical panel, the connection type (single-phase/three-phase) and the connector type on the station gives a clear answer. It's a check that's recommended before installation, not after.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 