Old building, new car: is your electrical infrastructure ready for a charging station?

The switch to an electric vehicle doesn't start with choosing the station, but with checking the building. In older buildings, the challenge is to understand whether the electrical infrastructure, the parking facility and the common electrical panel are built for the new load. Before you move forward, here's what you must check, where most people get stuck, and how to approach charging station installation in an old building the right way.

Old building, new car: is your electrical infrastructure ready for a charging station?

You've bought an electric vehicle, or you're just about to. You've chosen a model, understood the driving range, and maybe even started looking into Home charging stations. And then comes the question that holds back quite a few residents: wait, what about the building? If you live in a building that was built one, two or more decades ago, installing a charging station isn't a matter of “drill and connect.” The process starts much earlier — with a professional infrastructure check, coordination with the building committee, and an understanding of what the situation really is behind the wall, in the electrical panel and along the route to the parking space.

This is exactly the point where many people get confused. They aren't looking for another general explanation about charging, but for an answer to a very practical question: is it possible to install EV charging station without getting tangled up with weak infrastructure, a long distance from the panel, or a building committee that's afraid of a short circuit in the whole building? The answer is yes, absolutely — but it requires proper planning and an understanding of the limitations and options specific to your property.

Why an old building is a different challenge (and what does “old” even mean?)

When we talk about an “old building,” we don't mean only the year of construction. There are older buildings with excellent electrical infrastructure, and there are relatively new buildings whose infrastructure wasn't designed for the loads of vehicle charging. The essential difference is how ready the existing infrastructure is: the condition of the apartment's electrical panel and the common panel, the type of electrical connection (single-phase or three-phase), the physical distance between the parking space and the panel, and whether there are convenient options for routing cables.

In a private house, installing a charging station is usually a relatively simple project. In an apartment building, and especially in an older building, the picture is more complex. Suddenly factors such as common property, an aesthetic and safe installation route, and a critical question enter the equation: what will happen when five more neighbors also want to install a station? A proper installation isn't judged only by “does it work for me now,” but by “is it a stable solution that won't create problems in the future.”

The most common problem isn't the lack of a solution, but jumping too quickly to choosing the station. But charging stations are only the last piece of the puzzle. The real challenge is planning the infrastructure that supplies them.

Mandatory checks before you start: what does a certified electrician actually check?

New electric vehicle owners ask us a lot about power (11kW or 22kW), connection types (single-phase or three-phase) and whether a tethered cable or a socket is better. These are important questions, but in an old building they aren't the first step. The first step is a professional on-site suitability check, designed to answer more basic questions:

  • Condition of the electrical panel: Is there free space in the apartment panel or the common panel? What is the connection size and can it support an additional load? Is the panel itself in good condition and compliant with the standards?
  • Installation route: What is the exact distance between the electrical panel and the parking space? Can a cable be routed aesthetically and safely through walls, ceilings or common areas? Is special drilling or chiseling required?
  • Existing loads: What is the building's current electricity consumption? Will adding a charging station (or several stations) create an overload that trips the power?
  • Planning for the future: Are you the only residents who are interested? Sometimes, planning shared infrastructure in advance can save all the residents a lot of money and mess in the future, compared with “patchwork” installations that each resident carries out separately.

A check like this turns “maybe it's possible” into “it's possible, and this is how to do it right.” For example, a parking space far from the panel doesn't rule out installation, but it affects the cable type, the cost of the work and sometimes also the need for additional protection solutions. All the information in this guide is intended to give direction, but it doesn't replace an on-site inspection by a certified electrician, which is mandatory by law.

The smart solution: load management instead of an expensive infrastructure upgrade

Many residents assume that their building “isn't built for this” and that the only solution is upgrading the electrical connection – an expensive and cumbersome process with the Israel Electric Corporation (IEC). But in many cases, the solution isn't “more electricity,” but smarter management of the existing electricity. This is where the concept of Load management.

A load management system (Load Management) is a smart component that can regulate the vehicle's charging rate according to the overall load on the building's electrical infrastructure. In simple terms: when the building consumes a lot of electricity (for example, in the evening when everyone turns on air conditioners and water heaters), the system automatically slows down the charging rate. When the load drops (for example, in the middle of the night), it returns charging to the maximum rate. The result: the vehicle is fully charged by morning, and the infrastructure doesn't collapse.

In an old building, such a system is often not just a “nice to have,” but a necessary condition for installation. It makes it possible to connect several charging stations to existing infrastructure, prevents power trips and ensures fair distribution of resources. This is the difference between a one-off, ad hoc solution and responsible charging infrastructure that serves all the residents.

How to present the solution to the building committee (and get approval)

Sometimes the big challenge isn't technical but human. Concerns of neighbors or the building committee usually stem from a lack of information. They ask: will they drill through all the walls? Will it damage the common property? Who will pay for the electricity? And is it safe?

To get approval, it's important to come prepared with clear answers, not slogans. Instead of saying “it's just a charger,” explain the process:

  1. Power source: Make it clear that the connection will be made from your private electrical panel (if possible) or through a separate meter, so you pay for your own consumption.
  2. An orderly route: Present a clear plan of the cable route that respects the aesthetics and the common property.
  3. Safety first: Emphasize that the installation will be carried out only by a certified electrician, with all the protections required by the standard.
  4. A solution for the future: If other residents are interested, present the advantages of planning shared infrastructure with load management, as a solution that will serve everyone and prevent a “jungle” of cables in the parking facility.

When the solution is presented as something planned, safe and managed, most objections disappear. A professional company like DSG Charging Solutions doesn't just install the station, but provides all the technical information needed to present a complete, convincing solution to the building committee or the management company.

The common mistake: choosing a product before you've planned a solution

It's very tempting to skip straight to the store, compare specifications and choose the most attractive or most powerful charging station. But in an old building, anyone who starts with the product rather than with the infrastructure check may discover that they bought a station that can't be installed, or that its installation will be much more expensive and complicated than they thought.

The right choice depends on the environment. Two neighbors with the same electric vehicle can have completely different needs because of the parking location, the condition of the electrical panel or the building's limitations. So the right question isn't “which station is best?” but “which complete charging solution (infrastructure + station) is the right and safest one for my specific property?”

The right approach in older buildings is to reduce risks: understand the existing situation, check the infrastructure, plan the installation route, and only then choose the suitable station and power. It may require a little more patience, but it saves delays, arguments and unnecessary expenses later on.

If you live in an old building and are unsure how to proceed, the first step isn't to guess. At DSGCharge we specialize in building end-to-end charging solutions, from a thorough suitability check to installation and support. We'll be happy to help you understand what's really possible in your building, and to plan a solution that will serve you safely for many years. For details and to schedule a suitability check, you're welcome to contact us for an initial consultation.

Frequently asked questions about installation in old buildings

If the building is old, does that mean a charging station can't be installed?

Not necessarily. The building's “age” isn't the only factor. What determines it is the actual condition of the electrical infrastructure, the distance to the parking space and the existing loads. In many cases a safe and efficient solution can be found, such as a load management system, even in older buildings. It all starts with a professional on-site inspection.

Do I have to prepare infrastructure for the whole building now?

Not always. You can start with a private solution intended for one resident only. However, if other residents are interested, or if the electrical infrastructure is limited, it's worth considering planning shared infrastructure that will allow easy and cost-effective expansion in the future and prevent overload.

Who pays for the charging electricity in common parking?

Charging is at your own private expense. The common solution is to connect the charging station to your apartment's electrical panel. When that isn't possible, a Separate electricity meter is installed for the station, so the electricity consumption is clearly attributed to you and isn't shared among all the residents.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 