Before you approach the building committee: what to prepare in advance so your charging station request moves forward

A guide for EV-driving residents who want to approach the building committee with a request to install a charging station: what details to gather in advance, how to involve other residents in the process, and what's important to check before the formal request to the committee.
Before you approach the building committee: what to prepare in advance so your charging station request moves forward

You've got your electric car, and your parking spot has become your own charging point – there's just one step left: getting approval from the building committee. In most cases this is exactly the stage where residents get stuck, not because the committee is opposed in principle, but because the request it receives is too general, lacks details and doesn't give the committee anything concrete to work with.

A building committee, like any body that has to make a decision affecting the whole building, doesn't like uncertainty. “I want to install a charging station” is a request. “I'd like to look into installing a single-phase charging station in my parking space, and I'm willing to fund a professional infrastructure check” is the start of a process. The difference between these two phrasings is exactly what decides whether your request moves forward at the first meeting or gets pushed to the next one – and the one after that.

This article doesn't deal with legal rights or the formal procedure with the committee – those are matters to look into separately with an appropriate professional. It deals with the stage before: what to prepare, check and understand before you even sit down to write the request.

What makes a request to the committee something that can actually be discussed

In most cases, a building committee doesn't oppose a charging station because it's against electric cars. It opposes – or avoids deciding – because the request arrives without answers to questions it's sure to ask itself, or that another resident will ask. Questions like: where exactly will the station be, is there already electricity near this parking space, who will be responsible for the electricity consumed, and what happens if another resident wants a station in a year.

When your request comes with initial answers to these questions – even if they're not final – you move the discussion from “is it even possible” to “how do we do it right”. That's a significant change in the dynamics of any committee meeting.

Professional tip: Try to come to the request with a written draft, not just a message in the building's WhatsApp group. A short document summarizing the request, the rationale and the open questions gives the committee the sense that the matter is serious and has been looked into in advance, and makes it easier for them to pass it on if needed.

What basic information to gather before you approach the committee

Before you write even one word to the committee, it's worth going over a few basic points that will help you phrase a request in language the committee understands:

  • The location of your parking space in the parking garage – next to an exterior wall, inside a parking structure, close to or far from the main electrical panel. This directly affects the complexity of the installation and the length of cable needed.
  • Your household connection type – whether the electricity in your apartment is single-phase or three-phase. This detail will affect which type of station is relevant for you and how the possible power ratings are presented.
  • The condition of the building's main electrical panel – if you know the building has had infrastructure renovations in the past, or that the panel is old, this is information worth sharing right from the initial stage.
  • Whether other residents have already looked into something similar – if so, you already have natural partners for the process.

You don't need to know the exact answer to each of these details – some of them actually require a professional on-site check. But simply coming with awareness of these questions, and not just a general wish “to install a charging station”, changes how the committee perceives the request.

How to involve other residents in the process without complications

In apartment buildings, one of the common mistakes is approaching the committee on your own behalf only, thinking it's “my issue, not everyone's”. In practice, a building committee usually prefers to know whether other residents may request something similar in the near future – because that changes the picture from a single request to overall infrastructure planning.

You don't have to open with a public outreach campaign. A short conversation with a neighbor or two who you know are also considering an electric car is enough, just to check whether it makes sense to present a broader picture to the committee. If it turns out several residents are interested, you can ask the committee to consider, in advance, planning that takes into account that more stations will be added in the future – even if at this stage only you are really moving forward.

Keep in mind: Even if you're the only one approaching the committee right now, one question a building committee will definitely ask is “what happens when another resident wants a station in a year”. An initial answer to this question – even if it's only “we can look at planning that takes future expansion into account” – is worth a lot in the first conversation.

Why a preliminary infrastructure check can change the whole conversation

One of the most direct ways to steer the discussion with the committee toward something practical is to come not just with a wish, but with a professional snapshot of the existing infrastructure. A preliminary infrastructure check – which examines the condition of the electrical panel, the distance from the parking space and the existing load in the building – is what allows the committee to understand what the request actually involves, rather than just discussing it in principle.

This is exactly the role DSGCharge plays for residents starting this process. DSGCharge installs EV charging stations in private homes and apartment buildings, and one of the central parts of the work is a professional infrastructure check before every installation – that is, an inspection carried out on site, not based on general estimates. For a resident who wants to approach the committee with something concrete in hand, such a check can turn the request from a wish into a working document the committee can actually discuss.

It's important to emphasize: the infrastructure check and the charging station design must be carried out by a qualified professional, in accordance with the relevant legal and standards requirements. This isn't a check you can do “by eye” or settle for a general estimate – the condition of the electrical panel, the distance from the parking space, single-phase or three-phase, and a possible need for load management when there are several stations in the building are all variables that need to be examined in practice.

The actual installation cost, when you get to that stage, depends on several factors: the type of station and the power chosen, the distance from the electrical panel, the connection type, whether conduits, digging or drilling are needed, and whether a load management solution is required when the building plans several stations. These are exactly the data an infrastructure check provides – which is why it's an important step before any budget discussion with the committee.

Planning to approach the building committee with a request to install a charging station and want to come with professional information, not just a general wish? You can contact DSGCharge for an initial feasibility check and a solution tailored both to your apartment and to the character of the building.

To understand what DSGCharge offers at the next stage, you can take a look at theEV charging stations available in the store, and also check which charging cables and accessories may be relevant depending on the distance of the parking space from the electrical panel – a detail any serious building committee will ask you about.

If you'd first like to understand who's behind the solution before presenting it to the committee, the About DSGCharge page gives a picture of the areas of work: home AC charging stations, DC fast charging stations, professional installation and charging management systems for buildings with several residents.

What to bring with you to the meeting with the committee

Before you walk into the meeting, or send the request in writing, it's worth going over a short list:

  • A short description of the parking space location and the estimated distance from the building's main electrical panel.
  • A detail about your household connection type – single-phase or three-phase, if you know it.
  • A note on whether other residents have expressed similar interest, even informally.
  • An open question to the committee about the condition of the main electrical panel – you don't have to know the answer, but it's worth asking in advance.
  • A proposal to carry out a preliminary professional infrastructure check, so the committee's discussion is based on data rather than estimates.

A request that comes with this list, even partially, looks different to any building committee – it shows the resident has already thought about the impact on the building as a whole, not just about their personal need.

The process from the building committee to a working charging station takes time and involves several stages. But the right preparation at the first stage – before the first word is spoken at the meeting – is what usually decides whether the request becomes a real project or remains a topic that comes up at every meeting without moving forward.

📊 In brief: key points of the article

1

What makes a request to the committee something that can actually be discussed

In most cases, a building committee doesn't oppose a charging station because it's against electric cars. It opposes – or avoids deciding – because the request arrives without answers to questions it's sure to…

2

What basic information to gather before you approach the committee

Before you write even one word to the committee, it's worth going over a few basic points that will help you phrase a request in language the committee understands:

3

How to involve other residents in the process without complications

In apartment buildings, one of the common mistakes is approaching the committee on your own behalf only, thinking it's "my issue, not everyone's". In practice, a building committee usually prefers to know w…

Frequently asked questions

Can you approach the building committee before you have a final quote?

Yes, and it's even advisable. Most committees prefer to know in advance that there's an intention to look into the matter, and to be involved from the planning stage. An accurate quote depends on an infrastructure check that's only carried out at a later stage.

What happens if the committee asks how this will affect other residents?

That's a legitimate and reasonable question. The more information you bring about the condition of the infrastructure and the possibility of planning that takes future expansion into account, the easier it will be for the committee to discuss it calmly rather than out of concern.

Do you have to involve other residents in the process before approaching the committee?

Not necessarily, but it's recommended to check whether other residents are interested in something similar. This can change the way you approach the committee and turn it from an individual request into a broader infrastructure discussion, which committees tend to take seriously.

Who should check the infrastructure before you submit the request to the committee?

An infrastructure check should be carried out by a qualified professional, in accordance with legal and standards requirements. It isn't something you can self-assess – it requires an actual examination of the electrical panel, the connection type and the distance from the parking space.

How long does it take from approaching the committee until the charging station is actually working?

The time frame varies depending on the complexity of the committee's decision, the results of the infrastructure check and the scope of installation required. An exact timeline can't be guaranteed without examining the specific case.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 