A charging station with an app – does it really matter or is it just a marketing feature

An electric car owner who sees "charging station with an app" on a spec page and isn't sure whether it's a real upgrade or just another button. The article explains what the app actually does, who it makes a difference for and who it doesn't, and when it's worth looking into before buying.
A charging station with an app – does it really matter or is it just a marketing feature?

Someone buys a charging station, reaches the product page, and sees a line that says “includes an app for management and monitoring”. At that moment a natural question comes up: is this something that should really change their day-to-day life with the car, or is it another marketing add-on they probably won't open after the first week? This question is especially relevant for a private homeowner buying a charging station once, not someone managing a vehicle fleet or a public charging station where remote management is part of the business.

The short answer: it depends on the household's charging habits, not on the station itself. In some homes the app will stay unopened for months, and in others it's the first thing checked every morning. The difference isn't in the product – it's in the lifestyle around the car.

Anyone choosing a station for a private house can compare the 11kW and 22kW models on the page Home charging stations in the DSGCharge store.

What an app in a charging station actually does

At the basic level, an app for a home charging station lets you see what's happening at the station without going out to check physically: whether charging has started, whether it has finished, how long it's taking, and sometimes also the history of previous charging sessions. On some stations you can also schedule charging for certain hours – for example, cheaper hours on the electricity tariff, or quieter night hours in an apartment building.

It's not technological magic, and it doesn't change the charging rate or the station's power. The app is a layer of convenience and monitoring on top of the electrical infrastructure – it doesn't replace a proper infrastructure check, and it doesn't solve a problem of power that doesn't suit the car or an electrical panel that isn't ready. Those are still issues that need to be checked separately, before the installation itself.

Who it really makes a difference for, and for whom it's less critical

Try to imagine two different homes with a home charging station. In the first home lives a person with a fixed routine: he gets home at about the same time, plugs in the car, and the car is charged by morning – regardless of whether he checks an app or not. In this case, the app is a convenience, not a need. He can make do with an LED on the station that shows charging is active.

In the second home lives a family with two electric cars and a changing routine, and sometimes someone needs to know whether the car is ready for an early morning drive without going out to the yard to check. Here the app becomes a genuinely useful tool – you can check from the living room or from work whether charging has finished, and you can schedule charging so that the electrical load in the home doesn't clash with other household use at the same time.

The difference between the two homes isn't the station's level of technology – it's how many variables there are in their charging routine. The more uncertainty there is (number of cars, irregular hours, several drivers in the household using the car), the more useful it becomes to see remotely what's happening at the station, rather than just “another feature”.

The cable, the station and the infrastructure – why they're still the core component

There's a tendency to focus on the shiny feature – the app, the screen, the notification sent to your phone – and forget that what determines whether charging will be safe, stable and suited to the household's needs is first and foremost the installation itself. Single-phase vs. three-phase, the distance from the electrical panel, the required cable length, and whether conduits or additional work are needed – all of these affect the installation far more than any question about an app.

At DSGCharge, when a private customer contacts us with a question about a charging station, the first question asked isn't which app the station has, but what condition the home's infrastructure is in: the connection type, the location of the electrical panel, and the distance the cable will need to cover. Only once the infrastructure is suitable can you look at questions of ease of use – including remote management via an app, if it's relevant to the household's routine.

How to decide whether it's a feature worth paying for

Before debating an app, it's worth asking a few simple questions about the routine at home:

  • Is there more than one electric car in the home using the station?
  • Do charging hours change from day to day, or are they roughly always the same?
  • Are you interested in scheduling charging for certain hours because of the electricity tariff or quiet at night?
  • Does someone in the household need to know remotely whether the car is ready, without going out to check physically?

If the answer to most of the questions is “not really” – the station will probably serve you well even if you don't open the app regularly, and there's no reason to choose a station just because of this feature. If the answer to some of the questions is “yes, that speaks to me” – it's a sign that remote management isn't a gimmick, but a real improvement to your routine.

What's better to check before focusing on the app

Before examining which stations offer an app and which don't, there are a few issues worth settling first: what power suits the home and the car, whether the electrical panel needs to be adapted, and what condition the existing infrastructure is in between the connection point and the actual station location. These are the questions that really determine the quality of everyday charging – far more than any remote monitoring feature.

That's exactly why at DSGCharge the process starts with an infrastructure check and tailoring the charging solution to the specific home, not just with presenting a catalog of stations with different features. A station with an app that's installed in a way that doesn't suit the home's infrastructure won't serve you well, even if its interface is convenient and well designed.

Anyone who wants to understand what suits their home – including whether remote management via an app is really relevant to their routine – can browse theEV charging stations and check which options are available, or contactDSGCharge for clarification before making a decision. There's also the About DSGCharge page for anyone who wants to understand the company's approach before moving on to the next step.

The next step – before deciding based on a single feature

Choosing a charging station shouldn't begin and end with the question of an app. The first step is to understand what's happening in the home – the connection type, the location of the electrical panel, the number of cars and the daily routine – and only then check which convenience features, including remote management, actually fit into that picture. A charging station that suits the home's infrastructure and routine will provide real value, regardless of whether it has a fancy app or not.

Anyone unsure what suits their specific case – with or without remote management – can get advice and a tailored charging solution before deciding on the type of station.

FAQ

Is a charging station without an app considered less advanced?
Not necessarily. Many stations offer stable and safe charging even without a full digital interface, and the power and suitability for the home's infrastructure are the components that determine charging quality, not the existence of an app.

If there's only one electric car in the home with a fixed routine, is there any point in an app?
In that case, actual use will be limited, because there's no uncertainty for remote management to solve. You can still use it occasionally, but it doesn't become a deciding factor in choosing the station.

How do I check whether a station with an app suits my home's infrastructure?
This is checked separately from the app question – you need to examine the connection type in the home, the station's distance from the electrical panel, and the suitable power, so it's recommended to carry out an infrastructure check before focusing on additional features.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar