Self-employed with an electric vehicle: how a home charging station changes your daily schedule compared with depending on public charging stations

An article for self-employed people and small business owners who use an electric vehicle for daily work, about the difference between depending on public charging stations and having home charging available, and how it affects the daily schedule, timetable and meetings.
Self-employed with an electric vehicle: how a home charging station changes your daily schedule compared with depending on public charging stations

Tuesday morning, a meeting at nine, and before that another stop at a public charging station because last night you didn't manage to get home in time. Sound familiar? It isn't a one-time glitch. It's the pattern that repeats itself every week for self-employed people and small business owners whose electric vehicle is a work tool, not just a way to get to the beach on the weekend.

The difference between those who charge at home and those who depend on public charging stations isn't just a matter of convenience. It affects how you plan a workday, how much time you're willing to devote to distant meetings, and even the decision whether to take a certain trip or postpone it until tomorrow.

The real problem: not a lack of stations, but a lack of control over your time

Israel today has quite a lot of public charging infrastructure, and it's true that the situation improves over the years. But a self-employed person who relies on a public charging station is constantly dependent on something they don't control: a line at the station, an occupied station, an extra drive just to charge, or scheduling an entire set of meetings around the location of a charging station rather than around actual business needs.

In contrast, someone who has a home charging station solves the problem at its root: the car sits and charges while they sleep, while they work from home, or between meetings when they come back to pick up documents. No dependence on outside availability, no line, and no need to plan the day around a station's location.

When do you actually feel the difference in your work routine

Take a self-employed sales agent who travels between clients in central Israel. A typical workday includes three to four meetings, drives between cities, and sometimes a return to the office or warehouse along the way. If the car wasn't charged overnight at home, every additional km during the day takes a little more off the available range – and at some point another consideration enters the planning: “where is there a charging station on the way, and how long will it take.” This is a consideration that a gasoline car owner simply doesn't know, and that a self-employed person with a home charging station doesn't have to deal with either – the car leaves in the morning with a full range, without depending on anything external.

The difference is even more pronounced for small business owners who use the vehicle for transporting goods, for meetings and for deliveries. Every hour spent on tasks that aren't the core of the business is an hour that doesn't generate income. When charging happens at night at home, the daytime hours remain free for what really matters.

What's actually checked at home before installing a station

Before making a decision, there are a few points that are important to understand – and this is true for both a private house and an apartment in an apartment building:

  • The type of connection in the electrical panel – single-phase or three-phase, because it directly affects the possible power of the charging station.
  • The distance between the parking space and the electrical panel, which affects the required cable length and the scope of the required work – whether conduits, drilling or excavation are needed.
  • The existing electrical load in the home, to make sure that adding a charging station doesn't create a load that requires special attention.
  • The actual parking location – whether it's a private parking space, a shared parking facility, or a place that requires coordination with a building committee.

These are all points that are checked in a preliminary infrastructure check, not something you can estimate at a quick glance. That's why at DSGCharge the matching process starts with checking these details, not with a generic quote that doesn't take the specific home into account.

Relying on public charging stations – an advantage and a limitation at the same time

It's important to say clearly: public charging stations and public charging are a legitimate and useful solution, mainly for long trips or when it's not possible to install a home charging station. But relying on them as the only solution for a regular workday creates dependence on a variable that isn't under your control – availability, location and lines. A self-employed person who needs to arrive at a meeting at an exact time can't afford to wait for an occupied station. This is the main difference: a home charging station is infrastructure you control, when it's convenient for you, and not when someone else is using it first.

What this actually means for choosing a station

Self-employed people and small business owners usually don't need the highest possible power, but a station that suits their driving routine and the existing electrical infrastructure at home. Some customers choose a station with medium power that suits a full overnight charge, and some choose a station with management and communication options, to know when the car is charging and to make sure charging finishes before they head out. In any case, the right choice starts with understanding the routine – how many km you drive per day, how many hours the car is parked at home, and what condition the infrastructure is in – and not with an arbitrary choice of power “because it's the most powerful there is.”

A short checklist before scheduling a consultation

  • How many km you drive on average on a workday, and how many hours the car is parked at home between trips
  • Whether your parking space is private, shared, or requires coordination with a building committee
  • What type of connection your electrical panel has – single-phase or three-phase
  • What the distance is between the parking space and the electrical panel
  • Whether there's a need for a management solution or communication with the station, for example tracking charging times

Once you have answers to these points, the conversation with a professional becomes much more focused and faster – rather than a general guess.

How this actually connects to a solution

atDSGCharge The approach isn't to sell a station and be done, but to understand the driving routine and the home infrastructure before recommending a solution. There's a real difference between a charging station chosen correctly for your needs and a station chosen because it's the most popular one at the moment. Before installation, the existing infrastructure is checked, the location of the panel and the parking space is examined, and a solution is offered that suits how often you're on the road and how long the car is parked at home. Anyone who wants to start the process can browse the availableEV charging stations , or also check out accessory charging cables if a special cable length is needed depending on the distance from the panel. If you prefer to understand the process first and only then choose a product, you can also get an impression ofAbout DSGCharge and of the way the company tailors charging solutions to different projects.

It's important to remember that even after choosing the right charging station, the installation itself must be carried out by a certified electrician in accordance with the requirements of the law and the standard, since every installation involves connecting to the home's electrical panel and working with electrical voltage.

In summary: time is worth more than price

For a self-employed person or small business owner, the electric vehicle is a work tool, and every minute wasted looking for a charging station or waiting your turn is a minute that doesn't come back. A home charging station doesn't just solve a technical problem – it gives you back control over your day, and lets you plan meetings and trips according to business needs, not according to the location of a public charging station. If you recognize yourself in this description – the next step isn't to pick a station off the shelf, but to get a recommendation based on your home infrastructure and your driving routine. You can start by requesting advice and a tailored charging solution, and check what exactly suits your home and electrical situation.

FAQ

Does a home charging station really save significant time for a self-employed person who drives a lot?
It depends on your driving routine, but in most cases charging at home while the car isn't in use – for example at night – eliminates the need to plan dedicated charging stops during the workday, which leaves more free time for meetings and actual work.

What What if my parking space is in an apartment building and not in a private house?
In this case too a charging station can be installed, but the process includes an infrastructure check and in some cases coordination with the building committee, to make sure the installation suits the structure of the parking facility and the shared electrical infrastructure.

How do I know which station power suits me as a self-employed person?
The suitable power is derived from how many hours the car is parked at home and how much charging it needs on an average day, not just from the vehicle itself. A consultation with a professional checks this data before recommending a specific station.

Share the article:

Already more than

0 +

stations installed

Let us help you

We promise to get back to you in record time with a winning offer!

Which product are you interested in?
  • The cost of a home charging station varies by brand and the station's charging power. There are three charging station power levels: 7kW, 11kW, 22kW (single-phase).

    7kW charging stations are recommended for charging plug-in hybrids (gasoline/diesel-electric) and/or cars that can't charge on three-phase. They aren't recommended for charging an EV, since the time needed to charge an EV will be long. 

    The price of charging stations is affected not only by the station's power but also by whether it has a display and whether it's a smart station managed through a mobile app.

    The price of a simple charging station starts at about ₪1,690 (a promotion at our company for a smart three-phase charging station. The lowest price in Israel!) for 11kW and can reach about ₪4,200 for a 22kW smart station. 

    The price of public charging stations is completely different and is affected by the charging rate, the ability to communicate with computer systems and billing systems. 

    The price of a fast (DC) station runs from tens to hundreds of thousands of shekels.

    The prices above refer to the charging station only and do not include installation. 

  • The cost of charging an EV is significantly lower than fueling a car with a combustion engine (gasoline/diesel). The price per kWh on the residential tariff is 62 agorot (06/2024).

    The cost of driving an EV is around 10% of the cost of driving a combustion-engine car, and that's before accounting for routine servicing, which an EV doesn't need.

    The price of public charging is higher than home charging and is around ₪2.5 per kWh. Despite the higher price at a public station, charging at a public station is still about 60 percent cheaper than fueling a combustion-engine car.  

    There's no doubt that electric charging costs allow cheap driving and may save about ₪15,000 a year, based on driving 20,000 km a year.

    In addition to the savings on driving costs, it's important to emphasize that the annual license fee for an EV is ₪537, while the annual license fee for a combustion-engine and/or plug-in car can reach ₪4,700.

    Bear in mind that the state has already announced that in 2025 a mileage tax (15-25 agorot) will be imposed on EVs. The tax will probably be paid according to the car's odometer at the annual inspection. Even after the mileage tax is imposed, there will be large gaps in driving costs.

  • The cost of installing a home charging station varies by installation location, existing infrastructure, the distance between the electrical panel and the charging station, and the construction work required.

    A distinction should be made between installation in a private house (ground level) and installation in an apartment building. 

    Installation in a private house is simpler, but it too may require laying infrastructure, construction work, chiseling and adjustments.

    Installation in an apartment building is different: it requires a survey of the installation site (virtual/physical) and a signed confirmation that the building committee does not object to the installation. Installation costs in an apartment building are higher than in a private house, and in most cases installation requires construction work, chiseling and adjustments.

    A basic installation starts at ₪2,990 and can reach higher amounts depending on the installation requirements.

    The basic installation price includes laying up to 30 meters of cable. Each additional meter requires an extra charge depending on the station type. In every installation the company installs components in the electrical panel, a circuit breaker and an RCD (Type A), and near the charging station we install an isolating switch. All the company's charging stations are protected against DC leakage current. 

    According to the customer's needs, a meter (kW) can also be installed. A meter is needed when the electricity feeding the station comes from the building's general electrical panel and the building committee must be paid for the electricity consumed. It's important to emphasize that the building committee is not obligated to agree to powering the charging station from the common panel. 

    Each customer can decide whether they want installation by the company and/or prefer to install independently through a certified electrician.

    Installation by the company extends the station's warranty by another year, i.e. 12 additional months.

  • We've encountered quite a few cases where customers living in older houses have a single-phase home electricity network.

     

    The question is whether an EV can be charged from a single-phase home network. The answer is yes, but charging will be slower.

     

    A separate line from the panel must be laid to the charging station. A 16A line allows charging at 3.68kW per hour. A 25A line allows charging at 5.75kW per hour and a 32A line allows charging at 7.4kW.

    EV batteries are typically between 50-80 kWh. 

    This means that if the home had three-phase electricity the car would charge in 5-7 hours, while on a single-phase home network the car can be charged

    16 – 21 hours on a 16A line

    10 – 14 hours on a 32A line.

    Needless to say, the car is usually charged when the battery is around 50%, so the car can also be charged on a home network within one night. 

  • The charging time of the car battery varies by the charging infrastructure and the size of the car's battery.  

    Plug-in hybrid batteries are small batteries that charge on 3.7kW single-phase charging stations within up to three hours. 

    EVs are equipped with larger batteries that can exceed 80kW in cars with a driving range of about 450 km. 

    95% of cars on the market today support a charging rate of 11kW. 

    For a car to charge at a faster rate, two conditions must be met together: 

    A. The car can charge at a rate of 22kW.

    B. The electricity network supports charging at 32A and above, i.e. three-phase 40A and above. 

    However, you can ask the IEC to upgrade the infrastructure, allowing the use of more powerful charging stations: 22kW. 

    Even if the electricity feed currently supports three-phase 25A, it can be expanded through the IEC. The estimated cost of expanding from 25A to 40A is about ₪3,000. 

    All of the above isn't relevant to fast (DC) charging stations, which operate at high charging power of 30-350kW. These stations allow charging about 80 percent of battery capacity within minutes.

  • Deciding the charging station location is an important decision that should be guided by where the car parks and the existing infrastructure.

    The distance of the charging station from the electrical panel matters, as do the car's parking spot and the length of the station's cable, which is usually limited to five meters. 

    If you don't park the car in covered parking, the station needs a high level of water and dust sealing: IP54 and above. At our company all stations are resistant to rain and weather conditions. 

    If the station is installed outside the house, it's important to know that a charging pedestal will usually be needed, and its installation involves an extra charge. 

  • A three-phase connection at home isn't mandatory. There are single-phase charging stations that will charge the car, but charging with them will be slow. Single-phase charging stations are mainly suited to plug-in hybrids.

    If you have the option and the home's infrastructure allows a three-phase connection, it's better to install a three-phase charging station. Such a station allows fast charging of the car. 

    If your car requires a single-phase charging station, chances are that your next car will already need a three-phase charging station, so we recommend saving a future installation and station replacement by installing a three-phase charging station today.

  • When choosing a station, you must take into account:

    1. Is it a fully electric car or a plug-in hybrid: If the car is fully electric, a three-phase station should be installed. If the car is a plug-in hybrid, a single-phase station is enough. 
    2. Does the station include a holder for the charging cable: Stations that provide space for coiling and storing the cable protect it from wear and damage. 
    3. Locking mechanism: If the station will be located outside the house, it's important that it can be locked.
    4. Size and appearance: This is of course a matter of personal taste, but since there's a wide range of charging stations there's no reason to compromise on appearance. 
  • The IP rating is a classification of the degree of protection and sealing of the station against dust and water. The rating consists of the letters IP and two digits, defined by the IEC 60529 standard of the International Electrotechnical Commission. The first digit rates sealing against dust and the second digit rates sealing against water.

    IP54: dust can enter but doesn't interfere with the station. The station is sealed against water at 10 liters/minute at a pressure of 80-100 kilopascals. 

    IP55: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP65: dust doesn't enter the station. The station is resistant to water at 12.5 liters/minute at a pressure of 30 kilopascals from a distance of 3 meters.

    IP67: dust doesn't enter the station. The station is resistant to immersion in water at a depth of 1 meter for 30 minutes.

    Stations installed in an uncovered location should have a sealing level of IP55-67.

  • All the company's products are sold with a 24-month warranty, with the option to extend the warranty up to 60 months.

    If the station is installed by the company's installation team, the customer receives a gift of 12 additional warranty months, for a total of 36 months of warranty. 

    The company allows extending the warranty on stations up to 60 months.

    Because the company is confident in the quality of its products, which have been sold in Europe for many years (France, Germany and more), it offers a warranty extension at a nominal price of ₪499  for an additional 24 months. The warranty extension is possible up to 7 days from the station installation date. 

Accessibility Toolbar